WisDOT contract 20260210031 bid tabulation
1058-25-60. Let by Wisconsin DOT on February 10, 2026, Shawano. 3 bids received; low bid $10,718,801 by Vinton Construction Company.
- Owner
- Wisconsin DOT
- Letting
- 10 FEB 2026
- Pay items
- 157
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Vinton Construction Company | $10,718,801 | Low |
| 2 | Zignego Company, Inc. | $10,948,012 | +2.0% |
| 3 | Chippewa Concrete Services, Inc. | $11,114,460 | +4.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Vinton Construction Company | 2. Zignego Company, Inc. | 3. Chippewa Concrete Services, Inc. |
|---|---|---|---|---|---|---|
| 1 | Removing small pipe culverts (203.0100) | EACH | 4 | $890.00 | $1,500.00 | $511.00 |
| 2 | Removing concrete pavement (204.0100) | SY | 6,591 | $4.26 | $10.74 | $12.86 |
| 3 | Removing asphaltic surface (204.0110) | SY | 3,645 | $5.54 | $10.00 | $4.89 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 1,105 | $6.00 | $6.00 | $6.13 |
| 5 | Removing asphaltic surface milling (204.0120) | SY | 169,321 | $2.40 | $2.40 | $2.45 |
| 6 | Removing curb & gutter (204.0150) | LF | 194 | $10.00 | $10.00 | $10.37 |
| 7 | Removing guardrail (204.0165) | LF | 10,314 | $1.73 | $1.73 | $1.77 |
| 8 | Removing delineators and markers (204.0180) | EACH | 494 | $7.00 | $7.00 | $7.15 |
| 9 | Removing surface drains (204.0190) | EACH | 24 | $200.00 | $500.00 | $357.70 |
| 10 | Removing storm sewer (size) 01. 18-inch (204.0245) | LF | 97 | $19.00 | $75.00 | $54.27 |
| 11 | Removing (item description) 01. removing underdrain endwalls (204.9060.S) | EACH | 8 | $185.00 | $400.00 | $204.40 |
| 12 | Removing (item description) 01. removing underdrain (204.9090.S) | LF | 60 | $10.00 | $20.00 | $10.22 |
| 13 | Excavation common (205.0100) | CY | 390 | $43.42 | $80.00 | $24.31 |
| 14 | Borrow (208.0100) | CY | 35 | $41.14 | $50.00 | $10.73 |
| 15 | Backfill granular grade 2 (209.2500) | TON | 940 | $10.00 | $0.01 | $34.09 |
| 16 | Prepare foundation for asphaltic paving (project) 01. 1058-25-60 (211.0101) | EACH | 1 | $25,450 | $25,450 | $26,010 |
| 17 | Prepare foundation for asphaltic paving (project) 02. 1058-25-80 (211.0101) | EACH | 1 | $25,450 | $25,450 | $26,010 |
| 18 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 63 | $260.00 | $260.00 | $265.72 |
| 19 | Prepare foundation for base aggregate (211.0500) | STA | 50 | $102.00 | $200.00 | $158.41 |
| 20 | Finishing roadway (project) 01. 1058-25-60 (213.0100) | EACH | 1 | $5,000.00 | $1,000.00 | $5,110.00 |
| 21 | Finishing roadway (project) 02. 1058-25-80 (213.0100) | EACH | 1 | $5,000.00 | $1,000.00 | $5,110.00 |
| 22 | Base aggregate dense 3/4-inch (305.0110) | TON | 10,615 | $25.56 | $26.50 | $28.87 |
| 23 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 2,520 | $20.50 | $0.01 | $24.56 |
| 24 | Base aggregate open-graded (310.0110) | TON | 300 | $40.19 | $0.01 | $25.44 |
| 25 | Concrete pavement 8-inch (415.0080) | SY | 894 | $91.27 | $74.00 | $142.56 |
| 26 | Concrete pavement 10-inch (415.0100) | SY | 4,855 | $41.07 | $73.00 | $92.38 |
| 27 | Concrete pavement approach slab (415.0410) | SY | 751 | $220.00 | $203.00 | $318.35 |
| 28 | Rout and seal (415.6000.S) | LF | 228,520 | $0.70 | $0.61 | $0.62 |
| 29 | Drilled tie bars (416.0610) | EACH | 4,553 | $9.00 | $20.00 | $8.18 |
| 30 | Drilled dowel bars (416.0620) | EACH | 24,854 | $15.00 | $20.00 | $12.26 |
| 31 | Concrete pavement repair (416.1710) | SY | 13,083.70 | $91.44 | $83.63 | $95.82 |
| 32 | Concrete pavement replacement (416.1720) | SY | 20,451 | $94.94 | $83.63 | $95.82 |
| 33 | Continuous diamond grinding concrete pavement (420.1000) | SY | 62,570 | $4.80 | $4.75 | $4.85 |
| 34 | HMA cold weather paving (450.4000) | TON | 1,610 | $3.50 | $3.50 | $3.58 |
| 35 | Tack coat (455.0605) | GAL | 10,557 | $2.25 | $2.25 | $2.30 |
| 36 | Incentive density HMA pavement (460.2000) | DOL | 12,945 | $1.00 | $1.00 | $1.00 |
| 37 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 15,301 | $79.65 | $79.65 | $81.40 |
| 38 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 4,940 | $81.80 | $81.80 | $83.60 |
| 39 | Asphaltic surface (465.0105) | TON | 388 | $187.60 | $187.60 | $191.73 |
| 40 | Asphaltic surface patching (465.0110) | TON | 4,665 | $77.30 | $77.30 | $79.00 |
| 41 | Asphaltic rumble strips, shoulder divided roadway (465.0510) | LF | 119,415 | $0.14 | $0.14 | $0.14 |
| 42 | Asphaltic rumble strips, centerline (465.0560) | LF | 1,479 | $0.60 | $0.60 | $0.61 |
| 43 | Concrete collars for pipe (520.8000) | EACH | 3 | $888.00 | $1,500.00 | $919.80 |
| 44 | Culvert pipe reinforced concrete class III 18-inch (522.0118) | LF | 104 | $173.30 | $250.00 | $189.99 |
| 45 | Culvert pipe reinforced concrete class IV 18-inch (522.0418) | LF | 66 | $166.50 | $250.00 | $189.99 |
| 46 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 4 | $1,592.00 | $2,500.00 | $1,533.00 |
| 47 | Culvert pipe salvaged 24-inch (524.0124) | LF | 22 | $109.00 | $250.00 | $127.85 |
| 48 | Culvert pipe salvaged 54-inch (524.0154) | LF | 32 | $170.00 | $550.00 | $295.87 |
| 49 | Culvert pipe salvaged 60-inch (524.0160) | LF | 30 | $220.00 | $650.00 | $317.02 |
| 50 | Apron endwalls for culvert pipe salvaged 18-inch (524.0618) | EACH | 3 | $785.00 | $1,200.00 | $511.00 |
| 51 | Apron endwalls for culvert pipe salvaged 24-inch (524.0624) | EACH | 1 | $2,403.00 | $1,300.00 | $766.50 |
| 52 | Apron endwalls for culvert pipe salvaged 54-inch (524.0654) | EACH | 1 | $2,190.00 | $1,850.00 | $1,533.00 |
| 53 | Apron endwalls for culvert pipe salvaged 60-inch (524.0660) | EACH | 1 | $2,282.00 | $2,500.00 | $2,044.00 |
| 54 | Concrete curb type G (601.0115) | LF | 37 | $75.00 | $60.00 | $77.62 |
| 55 | Concrete curb & gutter 4-inch sloped 36-inch type A (601.0551) | LF | 165 | $45.00 | $60.00 | $85.69 |
| 56 | Concrete curb & gutter 4-inch sloped 30-inch type J (601.0576) | LF | 8 | $75.00 | $60.00 | $84.07 |
| 57 | Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590) | LF | 813 | $55.00 | $60.00 | $85.69 |
| 58 | Concrete surface drains (602.3010) | CY | 39.60 | $0.01 | $1,000.00 | $1,548.81 |
| 59 | Concrete rumble strips, shoulder divided roadway (602.3210) | LF | 109,145 | $0.75 | $0.75 | $0.77 |
| 60 | Riprap medium (606.0200) | CY | 102 | $213.76 | $0.01 | $110.89 |
| 61 | Riprap heavy (606.0300) | CY | 578 | $46.40 | $0.01 | $97.24 |
| 62 | Adjusting inlet covers (611.8115) | EACH | 1 | $520.00 | $2,250.00 | $766.50 |
| 63 | Pipe underdrain unperforated 6- inch (612.0206) | LF | 247 | $29.75 | $55.00 | $9.30 |
| 64 | Apron endwalls for underdrain reinforced concrete 6-inch (612.0806) | EACH | 4 | $325.00 | $600.00 | $511.00 |
| 65 | Barrier system grading shaping finishing (614.0010) | EACH | 32 | $3,193.60 | $5,000.00 | $2,650.05 |
| 66 | Steel thrie beam bullnose terminal (614.0220) | EACH | 6 | $13,000 | $13,000 | $13,286 |
| 67 | Steel thrie beam (614.0230) | LF | 725 | $34.00 | $34.00 | $34.75 |
| 68 | Replacing guardrail posts and blocks (614.0950) | EACH | 6 | $113.00 | $113.00 | $115.49 |
| 69 | Replacing guardrail rail and hardware (614.0951) | LF | 150 | $11.00 | $11.00 | $11.24 |
| 70 | MGS guardrail 3 (614.2300) | LF | 6,727.50 | $24.03 | $24.03 | $24.56 |
| 71 | MGS thrie beam transition (614.2500) | LF | 1,182 | $87.33 | $87.33 | $89.25 |
| 72 | MGS guardrail terminal eat (614.2610) | EACH | 29 | $3,253.00 | $3,253.00 | $3,324.57 |
| 73 | MGS guardrail terminal type 2 (614.2620) | EACH | 1 | $2,333.00 | $2,333.00 | $2,384.33 |
| 74 | Maintenance and repair of haul roads (project) 01. 1058-25-60 (618.0100) | EACH | 1 | $0.01 | $1.00 | $102.20 |
| 75 | Maintenance and repair of haul roads (project) 02. 1058-25-80 (618.0100) | EACH | 1 | $0.01 | $1.00 | $102.20 |
| 76 | Mobilization (619.1000) | EACH | 1 | $865,000 | $839,000 | $485,971 |
| 77 | Concrete median sloped nose (620.0300) | SF | 42 | $15.00 | $30.00 | $16.45 |
| 78 | Water (624.0100) | MGAL | 80 | $50.00 | $200.00 | $25.55 |
| 79 | Topsoil (625.0100) | SY | 5,755 | $3.95 | $8.00 | $6.49 |
| 80 | Silt fence (628.1504) | LF | 8,571 | $1.55 | $1.55 | $1.58 |
| 81 | Silt fence maintenance (628.1520) | LF | 8,571 | $0.03 | $0.03 | $0.03 |
| 82 | Mobilizations erosion control (628.1905) | EACH | 12 | $153.00 | $153.00 | $156.37 |
| 83 | Mobilizations emergency erosion control (628.1910) | EACH | 12 | $233.00 | $233.00 | $238.13 |
| 84 | Erosion mat class I type A (628.2002) | SY | 5,225 | $1.00 | $1.00 | $1.02 |
| 85 | Erosion mat urban class I type A (628.2006) | SY | 560 | $2.50 | $2.50 | $2.56 |
| 86 | Inlet protection type A (628.7005) | EACH | 1 | $100.00 | $100.00 | $102.20 |
| 87 | Temporary ditch checks (628.7504) | LF | 68 | $7.00 | $7.00 | $7.15 |
| 88 | Culvert pipe checks (628.7555) | EACH | 3 | $50.00 | $50.00 | $51.10 |
| 89 | Rock bags (628.7570) | EACH | 323 | $5.00 | $5.00 | $5.11 |
| 90 | Fertilizer type B (629.0210) | CWT | 4.30 | $125.00 | $125.00 | $127.75 |
| 91 | Seeding mixture no. 30 (630.0130) | LB | 135 | $8.00 | $8.00 | $8.18 |
| 92 | Seed water (630.0500) | MGAL | 164 | $5.00 | $5.00 | $5.11 |
| 93 | Delineator posts steel (633.0100) | EACH | 494 | $33.00 | $33.00 | $33.73 |
| 94 | Delineator reflectors (633.0500) | EACH | 494 | $9.00 | $9.00 | $9.20 |
| 95 | Markers culvert end (633.5200) | EACH | 10 | $65.00 | $65.00 | $66.43 |
| 96 | Posts tubular steel 2X2-inch X 11- FT (634.0811) | EACH | 1 | $200.00 | $200.00 | $204.40 |
| 97 | Posts tubular steel 2X2-inch X 14- FT (634.0814) | EACH | 9 | $250.00 | $250.00 | $255.50 |
| 98 | Signs type II reflective H (637.2210) | SF | 71 | $25.00 | $25.00 | $25.55 |
| 99 | Moving signs type II (638.2102) | EACH | 3 | $150.00 | $150.00 | $153.30 |
| 100 | Removing signs type II (638.2602) | EACH | 5 | $25.00 | $25.00 | $25.55 |
| 101 | Removing small sign supports (638.3000) | EACH | 8 | $25.00 | $25.00 | $25.55 |
| 102 | Field office type B (642.5001) | EACH | 1 | $1,000.00 | $20,000 | $10,220 |
| 103 | Traffic control drums (643.0300) | DAY | 97,366 | $0.20 | $0.20 | $0.20 |
| 104 | Digital speed reduction system (DSRS) (643.0370.S) | DAY | 356 | $81.75 | $81.75 | $83.55 |
| 105 | Traffic control barricades type III (643.0420) | DAY | 3,968 | $1.25 | $1.25 | $1.28 |
| 106 | Traffic control warning lights type A (643.0705) | DAY | 7,936 | $0.25 | $0.25 | $0.26 |
| 107 | Traffic control warning lights type C (643.0715) | DAY | 20,150 | $0.25 | $0.25 | $0.26 |
| 108 | Traffic control connected arrow boards (643.0810) | DAY | 356 | $13.20 | $13.20 | $13.49 |
| 109 | Traffic control signs (643.0900) | DAY | 41,356 | $0.20 | $0.20 | $0.20 |
| 110 | Traffic control covering signs type I (643.0910) | EACH | 12 | $440.00 | $440.00 | $449.68 |
| 111 | Traffic control covering signs type II (643.0920) | EACH | 55 | $135.00 | $135.00 | $137.97 |
| 112 | Traffic control signs fixed message (643.1000) | SF | 258.50 | $22.45 | $22.45 | $22.94 |
| 113 | Traffic control signs PCMS (643.1050) | DAY | 107 | $18.00 | $18.00 | $18.40 |
| 114 | Traffic control cones 42-inch (643.1070) | DAY | 225,704 | $0.20 | $0.20 | $0.20 |
| 115 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 356 | $5.25 | $5.25 | $5.37 |
| 116 | Temporary marking line paint 6- inch (643.3165) | LF | 14,610 | $0.40 | $0.40 | $0.41 |
| 117 | Temporary marking line removable tape 6-inch (643.3180) | LF | 25,772 | $1.75 | $1.75 | $1.79 |
| 118 | Temporary marking line removable tape 10-inch (643.3280) | LF | 4,800 | $3.50 | $3.50 | $3.58 |
| 119 | Traffic control (643.5000) | EACH | 1 | $205,000 | $205,000 | $209,510 |
| 120 | Geotextile type HR (645.0120) | SY | 1,190 | $2.00 | $6.00 | $7.31 |
| 121 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 33,405 | $0.80 | $0.80 | $0.82 |
| 122 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 343,049 | $1.12 | $1.12 | $1.14 |
| 123 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 16,093 | $2.52 | $2.52 | $2.58 |
| 124 | Marking arrow epoxy (646.5020) | EACH | 10 | $238.91 | $238.91 | $244.17 |
| 125 | Marking word epoxy (646.5120) | EACH | 4 | $356.84 | $356.84 | $364.69 |
| 126 | Marking symbol epoxy (646.5220) | EACH | 1 | $342.12 | $342.12 | $349.65 |
| 127 | Marking outfall epoxy (646.5520) | EACH | 762 | $45.84 | $45.84 | $46.85 |
| 128 | Marking stop line epoxy 18-inch (646.6120) | LF | 276 | $14.79 | $14.79 | $15.12 |
| 129 | Marking diagonal epoxy 12-inch (646.7120) | LF | 1,738 | $10.51 | $10.51 | $10.74 |
| 130 | Marking chevron epoxy 24-inch (646.7220) | LF | 953 | $18.58 | $18.58 | $18.99 |
| 131 | Marking corrugated median epoxy (646.8020) | SF | 973 | $8.35 | $8.35 | $8.53 |
| 132 | Marking curb epoxy (646.8120) | LF | 485 | $7.07 | $7.07 | $7.23 |
| 133 | Marking island nose epoxy (646.8220) | EACH | 16 | $265.89 | $265.89 | $271.74 |
| 134 | Marking parking stall epoxy (646.8320) | LF | 2,292 | $7.34 | $7.34 | $7.50 |
| 135 | Marking removal line 4-inch (646.9000) | LF | 1,486 | $1.10 | $1.10 | $1.12 |
| 136 | Construction staking subgrade (650.4500) | LF | 555 | $0.01 | $0.01 | $0.01 |
| 137 | Construction staking base (650.5000) | LF | 555 | $1.00 | $1.00 | $1.02 |
| 138 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 1,023 | $0.90 | $0.90 | $0.92 |
| 139 | Construction staking pipe culverts (650.6000) | EACH | 9 | $100.00 | $100.00 | $102.20 |
| 140 | Construction staking resurfacing reference (650.8000) | LF | 127,124 | $0.08 | $0.08 | $0.08 |
| 141 | Construction staking supplemental control (project) 01. 1058-25-60 (650.9911) | EACH | 1 | $10.00 | $10.00 | $10.22 |
| 142 | Construction staking supplemental control (project) 02. 1058-25-80 (650.9911) | EACH | 1 | $10.00 | $10.00 | $10.22 |
| 143 | Construction staking slope stakes (650.9920) | LF | 555 | $1.50 | $1.50 | $1.53 |
| 144 | Removing pull boxes (653.0905) | EACH | 2 | $500.00 | $500.00 | $689.85 |
| 145 | Sawing asphalt (690.0150) | LF | 1,244 | $1.95 | $2.95 | $1.99 |
| 146 | Sawing concrete (690.0250) | LF | 91,022 | $2.35 | $3.35 | $2.40 |
| 147 | Incentive compressive strength concrete pavement (715.0720) | DOL | 1,953 | $1.00 | $1.00 | $1.00 |
| 148 | Special 01. removing raised pavement markers & filling voids (SPV.0060) | EACH | 910 | $50.00 | $50.00 | $91.98 |
| 149 | Special 02. locate and clean existing underdrain outfalls (SPV.0060) | EACH | 762 | $35.00 | $35.00 | $35.77 |
| 150 | Special 03. grading shaping and finishing for culvert modifications (SPV.0060) | EACH | 7 | $833.00 | $1,500.00 | $1,566.73 |
| 151 | Special 04. grading, shaping and finishing for culvert replacement sta 2667+22 (SPV.0060) | EACH | 1 | $1,733.00 | $5,000.00 | $9,436.13 |
| 152 | Special 05. grading, shaping, and finishing for culvert replacement sta 2659+55 (SPV.0060) | EACH | 1 | $1,733.00 | $5,000.00 | $9,436.13 |
| 153 | Special 06. underdrain connection to inlet (SPV.0060) | EACH | 2 | $765.00 | $1,500.00 | $664.30 |
| 154 | Special 07. connect underdrain 6- inch (SPV.0060) | EACH | 8 | $333.75 | $250.00 | $204.40 |
| 155 | Special 01. construction staking concrete pavement reference (SPV.0090) | LF | 2,267 | $2.00 | $2.00 | $2.04 |
| 156 | Special 03. concrete joint and crack cleaning, repair and sealing (SPV.0090) | LF | 1,458 | $5.00 | $13.00 | $17.53 |
| 157 | Special 01. removing distressed asphaltic surface milling (SPV.0180) | SY | 33,698 | $3.45 | $3.45 | $3.53 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of February 10, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.