WisDOT contract 20260210031 bid tabulation

1058-25-60. Let by Wisconsin DOT on February 10, 2026, Shawano. 3 bids received; low bid $10,718,801 by Vinton Construction Company.

Owner
Wisconsin DOT
Letting
10 FEB 2026
Pay items
157
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Vinton Construction Company$10,718,801Low
2Zignego Company, Inc.$10,948,012+2.0%
3Chippewa Concrete Services, Inc.$11,114,460+4.0%
WisDOT contract 20260210031: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Vinton Construction Company2. Zignego Company, Inc.3. Chippewa Concrete Services, Inc.
1Removing small pipe culverts (203.0100)EACH4$890.00$1,500.00$511.00
2Removing concrete pavement (204.0100)SY6,591$4.26$10.74$12.86
3Removing asphaltic surface (204.0110)SY3,645$5.54$10.00$4.89
4Removing asphaltic surface butt joints (204.0115)SY1,105$6.00$6.00$6.13
5Removing asphaltic surface milling (204.0120)SY169,321$2.40$2.40$2.45
6Removing curb & gutter (204.0150)LF194$10.00$10.00$10.37
7Removing guardrail (204.0165)LF10,314$1.73$1.73$1.77
8Removing delineators and markers (204.0180)EACH494$7.00$7.00$7.15
9Removing surface drains (204.0190)EACH24$200.00$500.00$357.70
10Removing storm sewer (size) 01. 18-inch (204.0245)LF97$19.00$75.00$54.27
11Removing (item description) 01. removing underdrain endwalls (204.9060.S)EACH8$185.00$400.00$204.40
12Removing (item description) 01. removing underdrain (204.9090.S)LF60$10.00$20.00$10.22
13Excavation common (205.0100)CY390$43.42$80.00$24.31
14Borrow (208.0100)CY35$41.14$50.00$10.73
15Backfill granular grade 2 (209.2500)TON940$10.00$0.01$34.09
16Prepare foundation for asphaltic paving (project) 01. 1058-25-60 (211.0101)EACH1$25,450$25,450$26,010
17Prepare foundation for asphaltic paving (project) 02. 1058-25-80 (211.0101)EACH1$25,450$25,450$26,010
18Prepare foundation for asphaltic shoulders (211.0400)STA63$260.00$260.00$265.72
19Prepare foundation for base aggregate (211.0500)STA50$102.00$200.00$158.41
20Finishing roadway (project) 01. 1058-25-60 (213.0100)EACH1$5,000.00$1,000.00$5,110.00
21Finishing roadway (project) 02. 1058-25-80 (213.0100)EACH1$5,000.00$1,000.00$5,110.00
22Base aggregate dense 3/4-inch (305.0110)TON10,615$25.56$26.50$28.87
23Base aggregate dense 1 1/4-inch (305.0120)TON2,520$20.50$0.01$24.56
24Base aggregate open-graded (310.0110)TON300$40.19$0.01$25.44
25Concrete pavement 8-inch (415.0080)SY894$91.27$74.00$142.56
26Concrete pavement 10-inch (415.0100)SY4,855$41.07$73.00$92.38
27Concrete pavement approach slab (415.0410)SY751$220.00$203.00$318.35
28Rout and seal (415.6000.S)LF228,520$0.70$0.61$0.62
29Drilled tie bars (416.0610)EACH4,553$9.00$20.00$8.18
30Drilled dowel bars (416.0620)EACH24,854$15.00$20.00$12.26
31Concrete pavement repair (416.1710)SY13,083.70$91.44$83.63$95.82
32Concrete pavement replacement (416.1720)SY20,451$94.94$83.63$95.82
33Continuous diamond grinding concrete pavement (420.1000)SY62,570$4.80$4.75$4.85
34HMA cold weather paving (450.4000)TON1,610$3.50$3.50$3.58
35Tack coat (455.0605)GAL10,557$2.25$2.25$2.30
36Incentive density HMA pavement (460.2000)DOL12,945$1.00$1.00$1.00
37HMA pavement 4 LT 58-28 S (460.5224)TON15,301$79.65$79.65$81.40
38HMA pavement 4 MT 58-28 S (460.6224)TON4,940$81.80$81.80$83.60
39Asphaltic surface (465.0105)TON388$187.60$187.60$191.73
40Asphaltic surface patching (465.0110)TON4,665$77.30$77.30$79.00
41Asphaltic rumble strips, shoulder divided roadway (465.0510)LF119,415$0.14$0.14$0.14
42Asphaltic rumble strips, centerline (465.0560)LF1,479$0.60$0.60$0.61
43Concrete collars for pipe (520.8000)EACH3$888.00$1,500.00$919.80
44Culvert pipe reinforced concrete class III 18-inch (522.0118)LF104$173.30$250.00$189.99
45Culvert pipe reinforced concrete class IV 18-inch (522.0418)LF66$166.50$250.00$189.99
46Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018)EACH4$1,592.00$2,500.00$1,533.00
47Culvert pipe salvaged 24-inch (524.0124)LF22$109.00$250.00$127.85
48Culvert pipe salvaged 54-inch (524.0154)LF32$170.00$550.00$295.87
49Culvert pipe salvaged 60-inch (524.0160)LF30$220.00$650.00$317.02
50Apron endwalls for culvert pipe salvaged 18-inch (524.0618)EACH3$785.00$1,200.00$511.00
51Apron endwalls for culvert pipe salvaged 24-inch (524.0624)EACH1$2,403.00$1,300.00$766.50
52Apron endwalls for culvert pipe salvaged 54-inch (524.0654)EACH1$2,190.00$1,850.00$1,533.00
53Apron endwalls for culvert pipe salvaged 60-inch (524.0660)EACH1$2,282.00$2,500.00$2,044.00
54Concrete curb type G (601.0115)LF37$75.00$60.00$77.62
55Concrete curb & gutter 4-inch sloped 36-inch type A (601.0551)LF165$45.00$60.00$85.69
56Concrete curb & gutter 4-inch sloped 30-inch type J (601.0576)LF8$75.00$60.00$84.07
57Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590)LF813$55.00$60.00$85.69
58Concrete surface drains (602.3010)CY39.60$0.01$1,000.00$1,548.81
59Concrete rumble strips, shoulder divided roadway (602.3210)LF109,145$0.75$0.75$0.77
60Riprap medium (606.0200)CY102$213.76$0.01$110.89
61Riprap heavy (606.0300)CY578$46.40$0.01$97.24
62Adjusting inlet covers (611.8115)EACH1$520.00$2,250.00$766.50
63Pipe underdrain unperforated 6- inch (612.0206)LF247$29.75$55.00$9.30
64Apron endwalls for underdrain reinforced concrete 6-inch (612.0806)EACH4$325.00$600.00$511.00
65Barrier system grading shaping finishing (614.0010)EACH32$3,193.60$5,000.00$2,650.05
66Steel thrie beam bullnose terminal (614.0220)EACH6$13,000$13,000$13,286
67Steel thrie beam (614.0230)LF725$34.00$34.00$34.75
68Replacing guardrail posts and blocks (614.0950)EACH6$113.00$113.00$115.49
69Replacing guardrail rail and hardware (614.0951)LF150$11.00$11.00$11.24
70MGS guardrail 3 (614.2300)LF6,727.50$24.03$24.03$24.56
71MGS thrie beam transition (614.2500)LF1,182$87.33$87.33$89.25
72MGS guardrail terminal eat (614.2610)EACH29$3,253.00$3,253.00$3,324.57
73MGS guardrail terminal type 2 (614.2620)EACH1$2,333.00$2,333.00$2,384.33
74Maintenance and repair of haul roads (project) 01. 1058-25-60 (618.0100)EACH1$0.01$1.00$102.20
75Maintenance and repair of haul roads (project) 02. 1058-25-80 (618.0100)EACH1$0.01$1.00$102.20
76Mobilization (619.1000)EACH1$865,000$839,000$485,971
77Concrete median sloped nose (620.0300)SF42$15.00$30.00$16.45
78Water (624.0100)MGAL80$50.00$200.00$25.55
79Topsoil (625.0100)SY5,755$3.95$8.00$6.49
80Silt fence (628.1504)LF8,571$1.55$1.55$1.58
81Silt fence maintenance (628.1520)LF8,571$0.03$0.03$0.03
82Mobilizations erosion control (628.1905)EACH12$153.00$153.00$156.37
83Mobilizations emergency erosion control (628.1910)EACH12$233.00$233.00$238.13
84Erosion mat class I type A (628.2002)SY5,225$1.00$1.00$1.02
85Erosion mat urban class I type A (628.2006)SY560$2.50$2.50$2.56
86Inlet protection type A (628.7005)EACH1$100.00$100.00$102.20
87Temporary ditch checks (628.7504)LF68$7.00$7.00$7.15
88Culvert pipe checks (628.7555)EACH3$50.00$50.00$51.10
89Rock bags (628.7570)EACH323$5.00$5.00$5.11
90Fertilizer type B (629.0210)CWT4.30$125.00$125.00$127.75
91Seeding mixture no. 30 (630.0130)LB135$8.00$8.00$8.18
92Seed water (630.0500)MGAL164$5.00$5.00$5.11
93Delineator posts steel (633.0100)EACH494$33.00$33.00$33.73
94Delineator reflectors (633.0500)EACH494$9.00$9.00$9.20
95Markers culvert end (633.5200)EACH10$65.00$65.00$66.43
96Posts tubular steel 2X2-inch X 11- FT (634.0811)EACH1$200.00$200.00$204.40
97Posts tubular steel 2X2-inch X 14- FT (634.0814)EACH9$250.00$250.00$255.50
98Signs type II reflective H (637.2210)SF71$25.00$25.00$25.55
99Moving signs type II (638.2102)EACH3$150.00$150.00$153.30
100Removing signs type II (638.2602)EACH5$25.00$25.00$25.55
101Removing small sign supports (638.3000)EACH8$25.00$25.00$25.55
102Field office type B (642.5001)EACH1$1,000.00$20,000$10,220
103Traffic control drums (643.0300)DAY97,366$0.20$0.20$0.20
104Digital speed reduction system (DSRS) (643.0370.S)DAY356$81.75$81.75$83.55
105Traffic control barricades type III (643.0420)DAY3,968$1.25$1.25$1.28
106Traffic control warning lights type A (643.0705)DAY7,936$0.25$0.25$0.26
107Traffic control warning lights type C (643.0715)DAY20,150$0.25$0.25$0.26
108Traffic control connected arrow boards (643.0810)DAY356$13.20$13.20$13.49
109Traffic control signs (643.0900)DAY41,356$0.20$0.20$0.20
110Traffic control covering signs type I (643.0910)EACH12$440.00$440.00$449.68
111Traffic control covering signs type II (643.0920)EACH55$135.00$135.00$137.97
112Traffic control signs fixed message (643.1000)SF258.50$22.45$22.45$22.94
113Traffic control signs PCMS (643.1050)DAY107$18.00$18.00$18.40
114Traffic control cones 42-inch (643.1070)DAY225,704$0.20$0.20$0.20
115Traffic control connected work zone start and end location markers (643.1220)DAY356$5.25$5.25$5.37
116Temporary marking line paint 6- inch (643.3165)LF14,610$0.40$0.40$0.41
117Temporary marking line removable tape 6-inch (643.3180)LF25,772$1.75$1.75$1.79
118Temporary marking line removable tape 10-inch (643.3280)LF4,800$3.50$3.50$3.58
119Traffic control (643.5000)EACH1$205,000$205,000$209,510
120Geotextile type HR (645.0120)SY1,190$2.00$6.00$7.31
121Marking line grooved black epoxy 6-inch (646.2025)LF33,405$0.80$0.80$0.82
122Marking line grooved wet ref epoxy 6-inch (646.2040)LF343,049$1.12$1.12$1.14
123Marking line grooved wet ref epoxy 10-inch (646.4040)LF16,093$2.52$2.52$2.58
124Marking arrow epoxy (646.5020)EACH10$238.91$238.91$244.17
125Marking word epoxy (646.5120)EACH4$356.84$356.84$364.69
126Marking symbol epoxy (646.5220)EACH1$342.12$342.12$349.65
127Marking outfall epoxy (646.5520)EACH762$45.84$45.84$46.85
128Marking stop line epoxy 18-inch (646.6120)LF276$14.79$14.79$15.12
129Marking diagonal epoxy 12-inch (646.7120)LF1,738$10.51$10.51$10.74
130Marking chevron epoxy 24-inch (646.7220)LF953$18.58$18.58$18.99
131Marking corrugated median epoxy (646.8020)SF973$8.35$8.35$8.53
132Marking curb epoxy (646.8120)LF485$7.07$7.07$7.23
133Marking island nose epoxy (646.8220)EACH16$265.89$265.89$271.74
134Marking parking stall epoxy (646.8320)LF2,292$7.34$7.34$7.50
135Marking removal line 4-inch (646.9000)LF1,486$1.10$1.10$1.12
136Construction staking subgrade (650.4500)LF555$0.01$0.01$0.01
137Construction staking base (650.5000)LF555$1.00$1.00$1.02
138Construction staking curb gutter and curb & gutter (650.5500)LF1,023$0.90$0.90$0.92
139Construction staking pipe culverts (650.6000)EACH9$100.00$100.00$102.20
140Construction staking resurfacing reference (650.8000)LF127,124$0.08$0.08$0.08
141Construction staking supplemental control (project) 01. 1058-25-60 (650.9911)EACH1$10.00$10.00$10.22
142Construction staking supplemental control (project) 02. 1058-25-80 (650.9911)EACH1$10.00$10.00$10.22
143Construction staking slope stakes (650.9920)LF555$1.50$1.50$1.53
144Removing pull boxes (653.0905)EACH2$500.00$500.00$689.85
145Sawing asphalt (690.0150)LF1,244$1.95$2.95$1.99
146Sawing concrete (690.0250)LF91,022$2.35$3.35$2.40
147Incentive compressive strength concrete pavement (715.0720)DOL1,953$1.00$1.00$1.00
148Special 01. removing raised pavement markers & filling voids (SPV.0060)EACH910$50.00$50.00$91.98
149Special 02. locate and clean existing underdrain outfalls (SPV.0060)EACH762$35.00$35.00$35.77
150Special 03. grading shaping and finishing for culvert modifications (SPV.0060)EACH7$833.00$1,500.00$1,566.73
151Special 04. grading, shaping and finishing for culvert replacement sta 2667+22 (SPV.0060)EACH1$1,733.00$5,000.00$9,436.13
152Special 05. grading, shaping, and finishing for culvert replacement sta 2659+55 (SPV.0060)EACH1$1,733.00$5,000.00$9,436.13
153Special 06. underdrain connection to inlet (SPV.0060)EACH2$765.00$1,500.00$664.30
154Special 07. connect underdrain 6- inch (SPV.0060)EACH8$333.75$250.00$204.40
155Special 01. construction staking concrete pavement reference (SPV.0090)LF2,267$2.00$2.00$2.04
156Special 03. concrete joint and crack cleaning, repair and sealing (SPV.0090)LF1,458$5.00$13.00$17.53
157Special 01. removing distressed asphaltic surface milling (SPV.0180)SY33,698$3.45$3.45$3.53
WisDOT contract 20260210031: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of February 10, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy