WisDOT contract 20260113043 bid tabulation
Fountain City - Alma; Waumandee Creek Bridge B-06-0059 (STH 035, Buffalo County Fountain City - Alma). Let by Wisconsin DOT on January 13, 2026, Buffalo. 3 bids received; low bid $554,732 by Lunda Construction Company.
- Owner
- Wisconsin DOT
- Letting
- 13 JAN 2026
- Pay items
- 68
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lunda Construction Company | $554,732 | Low |
| 2 | Zenith Tech., Inc. - Waukesha | $597,695 | +8.0% |
| 3 | Pciroads, LLC | $606,778 | +9.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lunda Construction Company | 2. Zenith Tech., Inc. - Waukesha | 3. Pciroads, LLC |
|---|---|---|---|---|---|---|
| 1 | Abatement of asbestos containing material (structure) 01. B-06-0059 (203.0211.S) | EACH | 1 | $10,000 | $10,000 | $8,000.00 |
| 2 | Removing structure over waterway minimal debris (structure) 01. B-06- 0059 (203.0260) | EACH | 1 | $40,000 | $30,000 | $25,000 |
| 3 | Debris containment over waterway (structure) 01. B-06-0059 (203.0335) | EACH | 1 | $500.00 | $1.00 | $1,000.00 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 17 | $9.84 | $9.84 | $18.00 |
| 5 | Removing asphaltic surface milling (204.0120) | SY | 175 | $9.84 | $9.84 | $18.00 |
| 6 | Removing curb & gutter (204.0150) | LF | 21 | $21.00 | $15.00 | $21.00 |
| 7 | Removing surface drains (204.0190) | EACH | 1 | $300.00 | $750.00 | $300.00 |
| 8 | Excavation common (205.0100) | CY | 110 | $67.50 | $33.50 | $67.50 |
| 9 | Excavation for structures bridges (structure) 01. B-06-0059 (206.1001) | EACH | 1 | $25,000 | $10,000 | $8,000.00 |
| 10 | Backfill structure type A (210.1500) | TON | 70 | $49.00 | $45.00 | $49.00 |
| 11 | Finishing roadway (project) 01. 7160-00-72 (213.0100) | EACH | 1 | $1,160.00 | $100.00 | $1,160.00 |
| 12 | Base aggregate dense 3/4-inch (305.0110) | TON | 7 | $68.50 | $184.50 | $68.50 |
| 13 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 125 | $51.00 | $37.85 | $51.00 |
| 14 | Concrete pavement 12-inch (415.0120) | SY | 74 | $152.64 | $152.64 | $152.64 |
| 15 | Concrete pavement approach slab (415.0410) | SY | 111 | $287.06 | $287.06 | $287.06 |
| 16 | Tack coat (455.0605) | GAL | 15 | $40.30 | $40.30 | $40.30 |
| 17 | Asphaltic surface (465.0105) | TON | 40 | $488.30 | $488.30 | $488.30 |
| 18 | Concrete masonry bridges (502.0100) | CY | 9 | $1,350.00 | $5,000.00 | $4,358.00 |
| 19 | Protective surface treatment (502.3200) | SY | 865 | $5.00 | $4.25 | $6.00 |
| 20 | Pigmented surface sealer (502.3210) | SY | 11 | $20.00 | $50.00 | $75.00 |
| 21 | Adhesive anchors no. 5 bar (502.4205) | EACH | 20 | $25.00 | $45.00 | $32.00 |
| 22 | Bar steel reinforcement HS coated structures (505.0600) | LB | 1,460 | $5.00 | $4.50 | $3.00 |
| 23 | Preparation decks type 1 (509.0301) | SY | 100 | $150.00 | $190.00 | $270.00 |
| 24 | Preparation decks type 2 (509.0302) | SY | 40 | $180.00 | $290.00 | $295.00 |
| 25 | Cleaning decks (509.0500) | SY | 865 | $33.89 | $45.00 | $24.47 |
| 26 | Concrete surface repair (509.1500) | SF | 50 | $200.00 | $200.00 | $185.00 |
| 27 | Full-depth deck repair (509.2000) | SY | 2 | $500.00 | $550.00 | $500.00 |
| 28 | Concrete masonry overlay decks (509.2500) | CY | 62 | $1,200.00 | $1,400.00 | $2,246.92 |
| 29 | Rubberized membrane waterproofing (516.0500) | SY | 18 | $25.00 | $45.00 | $140.00 |
| 30 | Concrete curb & gutter 4-inch sloped 30-inch type TBT (601.0584) | LF | 26 | $67.64 | $67.64 | $67.64 |
| 31 | Concrete surface drains (602.3010) | CY | 1 | $1,597.50 | $1,597.50 | $1,597.50 |
| 32 | Concrete barrier temporary precast delivered (603.8000) | LF | 500 | $15.00 | $18.20 | $21.00 |
| 33 | Concrete barrier temporary precast installed (603.8125) | LF | 970 | $5.00 | $8.72 | $11.00 |
| 34 | Riprap medium (606.0200) | CY | 2 | $185.00 | $450.00 | $185.00 |
| 35 | Anchor assemblies for steel plate beam guard (614.0150) | EACH | 2 | $175.00 | $400.00 | $550.00 |
| 36 | Adjusting steel plate beam guard (614.0400) | LF | 136 | $22.25 | $22.25 | $22.25 |
| 37 | Crash cushions temporary (614.0905) | EACH | 4 | $1,529.31 | $1,529.31 | $4,900.00 |
| 38 | Replacing guardrail posts and blocks (614.0950) | EACH | 36 | $160.00 | $160.00 | $160.00 |
| 39 | Maintenance and repair of haul roads (project) 01. 7160-00-72 (618.0100) | EACH | 1 | $0.01 | $1.00 | $500.00 |
| 40 | Mobilization (619.1000) | EACH | 1 | $147,935 | $150,000 | $105,049 |
| 41 | Water (624.0100) | MGAL | 2 | $135.00 | $25.00 | $135.00 |
| 42 | Silt fence (628.1504) | LF | 470 | $3.35 | $3.35 | $3.35 |
| 43 | Silt fence maintenance (628.1520) | LF | 940 | $0.15 | $0.15 | $0.15 |
| 44 | Mobilizations erosion control (628.1905) | EACH | 4 | $250.00 | $250.00 | $250.00 |
| 45 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $125.00 | $125.00 | $125.00 |
| 46 | Field office type B (642.5001) | EACH | 1 | $3,500.00 | $7,500.00 | $12,000 |
| 47 | Traffic control drums (643.0300) | DAY | 3,509 | $0.25 | $0.25 | $0.55 |
| 48 | Traffic control barricades type III (643.0420) | DAY | 130 | $2.02 | $2.02 | $1.00 |
| 49 | Traffic control warning lights type C (643.0715) | DAY | 2,363 | $0.19 | $0.19 | $0.10 |
| 50 | Traffic control signs (643.0900) | DAY | 3,900 | $0.46 | $0.46 | $2.00 |
| 51 | Traffic control signs PCMS (643.1050) | DAY | 14 | $62.13 | $62.13 | $90.00 |
| 52 | Temporary marking line paint 6- inch (643.3165) | LF | 5,353 | $1.40 | $1.40 | $0.50 |
| 53 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 105 | $12.45 | $12.45 | $5.25 |
| 54 | Traffic control (643.5000) | EACH | 1 | $4,210.80 | $4,210.80 | $2,500.00 |
| 55 | Geotextile type R (645.0130) | SY | 6 | $20.00 | $12.00 | $20.00 |
| 56 | Marking line epoxy 6-inch (646.2020) | LF | 936 | $6.00 | $6.00 | $6.95 |
| 57 | Construction staking subgrade (650.4500) | LF | 90 | $0.01 | $0.05 | $0.05 |
| 58 | Construction staking base (650.5000) | LF | 41 | $0.01 | $1.00 | $1.00 |
| 59 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 26 | $5.00 | $3.00 | $3.00 |
| 60 | Construction staking structure layout (structure) 01. B-06-0059 (650.6501) | EACH | 1 | $2,000.00 | $1,100.00 | $1,100.00 |
| 61 | Construction staking supplemental control (project) 01. 7160-00-72 (650.9911) | EACH | 1 | $1,000.00 | $900.00 | $900.00 |
| 62 | Construction staking slope stakes (650.9920) | LF | 90 | $1.00 | $1.00 | $1.00 |
| 63 | Temporary traffic signals for bridges (structure) 01. B-06-0059 (661.0101) | EACH | 1 | $16,279 | $16,279 | $7,950.00 |
| 64 | Sawing asphalt (690.0150) | LF | 110 | $2.95 | $2.95 | $2.95 |
| 65 | Incentive strength concrete structures (715.0502) | DOL | 500 | $1.00 | $1.00 | $1.00 |
| 66 | Installing and maintaining bird deterrent system (station) 01. 596+49 (999.2000.S) | EACH | 1 | $1.00 | $1.00 | $3,000.00 |
| 67 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 300 | $5.00 | $5.00 | $5.00 |
| 68 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 300 | $5.00 | $5.00 | $5.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of January 13, 2026. Compiled by Mirage Metrics.