WisDOT contract 20260310003 bid tabulation
Watertown - Waukesha; CTH L/ BUS 26 to E Main Street (STH 016, Dodge County Watertown - Waukesha). Let by Wisconsin DOT on March 10, 2026, Dodge. 3 bids received; low bid $1,867,593 by Payne and Dolan, Inc.
- Owner
- Wisconsin DOT
- Letting
- 10 MAR 2026
- Pay items
- 102
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Payne and Dolan, Inc | $1,867,593 | Low |
| 2 | Rock Road Companies, Inc. | $2,234,775 | +20% |
| 3 | Stark Pavement Corporation | $2,522,576 | +35% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Payne and Dolan, Inc | 2. Rock Road Companies, Inc. | 3. Stark Pavement Corporation |
|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 3 | $500.00 | $500.00 | $950.00 |
| 2 | Removing concrete pavement (204.0100) | SY | 282 | $0.01 | $0.01 | $30.00 |
| 3 | Removing asphaltic surface (204.0110) | SY | 3,784 | $2.50 | $2.15 | $5.20 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 180 | $25.00 | $21.94 | $7.20 |
| 5 | Removing asphaltic surface milling (204.0120) | SY | 48,762 | $1.50 | $4.07 | $4.30 |
| 6 | Removing curb & gutter (204.0150) | LF | 60 | $22.84 | $22.84 | $35.00 |
| 7 | Removing concrete sidewalk (204.0155) | SY | 36 | $38.06 | $38.06 | $35.00 |
| 8 | Removing guardrail (204.0165) | LF | 8,241 | $2.00 | $2.00 | $2.00 |
| 9 | Removing surface drains (204.0190) | EACH | 1 | $250.00 | $250.00 | $1,000.00 |
| 10 | Prepare foundation for asphaltic paving (project) 01. 1370-00-75 (211.0101) | EACH | 1 | $150.00 | $1,500.00 | $4,800.00 |
| 11 | Finishing roadway (project) 01. 1370-00-75 (213.0100) | EACH | 1 | $150.00 | $5,637.90 | $4,800.00 |
| 12 | Base aggregate dense 3/4-inch (305.0110) | TON | 2,616 | $24.00 | $27.02 | $24.00 |
| 13 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 156 | $22.50 | $22.50 | $40.00 |
| 14 | Removing pavement for base patching (390.0100) | CY | 250 | $126.60 | $126.60 | $95.00 |
| 15 | Base patching concrete hes (390.0305) | CY | 250 | $254.79 | $254.79 | $320.00 |
| 16 | Concrete pavement 8-inch (415.0080) | SY | 110 | $112.94 | $112.94 | $120.00 |
| 17 | Drilled tie bars (416.0610) | EACH | 240 | $10.13 | $10.13 | $17.00 |
| 18 | Drilled dowel bars (416.0620) | EACH | 160 | $15.91 | $15.91 | $30.00 |
| 19 | Concrete pavement repair (416.1710) | SY | 20 | $105.22 | $105.22 | $325.00 |
| 20 | Concrete pavement replacement (416.1720) | SY | 250 | $116.18 | $116.18 | $160.00 |
| 21 | Tack coat (455.0605) | GAL | 7,591 | $0.01 | $3.56 | $3.00 |
| 22 | Incentive density HMA pavement (460.2000) | DOL | 6,670 | $1.00 | $1.00 | $1.00 |
| 23 | HMA pavement interlayer (460.4210.S) | TON | 1,909 | $90.00 | $120.69 | $126.00 |
| 24 | HMA pavement 5 MT 58-28 S (460.6225) | TON | 1,395 | $78.25 | $91.94 | $99.00 |
| 25 | HMA pavement 4 MT 58-28 H (460.6424) | TON | 7,846 | $81.50 | $86.64 | $88.00 |
| 26 | Culvert pipe liners (size) 01. 24- inch (520.9700.S) | LF | 80 | $115.00 | $115.00 | $115.00 |
| 27 | Culvert pipe liners (size) 02. 30- inch (520.9700.S) | LF | 91 | $170.00 | $170.00 | $170.00 |
| 28 | Culvert pipe liners (size) 03. 36- inch (520.9700.S) | LF | 108 | $199.00 | $199.00 | $199.00 |
| 29 | Cleaning culvert pipes for liner verification (520.9750.S) | EACH | 3 | $750.00 | $750.00 | $750.00 |
| 30 | Apron endwalls for culvert pipe steel 12-inch (521.1012) | EACH | 4 | $375.00 | $375.00 | $631.25 |
| 31 | Culvert pipe corrugated polyethylene 12-inch (530.0112) | LF | 242 | $42.50 | $42.50 | $106.05 |
| 32 | Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553) | LF | 60 | $70.30 | $70.30 | $65.00 |
| 33 | Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590) | LF | 276 | $58.84 | $58.84 | $65.00 |
| 34 | Concrete curb pedestrian (601.0600) | LF | 27 | $22.00 | $22.00 | $45.00 |
| 35 | Concrete sidewalk 5-inch (602.0410) | SF | 314 | $22.38 | $22.38 | $40.00 |
| 36 | Curb ramp detectable warning field natural patina (602.0515) | SF | 27 | $36.45 | $36.45 | $65.00 |
| 37 | Riprap medium (606.0200) | CY | 8 | $100.00 | $100.00 | $115.00 |
| 38 | Reconstructing inlets (611.0430) | EACH | 2 | $1,300.00 | $1,300.00 | $2,626.00 |
| 39 | Inlet covers type V (611.0654) | EACH | 4 | $1,060.00 | $1,060.00 | $1,262.50 |
| 40 | Inlets 2X2-FT (611.3220) | EACH | 4 | $1,750.00 | $1,750.00 | $1,666.50 |
| 41 | Barrier system grading shaping finishing (614.0010) | EACH | 14 | $3,400.00 | $3,400.00 | $6,600.00 |
| 42 | MGS guardrail 3 (614.2300) | LF | 7,287.50 | $23.75 | $23.75 | $23.75 |
| 43 | MGS thrie beam transition (614.2500) | LF | 394 | $85.00 | $85.00 | $85.00 |
| 44 | MGS guardrail terminal eat (614.2610) | EACH | 14 | $3,495.00 | $3,495.00 | $3,495.00 |
| 45 | Maintenance and repair of haul roads (project) 01. 1370-00-75 (618.0100) | EACH | 1 | $150.00 | $0.01 | $10.00 |
| 46 | Mobilization (619.1000) | EACH | 1 | $40,000 | $83,036 | $116,000 |
| 47 | Water (624.0100) | MGAL | 55 | $0.01 | $0.01 | $80.00 |
| 48 | Topsoil (625.0100) | SY | 317 | $10.00 | $10.00 | $10.00 |
| 49 | Silt fence (628.1504) | LF | 1,748 | $2.00 | $2.00 | $2.00 |
| 50 | Silt fence maintenance (628.1520) | LF | 1,748 | $0.01 | $0.01 | $0.01 |
| 51 | Mobilizations erosion control (628.1905) | EACH | 2 | $100.00 | $100.00 | $100.00 |
| 52 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $100.00 | $100.00 | $100.00 |
| 53 | Erosion mat urban class I type B (628.2008) | SY | 317 | $2.50 | $2.50 | $2.50 |
| 54 | Inlet protection type A (628.7005) | EACH | 4 | $150.00 | $150.00 | $150.00 |
| 55 | Inlet protection type C (628.7015) | EACH | 21 | $60.00 | $60.00 | $60.00 |
| 56 | Temporary ditch checks (628.7504) | LF | 120 | $9.00 | $9.00 | $9.00 |
| 57 | Tracking pads (628.7560) | EACH | 6 | $100.00 | $100.00 | $2,120.00 |
| 58 | Fertilizer type B (629.0210) | CWT | 1 | $150.00 | $150.00 | $150.00 |
| 59 | Seeding mixture no. 20 (630.0120) | LB | 15 | $30.00 | $30.00 | $30.00 |
| 60 | Seeding temporary (630.0200) | LB | 9 | $15.00 | $15.00 | $15.00 |
| 61 | Seed water (630.0500) | MGAL | 8 | $100.00 | $100.00 | $100.00 |
| 62 | Markers culvert end (633.5200) | EACH | 4 | $75.00 | $75.00 | $75.00 |
| 63 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 9 | $110.00 | $110.00 | $110.00 |
| 64 | Moving signs type II (638.2102) | EACH | 9 | $150.00 | $150.00 | $150.00 |
| 65 | Field office type B (642.5001) | EACH | 1 | $5,000.00 | $5,000.00 | $6,600.00 |
| 66 | Traffic control drums (643.0300) | DAY | 4,500 | $0.15 | $0.44 | $0.44 |
| 67 | Traffic control barricades type III (643.0420) | DAY | 4,198 | $0.47 | $0.45 | $0.45 |
| 68 | Traffic control warning lights type A (643.0705) | DAY | 5,990 | $0.06 | $0.26 | $0.26 |
| 69 | Traffic control signs (643.0900) | DAY | 28,284 | $0.25 | $0.49 | $0.49 |
| 70 | Traffic control covering signs type I (643.0910) | EACH | 10 | $225.00 | $73.90 | $73.90 |
| 71 | Traffic control covering signs type II (643.0920) | EACH | 29 | $50.00 | $50.97 | $50.97 |
| 72 | Traffic control signs PCMS (643.1050) | DAY | 38 | $35.44 | $64.51 | $64.51 |
| 73 | Temporary marking crosswalk paint 6-inch (643.3305) | LF | 350 | $3.90 | $9.00 | $9.00 |
| 74 | Traffic control (643.5000) | EACH | 1 | $19,000 | $15,268 | $15,268 |
| 75 | Temporary pedestrian surface plate (644.1430) | SF | 80 | $25.00 | $6.27 | $6.27 |
| 76 | Temporary pedestrian curb ramp (644.1601) | DAY | 15 | $9.50 | $25.32 | $25.32 |
| 77 | Temporary pedestrian detectable warning field (644.1605) | SF | 20 | $12.00 | $19.46 | $19.46 |
| 78 | Temporary pedestrian barricade (644.1810) | LF | 28 | $8.00 | $14.26 | $14.26 |
| 79 | Temporary audible message devices (644.1900.S) | DAY | 15 | $10.00 | $16.63 | $16.63 |
| 80 | Geotextile type HR (645.0120) | SY | 26 | $6.00 | $6.00 | $5.00 |
| 81 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 46,823 | $1.25 | $1.25 | $1.25 |
| 82 | Marking line grooved wet ref epoxy 8-inch (646.3040) | LF | 110 | $2.30 | $2.30 | $2.30 |
| 83 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 2,067 | $2.40 | $2.40 | $2.40 |
| 84 | Marking arrow epoxy (646.5020) | EACH | 15 | $330.00 | $330.00 | $330.00 |
| 85 | Marking word epoxy (646.5120) | EACH | 4 | $320.00 | $320.00 | $320.00 |
| 86 | Marking symbol epoxy (646.5220) | EACH | 1 | $330.00 | $330.00 | $330.00 |
| 87 | Marking stop line epoxy 18-inch (646.6120) | LF | 372 | $15.50 | $15.50 | $15.50 |
| 88 | Marking diagonal epoxy 12-inch (646.7120) | LF | 56 | $13.00 | $13.00 | $13.00 |
| 89 | Marking corrugated median epoxy (646.8020) | SF | 3,335 | $3.70 | $3.70 | $3.70 |
| 90 | Marking curb epoxy (646.8120) | LF | 235 | $13.00 | $13.00 | $13.00 |
| 91 | Construction staking storm sewer (650.4000) | EACH | 8 | $168.68 | $168.68 | $168.68 |
| 92 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 70 | $6.38 | $6.38 | $6.38 |
| 93 | Construction staking resurfacing reference (650.8000) | LF | 13,991 | $0.19 | $0.19 | $0.19 |
| 94 | Construction staking curb ramps (650.9000) | EACH | 3 | $228.65 | $228.65 | $228.65 |
| 95 | Construction staking supplemental control (project) 01. 1370-00-75 (650.9911) | EACH | 1 | $780.88 | $780.88 | $780.88 |
| 96 | Sawing asphalt (690.0150) | LF | 292 | $1.15 | $2.50 | $1.15 |
| 97 | Sawing concrete (690.0250) | LF | 256 | $2.25 | $2.50 | $2.25 |
| 98 | Incentive iri ride (740.0440) | DOL | 5,450 | $1.00 | $1.00 | $1.00 |
| 99 | Installing and maintaining climbing turtle exclusion fence (999.2100.S) | LF | 500 | $5.00 | $5.00 | $5.00 |
| 100 | Special 01. utility line opening (ulo) (SPV.0060) | EACH | 2 | $850.00 | $850.00 | $1,000.00 |
| 101 | Special 01. joint and crack plunge milling and patching (SPV.0090) | LF | 1,164 | $1.50 | $23.69 | $70.00 |
| 102 | Special 01. remove distressed pavement milling (SPV.0180) | SY | 1,485 | $3.50 | $9.44 | $27.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of March 10, 2026. Compiled by Mirage Metrics.