WisDOT contract 20260210008 bid tabulation
V East Troy, North Street; Townline Rd to Edwards St (STH 020, Walworth County V East Troy, North Street). Let by Wisconsin DOT on February 10, 2026, Walworth. 3 bids received; low bid $873,982 by Payne and Dolan, Inc.
- Owner
- Wisconsin DOT
- Letting
- 10 FEB 2026
- Pay items
- 97
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Payne and Dolan, Inc | $873,982 | Low |
| 2 | Stark Pavement Corporation | $919,000 | +5.0% |
| 3 | Rock Road Companies, Inc. | $945,118 | +8.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Payne and Dolan, Inc | 2. Stark Pavement Corporation | 3. Rock Road Companies, Inc. |
|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 2 | $1,052.60 | $900.00 | $900.00 |
| 2 | Removing asphaltic surface (204.0110) | SY | 131 | $9.00 | $9.00 | $9.00 |
| 3 | Removing asphaltic surface butt joints (204.0115) | SY | 81 | $0.01 | $2.75 | $21.45 |
| 4 | Removing asphaltic surface milling (204.0120) | SY | 24,949 | $0.50 | $2.75 | $3.16 |
| 5 | Removing curb & gutter (204.0150) | LF | 477 | $11.35 | $11.35 | $11.35 |
| 6 | Removing concrete sidewalk (204.0155) | SY | 195 | $18.00 | $18.00 | $18.00 |
| 7 | Prepare foundation for asphaltic paving (project) 01. 1090-03-77 (211.0101) | EACH | 1 | $0.01 | $2,450.00 | $0.01 |
| 8 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 41 | $96.55 | $11.20 | $30.03 |
| 9 | Finishing roadway (project) 01. 1090-03-77 (213.0100) | EACH | 1 | $2,400.00 | $1,250.00 | $6,030.70 |
| 10 | Base aggregate dense 3/4-inch (305.0110) | TON | 200 | $45.90 | $20.60 | $48.02 |
| 11 | Base patching concrete shes (390.0405) | CY | 15 | $242.91 | $250.00 | $240.48 |
| 12 | Drilled tie bars (416.0610) | EACH | 52 | $12.50 | $12.50 | $12.50 |
| 13 | Tack coat (455.0605) | GAL | 3,096 | $4.00 | $2.85 | $3.56 |
| 14 | Incentive density HMA pavement (460.2000) | DOL | 3,970 | $1.00 | $1.00 | $1.00 |
| 15 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 3,482 | $70.00 | $71.30 | $70.43 |
| 16 | HMA pavement 4 MT 58-28 H (460.6424) | TON | 2,707 | $83.00 | $81.00 | $78.01 |
| 17 | Asphaltic surface patching (465.0110) | TON | 93 | $173.00 | $116.00 | $170.33 |
| 18 | Asphaltic surface driveways and field entrances (465.0120) | TON | 16 | $120.00 | $81.00 | $295.56 |
| 19 | Cleaning culvert pipes (520.8700) | EACH | 1 | $1,071.37 | $1,060.89 | $1,060.66 |
| 20 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 489 | $47.65 | $47.65 | $47.65 |
| 21 | Concrete sidewalk 5-inch (602.0410) | SF | 2,066 | $10.65 | $10.65 | $10.65 |
| 22 | Curb ramp detectable warning field yellow (602.0505) | SF | 150 | $40.00 | $40.00 | $40.00 |
| 23 | Riprap medium (606.0200) | CY | 1 | $1,050.66 | $1,040.46 | $1,040.15 |
| 24 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 29 | $136.36 | $135.00 | $135.00 |
| 25 | Manhole covers type J (611.0530) | EACH | 18 | $1,189.39 | $1,177.50 | $1,177.50 |
| 26 | Inlet covers type H (611.0624) | EACH | 1 | $1,102.41 | $1,091.39 | $1,091.39 |
| 27 | Inlets 2X3-FT (611.3230) | EACH | 1 | $2,386.57 | $2,362.70 | $2,362.70 |
| 28 | Adjusting inlet covers (611.8115) | EACH | 2 | $604.24 | $598.20 | $598.20 |
| 29 | Cover plates temporary (611.8120.S) | EACH | 18 | $139.16 | $137.77 | $137.77 |
| 30 | Insulation board polystyrene (inch) 01. 4-inch (612.0902.S) | SY | 5 | $23.04 | $22.81 | $22.81 |
| 31 | Fence safety (616.0700.S) | LF | 500 | $4.90 | $4.90 | $4.90 |
| 32 | Mobilization (619.1000) | EACH | 1 | $8,975.00 | $27,002 | $26,458 |
| 33 | Topsoil (625.0100) | SY | 211 | $14.92 | $12.50 | $12.50 |
| 34 | Mulching (627.0200) | SY | 665 | $1.23 | $1.23 | $1.23 |
| 35 | Erosion bales (628.1104) | EACH | 40 | $17.46 | $17.46 | $17.46 |
| 36 | Mobilizations erosion control (628.1905) | EACH | 1 | $381.70 | $381.70 | $381.70 |
| 37 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $381.70 | $381.70 | $381.70 |
| 38 | Erosion mat urban class I type B (628.2008) | SY | 201 | $2.81 | $2.81 | $2.81 |
| 39 | Inlet protection type A (628.7005) | EACH | 3 | $104.50 | $104.50 | $104.50 |
| 40 | Inlet protection type D (628.7020) | EACH | 39 | $93.50 | $93.50 | $93.50 |
| 41 | Culvert pipe checks (628.7555) | EACH | 36 | $30.16 | $30.16 | $30.16 |
| 42 | Fertilizer type B (629.0210) | CWT | 5 | $117.29 | $117.29 | $117.29 |
| 43 | Seeding mixture no. 40 (630.0140) | LB | 10 | $21.17 | $21.17 | $21.17 |
| 44 | Seeding temporary (630.0200) | LB | 22 | $8.99 | $8.99 | $8.99 |
| 45 | Seed water (630.0500) | MGAL | 7 | $60.68 | $60.68 | $60.68 |
| 46 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 56 | $120.95 | $120.95 | $120.95 |
| 47 | Sign flags permanent type II (637.0620) | EACH | 2 | $135.52 | $135.52 | $135.52 |
| 48 | Signs type II reflective H (637.2210) | SF | 253.84 | $23.06 | $23.06 | $23.06 |
| 49 | Signs type II reflective F (637.2230) | SF | 193.49 | $24.43 | $24.43 | $24.43 |
| 50 | Removing signs type II (638.2602) | EACH | 51 | $32.61 | $32.61 | $32.61 |
| 51 | Removing small sign supports (638.3000) | EACH | 51 | $32.61 | $32.61 | $32.61 |
| 52 | Field office type C (642.5201) | EACH | 1 | $11,738 | $5,000.00 | $3,750.00 |
| 53 | Traffic control drums (643.0300) | DAY | 2,324 | $0.32 | $0.32 | $0.32 |
| 54 | Traffic control barricades type III (643.0420) | DAY | 775 | $0.65 | $0.65 | $0.65 |
| 55 | Traffic control warning lights type A (643.0705) | DAY | 1,550 | $0.25 | $0.25 | $0.25 |
| 56 | Traffic control warning lights type C (643.0715) | DAY | 200 | $0.25 | $0.25 | $0.25 |
| 57 | Traffic control signs (643.0900) | DAY | 6,328 | $0.65 | $0.65 | $0.65 |
| 58 | Traffic control covering signs type II (643.0920) | EACH | 10 | $48.00 | $48.00 | $48.00 |
| 59 | Traffic control signs PCMS (643.1050) | DAY | 28 | $55.00 | $55.00 | $55.00 |
| 60 | Traffic control cones 42-inch (643.1070) | DAY | 530 | $0.53 | $0.53 | $0.53 |
| 61 | Temporary marking line paint 6- inch (643.3165) | LF | 7,052 | $0.58 | $0.58 | $0.58 |
| 62 | Temporary marking crosswalk removable tape 6-inch (643.3350) | LF | 508 | $1.50 | $1.50 | $1.50 |
| 63 | Traffic control (643.5000) | EACH | 1 | $5,040.00 | $5,040.00 | $5,040.00 |
| 64 | Temporary pedestrian surface asphalt (644.1410) | SF | 2,052 | $4.45 | $4.90 | $6.15 |
| 65 | Temporary pedestrian curb ramp (644.1601) | DAY | 302 | $18.55 | $18.55 | $18.55 |
| 66 | Temporary pedestrian detectable warning field (644.1605) | SF | 140 | $10.00 | $10.00 | $10.00 |
| 67 | Temporary pedestrian barricade (644.1810) | LF | 1,844 | $5.00 | $5.00 | $5.00 |
| 68 | Temporary audible message devices (644.1900.S) | DAY | 366 | $4.25 | $4.25 | $4.25 |
| 69 | Geotextile type HR (645.0120) | SY | 8 | $19.03 | $18.84 | $18.84 |
| 70 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 18,657 | $1.37 | $1.55 | $1.36 |
| 71 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 425 | $2.73 | $3.10 | $2.70 |
| 72 | Marking stop line epoxy 18-inch (646.6120) | LF | 185 | $15.61 | $15.00 | $15.45 |
| 73 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 597 | $14.80 | $10.00 | $14.65 |
| 74 | Marking removal line 4-inch (646.9000) | LF | 6,136 | $0.65 | $0.65 | $0.65 |
| 75 | Marking removal line 8-inch (646.9100) | LF | 45 | $2.00 | $2.00 | $2.00 |
| 76 | Construction staking storm sewer (650.4000) | EACH | 1 | $105.00 | $105.00 | $105.00 |
| 77 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 489 | $2.00 | $2.00 | $2.00 |
| 78 | Construction staking resurfacing reference (650.8000) | LF | 6,375 | $0.20 | $0.20 | $0.20 |
| 79 | Construction staking curb ramps (650.9000) | EACH | 15 | $170.00 | $170.00 | $170.00 |
| 80 | Construction staking sidewalk (project) 01. 1090-03-77 (650.9500) | EACH | 1 | $1,100.00 | $1,100.00 | $1,100.00 |
| 81 | Construction staking supplemental control (project) 01. 1090-03-77 (650.9911) | EACH | 1 | $1,500.00 | $1,500.00 | $1,500.00 |
| 82 | Sawing asphalt (690.0150) | LF | 1,002 | $1.50 | $1.49 | $1.49 |
| 83 | Sawing concrete (690.0250) | LF | 108 | $2.35 | $2.55 | $2.55 |
| 84 | Incentive iri ride (740.0440) | DOL | 4,472 | $1.00 | $1.00 | $1.00 |
| 85 | Special 01. RRFB system STH 20 WB right at division ST (back to back) (SPV.0060) | EACH | 1 | $7,311.00 | $7,311.00 | $7,311.00 |
| 86 | Special 02. RRFB system STH 20 WB left at division ST (back to back) (SPV.0060) | EACH | 1 | $7,311.00 | $7,311.00 | $7,311.00 |
| 87 | Special 03. RRFB system STH 20 EB right at division ST (back to back) (SPV.0060) | EACH | 1 | $7,311.00 | $7,311.00 | $7,311.00 |
| 88 | Special 04. RRFB system STH 20 EB left at division ST (back to back) (SPV.0060) | EACH | 1 | $7,311.00 | $7,311.00 | $7,311.00 |
| 89 | Special 05. remove RRFB system STH 20 WB at division ST (SPV.0060) | EACH | 1 | $493.00 | $493.00 | $493.00 |
| 90 | Special 06. remove RRFB system STH 20 EB at division ST (SPV.0060) | EACH | 1 | $493.00 | $493.00 | $493.00 |
| 91 | Special 07. curb ramp grading, shaping, and finishing (SPV.0060) | EACH | 11 | $1,335.00 | $1,335.00 | $980.00 |
| 92 | Special 08. section corner monuments (SPV.0060) | EACH | 1 | $0.01 | $850.00 | $350.00 |
| 93 | Special 30. pipe connection to existing structure (SPV.0060) | EACH | 1 | $421.06 | $416.85 | $416.85 |
| 94 | Special 31. RE-tie endwall (SPV.0060) | EACH | 1 | $894.08 | $885.14 | $885.14 |
| 95 | Special 60. adjusting sanitary manholes (SPV.0060) | EACH | 5 | $1,852.14 | $1,833.62 | $1,833.62 |
| 96 | Special 61. adjusting water valve boxes (SPV.0060) | EACH | 14 | $249.09 | $246.60 | $246.60 |
| 97 | Special 01. asphaltic repair (SPV.0195) | TON | 153 | $150.00 | $110.00 | $180.98 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of February 10, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.