WisDOT contract 20260113055 bid tabulation

Ashland - Bayfield; Engoe Road Intersection (STH 013, Bayfield County Ashland - Washburn). Let by Wisconsin DOT on January 13, 2026, Bayfield. 5 bids received; low bid $1,047,748 by Northern Interstate Construction, Inc..

Owner
Wisconsin DOT
Letting
13 JAN 2026
Pay items
73
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Northern Interstate Construction, Inc.$1,047,748Low
2McCabe Construction, Inc.$1,111,800+6.0%
3Ritola Inc$1,147,942+10%
4Tri-City Contractors, Inc$1,188,887+13%
5James Peterson Sons, Inc.$1,193,776+14%
WisDOT contract 20260113055: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Northern Interstate Construction, Inc.2. McCabe Construction, Inc.3. Ritola Inc4. Tri-City Contractors, Inc5. James Peterson Sons, Inc.
1Clearing (201.0110)SY455$10.00$8.70$6.40$16.00$25.00
2Grubbing (201.0210)SY455$10.50$4.15$5.02$14.00$14.00
3Removing small pipe culverts (203.0100)EACH2$1,270.94$1,410.00$591.46$3,500.00$1,231.00
4Removing concrete pavement (204.0100)SY250$12.00$15.00$12.68$19.00$25.00
5Removing asphaltic surface butt joints (204.0115)SY64$28.00$3.35$19.64$7.00$25.00
6Removing asphaltic surface milling (204.0120)SY5,850$3.75$2.00$4.46$3.10$4.39
7Removing curb & gutter (204.0150)LF154$5.31$6.40$6.07$9.00$7.50
8Excavation common (205.0100)CY9,798$13.45$19.00$18.92$22.00$20.13
9Temporary lane shift during culvert work (208.1500.S)EACH1$6,810.50$7,860.00$2,596.26$9,000.00$13,253
10Backfill granular grade 1 (209.1100)CY5,280$21.00$26.00$23.26$29.00$24.12
11Finishing roadway (project) 01. 8160-00-79 (213.0100)EACH1$1.00$1,305.00$4,183.65$500.00$3,000.00
12Base aggregate dense 3/4-inch (305.0110)TON410$31.67$38.00$38.20$38.50$42.20
13Base aggregate dense 1 1/4-inch (305.0120)TON3,900$24.00$24.80$30.01$32.50$26.63
14Tack coat (455.0605)GAL810$3.71$3.84$3.72$3.80$3.66
15Incentive density HMA pavement (460.2000)DOL1,340$1.00$1.00$1.00$1.00$1.00
16HMA pavement 4 MT 58-34 S (460.6244)TON2,090$119.16$123.60$123.97$121.00$117.69
17Asphaltic rumble strips, shoulder (465.0520)LF3,360$1.00$1.05$1.03$1.10$0.89
18Apron endwalls for culvert pipe 30- inch (520.1030)EACH2$1,534.95$950.00$1,267.44$1,580.00$685.00
19Culvert pipe class III-A 30-inch (520.3330)LF92$366.17$281.00$425.55$214.00$415.32
20Apron endwalls for culvert pipe steel 18-inch (521.1018)EACH2$867.06$260.00$659.02$980.00$265.00
21Culvert pipe corrugated steel 18- inch (521.3118)LF44$129.90$49.00$104.52$123.00$55.00
22Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557)LF163$65.74$68.20$65.93$71.00$64.93
23Concrete surface drains (602.3010)CY3$1,610.73$1,670.00$1,615.30$1,650.00$1,590.84
24Concrete barrier temporary precast delivered (603.8000)LF1,830$16.79$17.65$17.97$17.30$16.79
25Concrete barrier temporary precast installed (603.8125)LF1,830$7.70$8.10$8.24$8.00$7.70
26Anchoring concrete barrier temporary precast (603.8500)LF1,830$11.25$11.80$12.04$11.60$11.25
27Riprap light (606.0100)CY2$487.11$200.00$433.63$270.00$130.49
28Riprap medium (606.0200)CY5$319.72$200.00$257.73$270.00$125.65
29Crash cushions temporary (614.0905)EACH2$5,809.11$3,475.00$7,422.38$5,000.00$4,750.00
30Maintenance and repair of haul roads (project) 01. 8160-00-79 (618.0100)EACH1$1.00$1.00$5.00$500.00$150.00
31Mobilization (619.1000)EACH1$92,023$77,602$72,251$112,000$127,900
32Water (624.0100)MGAL116$27.05$46.00$18.87$10.00$50.00
33Topsoil (625.0100)SY9,470$4.32$5.50$2.96$0.01$4.72
34Mobilizations erosion control (628.1905)EACH2$255.00$2,220.00$350.73$2,720.00$2,115.00
35Mobilizations emergency erosion control (628.1910)EACH1$357.00$105.00$350.73$105.00$100.00
36Erosion mat class I type B (628.2004)SY9,470$1.50$1.00$1.72$1.00$0.95
37Temporary ditch checks (628.7504)LF190$4.58$7.35$7.07$7.50$7.00
38Culvert pipe checks (628.7555)EACH7$15.30$18.40$15.75$18.00$17.50
39Fertilizer type B (629.0210)CWT6$117.30$142.30$123.65$141.00$135.50
40Seeding mixture no. 20 (630.0120)LB270$8.42$8.80$8.45$9.00$8.40
41Seeding temporary (630.0200)LB270$17.71$5.00$4.09$5.00$4.75
42Markers culvert end (633.5200)EACH2$51.00$78.75$50.77$80.00$75.00
43Posts wood 4X6-inch X 12-FT (634.0612)EACH1$86.70$90.30$86.31$91.00$86.00
44Posts wood 4X6-inch X 14-FT (634.0614)EACH2$96.90$96.45$96.46$97.00$91.85
45Posts wood 4X6-inch X 16-FT (634.0616)EACH4$107.10$102.60$106.61$103.00$97.70
46Moving signs type II (638.2102)EACH5$76.88$75.10$84.07$75.00$71.50
47Field office type B (642.5001)EACH1$8,500.00$8,000.00$7,676.22$9,000.00$10,000
48Traffic control drums (643.0300)DAY1,296$0.77$0.45$0.80$0.80$0.75
49Traffic control barricades type III (643.0420)DAY729$0.77$1.25$0.80$0.80$0.75
50Traffic control warning lights type A (643.0705)DAY1,134$0.10$0.35$0.11$0.11$0.10
51Traffic control warning lights type C (643.0715)DAY972$0.10$0.42$0.11$0.11$0.10
52Traffic control signs (643.0900)DAY3,240$2.02$0.80$2.14$2.20$2.00
53Temporary marking line paint 6- inch (643.3165)LF5,170$0.39$1.30$1.23$0.40$0.36
54Traffic control (643.5000)EACH1$2,200.00$8,690.00$24,775$3,500.00$2,000.00
55Geotextile type HR (645.0120)SY14$5.23$8.00$11.29$9.00$30.00
56Geotextile type R (645.0130)SY30$4.65$7.50$6.31$8.00$30.00
57Marking line grooved wet ref epoxy 6-inch (646.2040)LF10,140$2.04$2.10$2.03$2.10$2.00
58Marking line grooved wet ref epoxy 10-inch (646.4040)LF380$2.75$2.85$3.30$3.00$2.70
59Marking arrow epoxy (646.5020)EACH2$357.00$367.50$355.38$400.00$350.00
60Marking word epoxy (646.5120)EACH1$367.20$378.00$365.53$400.00$360.00
61Marking diagonal epoxy 12-inch (646.7120)LF380$10.50$7.35$7.11$8.00$7.00
62Marking removal line 6-inch (646.9002)LF7,200$1.00$0.37$0.91$1.00$0.90
63Construction staking subgrade (650.4500)LF2,118$0.55$0.01$0.30$0.01$0.01
64Construction staking base (650.5000)LF2,118$1.08$1.05$1.00$1.10$1.00
65Construction staking curb gutter and curb & gutter (650.5500)LF163$3.03$3.15$3.50$3.30$3.00
66Construction staking pipe culverts (650.6000)EACH1$330.00$315.00$500.00$330.00$300.00
67Construction staking supplemental control (project) 01. 8160-00-79 (650.9911)EACH1$1,100.00$1,050.00$2,000.00$1,100.00$1,000.00
68Construction staking slope stakes (650.9920)LF2,118$1.08$1.05$1.08$1.10$1.00
69Sawing asphalt (690.0150)LF1,985$2.63$1.85$1.78$3.50$1.75
70Sawing concrete (690.0250)LF40$4.88$3.40$3.30$4.50$3.25
71On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS1,200$5.00$5.00$5.00$5.00$5.00
72On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS300$5.00$5.00$5.00$5.00$5.00
73Special 01. asphaltic rumble strip filling (SPV.0090)LF2,400$8.03$8.35$8.05$8.50$7.93
WisDOT contract 20260113055: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of January 13, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy