WisDOT contract 20260210001 bid tabulation
Statewide Type 1 Sign Replacement; Locations On Stn Per Annual Plan (VAR HWY, Statewide Statewide Type I Sign Replacement). Let by Wisconsin DOT on February 10, 2026, Statewide. 3 bids received; low bid $696,923 by Mattison Contractors, Inc..
- Owner
- Wisconsin DOT
- Letting
- 10 FEB 2026
- Pay items
- 10
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Mattison Contractors, Inc. | $696,923 | Low |
| 2 | Arbor Green, Inc. | $764,462 | +10% |
| 3 | Highway Landscapers, Inc. | $878,958 | +26% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Mattison Contractors, Inc. | 2. Arbor Green, Inc. | 3. Highway Landscapers, Inc. |
|---|---|---|---|---|---|---|
| 1 | Mobilization (619.1000) | EACH | 1 | $37,860 | $52,000 | $100,500 |
| 2 | Sign supports shorten structural steel (635.9010.S) | EACH | 8 | $231.00 | $250.00 | $450.00 |
| 3 | Sign supports replacing base connection bolts legacy system (635.9020.S) | EACH | 76 | $200.00 | $125.00 | $430.00 |
| 4 | Signs type I reflective SH (637.1220) | SF | 19,110.50 | $28.25 | $27.00 | $28.22 |
| 5 | Signs type I reflective F (637.1230) | SF | 266 | $28.25 | $27.50 | $28.22 |
| 6 | Signs type II reflective SH (637.2220) | SF | 247 | $28.60 | $20.50 | $27.32 |
| 7 | Removing signs type I (638.2601) | EACH | 138 | $255.00 | $300.00 | $250.00 |
| 8 | Removing signs type II (638.2602) | EACH | 5 | $35.00 | $100.00 | $150.00 |
| 9 | Removing structural steel sign supports (638.3100) | EACH | 2 | $100.00 | $350.00 | $937.50 |
| 10 | Special 01. traffic control (SPV.0060) | EACH | 1 | $52,000 | $130,000 | $151,500 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of February 10, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.