WisDOT contract 20260210007 bid tabulation
Windsor - Bristol; Snowy Owl Court to CTH N (CTH V, Dane County Windsor - Bristol). Let by Wisconsin DOT on February 10, 2026, Dane. 8 bids received; low bid $5,064,056 by Rock Road Companies, Inc..
- Owner
- Wisconsin DOT
- Letting
- 10 FEB 2026
- Pay items
- 129
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rock Road Companies, Inc. | $5,064,056 | Low |
| 2 | Payne and Dolan, Inc | $5,065,692 | 0.0% |
| 3 | Michels Road & Stone, Inc. | $5,211,390 | +3.0% |
| 4 | Mashuda Contractors, Inc. | $5,305,524 | +5.0% |
| 5 | James Peterson Sons, Inc. | $5,381,405 | +6.0% |
| 6 | Meise Construction Inc | $5,388,416 | +6.0% |
| 7 | Tri-County Paving, Inc. | $5,622,442 | +11% |
| 8 | Integrity Grading and Excavating, Inc. | $5,849,752 | +16% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rock Road Companies, Inc. | 2. Payne and Dolan, Inc | 3. Michels Road & Stone, Inc. | 4. Mashuda Contractors, Inc. | 5. James Peterson Sons, Inc. | 6. Meise Construction Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 36 | $225.00 | $265.00 | $265.00 | $265.00 | $360.00 | $567.00 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 54 | $401.06 | $670.00 | $500.00 | $350.00 | $650.00 | $665.00 |
| 3 | Removing structure (structure) 01. 71"X47" pipe arch, 69+30 (203.0220) | EACH | 1 | $1,604.23 | $2,000.00 | $3,640.00 | $1,000.00 | $3,500.00 | $1,995.00 |
| 4 | Removing structure (structure) 02. 48"X24" box, 10+75 'PO' RT (203.0220) | EACH | 1 | $1,604.23 | $1,000.00 | $2,120.00 | $800.00 | $5,928.20 | $3,300.00 |
| 5 | Removing structure (structure) 03. 48"X24" box, 11+30 'PO' (203.0220) | EACH | 1 | $1,604.23 | $1,000.00 | $2,120.00 | $800.00 | $5,928.20 | $3,300.00 |
| 6 | Removing structure (structure) 04. 24"X24" box, 156+40 (203.0220) | EACH | 1 | $1,604.23 | $1,000.00 | $1,240.00 | $700.00 | $2,964.10 | $2,500.00 |
| 7 | Removing structure (structure) 05. 72"X24" box, 229+50 (203.0220) | EACH | 1 | $3,208.46 | $3,000.00 | $2,505.00 | $800.00 | $9,356.40 | $4,620.00 |
| 8 | Removing structure (structure) 06. 48"X24" box, 274+00 (203.0220) | EACH | 1 | $1,604.23 | $1,000.00 | $2,120.00 | $800.00 | $4,428.20 | $3,300.00 |
| 9 | Removing concrete pavement (204.0100) | SY | 100 | $10.00 | $11.50 | $10.00 | $10.00 | $9.06 | $4.50 |
| 10 | Removing asphaltic surface butt joints (204.0115) | SY | 617 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $7.65 |
| 11 | Removing asphaltic surface milling (204.0120) | SY | 1,486 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $1.00 |
| 12 | Removing curb & gutter (204.0150) | LF | 490 | $7.17 | $7.60 | $6.00 | $2.80 | $3.21 | $5.00 |
| 13 | Removing guardrail (204.0165) | LF | 315 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 14 | Removing fence (204.0170) | LF | 2,575 | $1.25 | $1.25 | $1.25 | $1.25 | $1.25 | $3.00 |
| 15 | Removing delineators and markers (204.0180) | EACH | 24 | $20.00 | $20.00 | $20.00 | $20.00 | $20.00 | $20.00 |
| 16 | Excavation common (205.0100) | CY | 44,143 | $12.36 | $13.25 | $9.00 | $11.89 | $10.39 | $15.51 |
| 17 | Backfill granular grade 2 (209.2500) | TON | 4,588 | $15.53 | $17.00 | $14.80 | $16.50 | $18.86 | $13.40 |
| 18 | Prepare foundation for asphaltic paving (project) 01. 6218-00-74 (211.0101) | EACH | 1 | $0.01 | $100.00 | $2,000.00 | $100.00 | $100.00 | $63,000 |
| 19 | Finishing roadway (project) 01. 6218-00-74 (213.0100) | EACH | 1 | $5,041.22 | $100.00 | $5,000.00 | $1,600.00 | $5,500.00 | $5,000.00 |
| 20 | Base aggregate dense 3/4-inch (305.0110) | TON | 4,490 | $19.02 | $22.50 | $18.50 | $17.68 | $18.28 | $18.31 |
| 21 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 43,326 | $15.79 | $12.50 | $14.00 | $16.65 | $16.25 | $12.83 |
| 22 | Base aggregate dense 3-inch (305.0130) | TON | 16,300 | $13.88 | $12.50 | $14.00 | $14.97 | $17.14 | $12.83 |
| 23 | Tack coat (455.0605) | GAL | 12,656 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 24 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 2 | $3,500.00 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 25 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 2 | $3,500.00 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 26 | Incentive density PWL HMA pavement (460.2005) | DOL | 21,640 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 27 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 11,050 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 28 | Incentive air voids HMA pavement (460.2010) | DOL | 34,350 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 29 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 20,597 | $57.20 | $62.35 | $56.45 | $56.45 | $56.45 | $56.45 |
| 30 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 13,747 | $62.95 | $65.20 | $64.70 | $64.70 | $64.70 | $64.70 |
| 31 | Asphaltic surface patching (465.0110) | TON | 5 | $153.51 | $150.00 | $150.00 | $150.00 | $150.00 | $150.00 |
| 32 | Asphaltic surface driveways and field entrances (465.0120) | TON | 143 | $135.73 | $185.00 | $185.00 | $185.00 | $185.00 | $213.00 |
| 33 | Apron endwalls for culvert pipe steel 15-inch (521.1015) | EACH | 22 | $441.09 | $770.00 | $185.00 | $351.00 | $230.98 | $459.00 |
| 34 | Apron endwalls for culvert pipe steel 18-inch (521.1018) | EACH | 56 | $469.23 | $810.00 | $235.00 | $421.00 | $258.60 | $484.00 |
| 35 | Apron endwalls for culvert pipe steel 30-inch (521.1030) | EACH | 2 | $934.63 | $1,000.00 | $620.00 | $760.00 | $425.43 | $738.00 |
| 36 | Apron endwalls for culvert pipe steel 54-inch (521.1054) | EACH | 2 | $2,486.17 | $2,000.00 | $1,840.00 | $2,050.00 | $2,091.39 | $1,802.00 |
| 37 | Apron endwalls for culvert pipe steel 60-inch (521.1060) | EACH | 1 | $3,404.76 | $4,000.00 | $3,330.00 | $2,900.00 | $3,177.07 | $2,644.00 |
| 38 | Apron endwalls for pipe arch steel 21X15-inch (521.1221) | EACH | 2 | $459.10 | $800.00 | $225.00 | $450.00 | $248.66 | $455.00 |
| 39 | Apron endwalls for pipe arch steel 35X24-inch (521.1235) | EACH | 8 | $837.83 | $950.00 | $527.00 | $670.00 | $608.40 | $749.00 |
| 40 | Apron endwalls for pipe arch steel 71X47-inch (521.1271) | EACH | 2 | $3,137.96 | $3,000.00 | $3,075.00 | $2,770.00 | $2,915.19 | $2,400.00 |
| 41 | Culvert pipe corrugated steel 15- inch (521.3115) | LF | 418 | $62.26 | $52.00 | $41.80 | $53.00 | $73.92 | $75.79 |
| 42 | Culvert pipe corrugated steel 18- inch (521.3118) | LF | 1,191 | $65.76 | $56.00 | $53.50 | $58.50 | $82.41 | $79.50 |
| 43 | Culvert pipe corrugated steel 30- inch (521.3130) | LF | 76 | $189.79 | $110.00 | $148.00 | $141.00 | $170.39 | $118.50 |
| 44 | Culvert pipe corrugated steel 54- inch (521.3154) | LF | 72 | $340.78 | $170.00 | $239.00 | $302.00 | $286.40 | $199.00 |
| 45 | Culvert pipe corrugated steel 60- inch (521.3160) | LF | 70 | $379.46 | $220.00 | $300.00 | $412.00 | $433.51 | $243.00 |
| 46 | Pipe arch corrugated steel 21X15- inch (521.3721) | LF | 36 | $72.02 | $66.00 | $44.00 | $63.00 | $41.93 | $146.00 |
| 47 | Pipe arch corrugated steel 35X24- inch (521.3735) | LF | 361 | $113.44 | $110.00 | $108.00 | $126.00 | $148.38 | $104.00 |
| 48 | Pipe arch corrugated steel 71X47- inch (521.3771) | LF | 64 | $357.16 | $210.00 | $287.00 | $324.00 | $316.17 | $215.00 |
| 49 | Culvert pipe reinforced concrete class IV 18-inch (522.0418) | LF | 140 | $125.40 | $84.00 | $68.00 | $75.50 | $96.02 | $75.00 |
| 50 | Culvert pipe reinforced concrete class IV 24-inch (522.0424) | LF | 194 | $147.72 | $100.00 | $88.00 | $110.00 | $116.33 | $122.00 |
| 51 | Culvert pipe reinforced concrete class IV 42-inch (522.0442) | LF | 104 | $244.13 | $210.00 | $238.00 | $235.00 | $246.99 | $191.00 |
| 52 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 4 | $1,414.16 | $2,000.00 | $1,468.00 | $975.00 | $1,176.91 | $1,172.00 |
| 53 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 6 | $1,544.97 | $2,000.00 | $1,696.00 | $1,150.00 | $1,357.61 | $1,292.00 |
| 54 | Apron endwalls for culvert pipe reinforced concrete 42-inch (522.1042) | EACH | 4 | $3,111.33 | $3,000.00 | $3,027.00 | $2,200.00 | $2,556.11 | $2,744.00 |
| 55 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 24X38-inch (522.2424) | LF | 116 | $181.71 | $160.00 | $187.00 | $162.00 | $198.35 | $221.00 |
| 56 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 29X45-inch (522.2429) | LF | 54 | $255.55 | $210.00 | $214.00 | $220.00 | $253.62 | $240.00 |
| 57 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 34X53-inch (522.2434) | LF | 52 | $322.02 | $230.00 | $258.00 | $280.00 | $285.35 | $270.00 |
| 58 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 24X38-inch (522.2624) | EACH | 4 | $1,970.28 | $1,000.00 | $2,207.00 | $1,500.00 | $1,766.29 | $2,157.00 |
| 59 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 29X45-inch (522.2629) | EACH | 2 | $2,316.34 | $450.00 | $2,644.00 | $1,875.00 | $2,153.84 | $2,475.00 |
| 60 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 34X53-inch (522.2634) | EACH | 2 | $3,106.84 | $490.00 | $3,023.00 | $2,200.00 | $2,551.80 | $2,740.00 |
| 61 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 3,498 | $22.00 | $22.00 | $22.00 | $22.00 | $22.00 | $22.00 |
| 62 | Concrete driveway 6-inch (602.0810) | SY | 105 | $54.00 | $54.00 | $54.00 | $54.00 | $54.00 | $54.00 |
| 63 | Concrete surface drains (602.3010) | CY | 40.60 | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 |
| 64 | Riprap medium (606.0200) | CY | 111 | $101.12 | $60.00 | $130.00 | $80.00 | $115.00 | $75.00 |
| 65 | Maintenance and repair of haul roads (project) 01. 6218-00-74 (618.0100) | EACH | 1 | $0.01 | $0.01 | $0.01 | $100.00 | $1,500.00 | $5,000.00 |
| 66 | Mobilization (619.1000) | EACH | 1 | $170,902 | $84,200 | $373,179 | $430,405 | $234,700 | $125,743 |
| 67 | Water (624.0100) | MGAL | 630 | $0.01 | $15.25 | $50.00 | $30.00 | $30.00 | $47.00 |
| 68 | Salvaged topsoil (625.0500) | SY | 165,000 | $0.01 | $0.75 | $1.30 | $0.01 | $0.95 | $1.08 |
| 69 | Mulching (627.0200) | SY | 109,500 | $0.30 | $0.30 | $0.30 | $0.30 | $0.30 | $0.28 |
| 70 | Silt fence (628.1504) | LF | 18,700 | $1.80 | $1.80 | $1.80 | $1.80 | $1.80 | $1.70 |
| 71 | Silt fence maintenance (628.1520) | LF | 37,500 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $0.05 |
| 72 | Mobilizations erosion control (628.1905) | EACH | 7 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $100.00 |
| 73 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $150.00 |
| 74 | Erosion mat class I type A (628.2002) | SY | 63,500 | $0.95 | $0.95 | $0.95 | $0.95 | $0.95 | $1.50 |
| 75 | Erosion mat class II type B (628.2023) | SY | 5,000 | $1.70 | $1.70 | $1.70 | $1.70 | $1.70 | $2.20 |
| 76 | Temporary ditch checks (628.7504) | LF | 4,000 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $5.25 |
| 77 | Culvert pipe checks (628.7555) | EACH | 250 | $14.00 | $14.00 | $14.00 | $14.00 | $14.00 | $15.00 |
| 78 | Tracking pads (628.7560) | EACH | 4 | $600.00 | $1,000.00 | $1,300.00 | $0.01 | $1,500.00 | $1,500.00 |
| 79 | Rock bags (628.7570) | EACH | 290 | $14.00 | $14.00 | $14.00 | $14.00 | $14.00 | $12.00 |
| 80 | Fertilizer type B (629.0210) | CWT | 105 | $85.00 | $85.00 | $85.00 | $85.00 | $85.00 | $80.00 |
| 81 | Seeding mixture no. 30 (630.0130) | LB | 7,425 | $7.50 | $7.50 | $7.50 | $7.50 | $7.50 | $8.50 |
| 82 | Seeding borrow pit (630.0300) | LB | 200 | $7.50 | $7.50 | $7.50 | $7.50 | $7.50 | $5.00 |
| 83 | Seed water (630.0500) | MGAL | 3,900 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $2.50 |
| 84 | Markers culvert end (633.5200) | EACH | 38 | $65.00 | $65.00 | $65.00 | $65.00 | $65.00 | $45.00 |
| 85 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 4 | $80.00 | $80.00 | $80.00 | $80.00 | $80.00 | $70.00 |
| 86 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 53 | $88.00 | $88.00 | $88.00 | $88.00 | $88.00 | $75.00 |
| 87 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 8 | $95.00 | $95.00 | $95.00 | $95.00 | $95.00 | $80.00 |
| 88 | Signs type II reflective H (637.2210) | SF | 226.02 | $20.00 | $20.00 | $20.00 | $20.00 | $20.00 | $20.00 |
| 89 | Signs type II reflective F (637.2230) | SF | 156.28 | $21.50 | $21.50 | $21.50 | $21.50 | $21.50 | $20.00 |
| 90 | Moving signs type II (638.2102) | EACH | 2 | $125.00 | $125.00 | $125.00 | $125.00 | $125.00 | $20.00 |
| 91 | Removing signs type II (638.2602) | EACH | 59 | $30.00 | $30.00 | $30.00 | $30.00 | $30.00 | $20.00 |
| 92 | Removing small sign supports (638.3000) | EACH | 61 | $30.00 | $30.00 | $30.00 | $30.00 | $30.00 | $20.00 |
| 93 | Field office type B (642.5001) | EACH | 1 | $8,100.00 | $2,500.00 | $12,000 | $7,500.00 | $14,500 | $10,000 |
| 94 | Traffic control drums (643.0300) | DAY | 100 | $5.00 | $5.00 | $5.00 | $5.00 | $0.15 | $5.00 |
| 95 | Traffic control barricades type III (643.0420) | DAY | 2,440 | $1.00 | $1.00 | $1.00 | $1.00 | $0.55 | $1.00 |
| 96 | Traffic control warning lights type A (643.0705) | DAY | 4,880 | $0.25 | $0.25 | $0.25 | $0.25 | $0.10 | $0.25 |
| 97 | Traffic control signs (643.0900) | DAY | 20,620 | $0.25 | $0.25 | $0.25 | $0.25 | $0.15 | $0.25 |
| 98 | Traffic control covering signs type I (643.0910) | EACH | 3 | $300.00 | $300.00 | $300.00 | $300.00 | $300.00 | $300.00 |
| 99 | Traffic control covering signs type II (643.0920) | EACH | 1 | $25.00 | $25.00 | $25.00 | $25.00 | $210.00 | $25.00 |
| 100 | Traffic control signs PCMS (643.1050) | DAY | 14 | $80.00 | $80.00 | $80.00 | $80.00 | $20.00 | $80.00 |
| 101 | Traffic control (643.5000) | EACH | 1 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $23,955 | $5,000.00 |
| 102 | Geotextile type R (645.0130) | SY | 786 | $1.03 | $1.60 | $3.00 | $3.50 | $1.35 | $1.80 |
| 103 | Geogrid type SR (645.0220) | SY | 2,000 | $1.90 | $0.95 | $4.00 | $1.40 | $2.80 | $1.60 |
| 104 | Marking line epoxy 6-inch (646.2020) | LF | 93,086 | $0.45 | $0.45 | $0.45 | $0.58 | $0.45 | $1.10 |
| 105 | Marking line epoxy 10-inch (646.4020) | LF | 1,600 | $0.99 | $0.99 | $0.99 | $1.40 | $0.99 | $1.45 |
| 106 | Marking arrow epoxy (646.5020) | EACH | 14 | $354.96 | $354.96 | $354.96 | $175.00 | $354.96 | $310.00 |
| 107 | Marking word epoxy (646.5120) | EACH | 7 | $359.28 | $359.28 | $359.28 | $200.00 | $359.28 | $340.00 |
| 108 | Marking stop line epoxy 18-inch (646.6120) | LF | 330 | $14.89 | $14.89 | $14.89 | $10.00 | $14.89 | $15.25 |
| 109 | Locating no-passing zones (648.0100) | MI | 5.27 | $489.19 | $489.19 | $489.19 | $310.00 | $489.19 | $480.00 |
| 110 | Construction staking subgrade (650.4500) | LF | 28,980 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $0.10 |
| 111 | Construction staking base (650.5000) | LF | 28,980 | $0.64 | $0.64 | $0.64 | $0.64 | $0.50 | $0.64 |
| 112 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 3,498 | $0.55 | $0.55 | $0.55 | $0.55 | $1.50 | $0.55 |
| 113 | Construction staking pipe culverts (650.6000) | EACH | 19 | $110.00 | $110.00 | $110.00 | $110.00 | $350.00 | $110.00 |
| 114 | Construction staking resurfacing reference (650.8000) | LF | 27,735 | $0.13 | $0.13 | $0.13 | $0.13 | $0.19 | $0.13 |
| 115 | Construction staking supplemental control (project) 01. 6218-00-74 (650.9911) | EACH | 1 | $900.00 | $900.00 | $900.00 | $900.00 | $2,000.00 | $900.00 |
| 116 | Construction staking slope stakes (650.9920) | LF | 28,980 | $0.77 | $0.77 | $0.77 | $0.77 | $1.00 | $0.77 |
| 117 | Sawing asphalt (690.0150) | LF | 1,174 | $1.49 | $1.54 | $1.49 | $1.54 | $1.54 | $1.77 |
| 118 | Sawing concrete (690.0250) | LF | 24 | $2.50 | $4.00 | $2.50 | $4.00 | $4.00 | $5.00 |
| 119 | Incentive iri ride (740.0440) | DOL | 24,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 120 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,400 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 121 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 3,200 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 122 | Special 01. temporary water diversion (SPV.0060) | EACH | 1 | $21,436 | $19,000 | $8,000.00 | $12,000 | $16,989 | $13,000 |
| 123 | Special 02. field locate and adjust drain tile (SPV.0060) | EACH | 6 | $684.52 | $980.00 | $1,800.00 | $500.00 | $605.00 | $700.00 |
| 124 | Special 03. research and locate existing land parcel monuments (SPV.0060) | EACH | 17 | $75.00 | $75.00 | $75.00 | $75.00 | $150.00 | $75.00 |
| 125 | Special 04. verify and replace existing land parcel monuments (SPV.0060) | EACH | 17 | $75.00 | $75.00 | $75.00 | $75.00 | $150.00 | $75.00 |
| 126 | Special 05. utility line opening (ulo) (SPV.0060) | EACH | 3 | $750.00 | $760.00 | $1,200.00 | $1,000.00 | $750.00 | $600.00 |
| 127 | Special 06. landmark reference monuments (SPV.0060) | EACH | 11 | $850.00 | $850.00 | $850.00 | $850.00 | $1,200.00 | $850.00 |
| 128 | Special 01. tree root sawing (SPV.0090) | LF | 160 | $8.93 | $8.50 | $21.00 | $29.00 | $26.65 | $20.00 |
| 129 | Special 02. cleaning storm sewer (SPV.0090) | LF | 435 | $16.50 | $8.40 | $14.00 | $23.00 | $18.25 | $19.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of February 10, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.