WisDOT contract 20260310015 bid tabulation
1060-48-70. Let by Wisconsin DOT on March 10, 2026, Milwaukee. 5 bids received; low bid $9,640,000 by American Civil Constructors West Coast L.
- Owner
- Wisconsin DOT
- Letting
- 10 MAR 2026
- Pay items
- 84
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | American Civil Constructors West Coast L | $9,640,000 | Low |
| 2 | Myers & Sons Construction, LLC | $12,690,829 | +32% |
| 3 | Truesdell Corporation of Wisconsin, Inc. | $12,897,897 | +34% |
| 4 | Zenith Tech., Inc. - Waukesha | $13,090,806 | +36% |
| 5 | Lunda Construction Company | $14,764,178 | +53% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. American Civil Constructors West Coast L | 2. Myers & Sons Construction, LLC | 3. Truesdell Corporation of Wisconsin, Inc. | 4. Zenith Tech., Inc. - Waukesha | 5. Lunda Construction Company |
|---|---|---|---|---|---|---|---|---|
| 1 | Removing structure (structure) 400. B-40-1222 (203.0220) | EACH | 1 | $15,003 | $120,000 | $150,000 | $100,000 | $120,000 |
| 2 | Debris containment over waterway (structure) 401. B-40-1312-004 (203.0335) | EACH | 1 | $10,000 | $16,574 | $100.00 | $5,000.00 | $0.01 |
| 3 | Debris containment over waterway (structure) 402. B-40-1412-004 (203.0335) | EACH | 1 | $10,000 | $16,574 | $100.00 | $6,000.00 | $0.01 |
| 4 | Removing guardrail (204.0165) | LF | 20 | $125.00 | $100.00 | $3.00 | $2.00 | $2.00 |
| 5 | Removing (item description) 001. removing permanent crash cushion (204.9060.S) | EACH | 3 | $6,000.00 | $500.00 | $600.00 | $2,285.00 | $2,285.00 |
| 6 | Removing (item description) 100. removing electrical cables from existing conduit (204.9090.S) | LF | 944 | $7.50 | $1.12 | $1.25 | $6.95 | $6.95 |
| 7 | Concrete pavement partial depth repair crack repair (416.0752.S) | LF | 54 | $200.00 | $678.00 | $700.00 | $678.00 | $678.00 |
| 8 | Cold patch (495.1000.S) | TON | 20 | $1,000.00 | $100.00 | $100.00 | $400.00 | $100.00 |
| 9 | Concrete masonry bridges (502.0100) | CY | 3 | $8,000.00 | $15,000 | $15,500 | $27,000 | $15,000 |
| 10 | Pigmented surface sealer reseal (502.3205) | SY | 751 | $26.00 | $15.50 | $17.00 | $115.00 | $15.50 |
| 11 | Pigmented surface sealer (502.3210) | SY | 3 | $500.00 | $15.50 | $17.00 | $150.00 | $15.50 |
| 12 | Protective surface treatment reseal (502.3215) | SY | 50,358 | $8.25 | $7.04 | $6.00 | $6.00 | $6.50 |
| 13 | Adhesive anchors no. 5 bar (502.4205) | EACH | 14 | $250.00 | $25.00 | $30.00 | $60.00 | $25.00 |
| 14 | Bar steel reinforcement HS coated structures (505.0600) | LB | 230 | $20.00 | $7.50 | $8.00 | $38.00 | $7.50 |
| 15 | Preparation decks type 1 (509.0301) | SY | 13 | $1,500.00 | $350.00 | $400.00 | $1,500.00 | $350.00 |
| 16 | Sawing pavement deck preparation areas (509.0310.S) | LF | 130 | $40.00 | $15.00 | $16.00 | $50.00 | $15.00 |
| 17 | Cleaning decks (509.0500) | SY | 60,064 | $9.00 | $31.81 | $31.00 | $47.00 | $29.95 |
| 18 | Concrete surface repair (509.1500) | SF | 92 | $450.00 | $260.00 | $275.00 | $600.00 | $260.00 |
| 19 | Concrete staining (structure) 400. B-40-1222 (517.1010.S) | SF | 39 | $150.00 | $40.00 | $43.00 | $120.00 | $40.00 |
| 20 | Crash cushions permanent (614.0800) | EACH | 3 | $40,250 | $62,479 | $35,000 | $36,500 | $36,500 |
| 21 | Fence chain link 6-FT (616.0206) | LF | 965 | $50.00 | $33.08 | $34.00 | $47.99 | $47.99 |
| 22 | Gates chain link (width) 001. 20-FT (616.0329) | EACH | 2 | $5,000.00 | $3,115.00 | $3,400.00 | $4,000.00 | $4,000.00 |
| 23 | Maintenance and repair of haul roads (project) 001.1060-48-70 (618.0100) | EACH | 1 | $10,000 | $21,386 | $5,000.00 | $5,000.00 | $100.00 |
| 24 | Mobilization (619.1000) | EACH | 1 | $915,000 | $1,120,000 | $1,258,082 | $1,800,000 | $4,771,234 |
| 25 | Inlet protection type B (628.7010) | EACH | 236 | $140.00 | $125.00 | $52.00 | $48.00 | $48.00 |
| 26 | Signs type I reflective SH (637.1220) | SF | 3,042.50 | $52.00 | $49.00 | $29.00 | $27.00 | $27.00 |
| 27 | Signs type I reflective F (637.1230) | SF | 155 | $52.00 | $49.00 | $33.00 | $30.00 | $30.00 |
| 28 | Removing signs type I (638.2601) | EACH | 21 | $1,400.00 | $1,250.00 | $275.00 | $250.00 | $250.00 |
| 29 | Traffic control drums (643.0300) | DAY | 26,894 | $0.35 | $0.35 | $0.50 | $0.25 | $0.25 |
| 30 | Traffic control barricades type III (643.0420) | DAY | 2,968 | $0.60 | $0.60 | $0.75 | $1.00 | $1.00 |
| 31 | Traffic control warning lights type A (643.0705) | DAY | 5,936 | $0.10 | $0.10 | $0.25 | $0.25 | $0.25 |
| 32 | Traffic control warning lights type C (643.0715) | DAY | 5,872 | $0.10 | $0.10 | $0.25 | $0.25 | $0.25 |
| 33 | Traffic control connected arrow boards (643.0810) | DAY | 186 | $18.00 | $18.00 | $20.00 | $65.00 | $65.00 |
| 34 | Traffic control signs (643.0900) | DAY | 15,999 | $0.40 | $0.40 | $0.50 | $0.50 | $0.50 |
| 35 | Traffic control covering signs type II (643.0920) | EACH | 420 | $40.00 | $40.00 | $43.00 | $25.00 | $25.00 |
| 36 | Traffic control signs fixed message (643.1000) | SF | 196 | $20.00 | $20.00 | $22.00 | $18.00 | $18.00 |
| 37 | Traffic control signs PCMS (643.1050) | DAY | 172 | $35.00 | $35.00 | $38.00 | $24.00 | $24.00 |
| 38 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 182 | $10.00 | $10.00 | $11.00 | $40.00 | $40.00 |
| 39 | Temporary marking line removable tape 6-inch (643.3180) | LF | 49,103 | $2.10 | $2.10 | $2.25 | $1.90 | $1.90 |
| 40 | Temporary marking line removable tape 10-inch (643.3280) | LF | 11,658 | $3.50 | $3.50 | $3.75 | $3.75 | $3.75 |
| 41 | Temporary marking arrow removable tape (643.3550) | EACH | 1 | $140.00 | $140.00 | $200.00 | $155.00 | $155.00 |
| 42 | Traffic control interim lane closure (643.4100) | EACH | 113 | $900.00 | $900.00 | $1,300.00 | $1,500.00 | $925.00 |
| 43 | Traffic control (643.5000) | EACH | 1 | $350,000 | $230,500 | $350,000 | $250,000 | $135,000 |
| 44 | Temporary pedestrian barricade (644.1810) | LF | 72 | $8.00 | $8.00 | $9.00 | $7.50 | $7.50 |
| 45 | Temporary audible message devices (644.1900.S) | DAY | 147 | $5.00 | $5.00 | $6.00 | $5.00 | $5.00 |
| 46 | Marking line epoxy 6-inch (646.2020) | LF | 9,554 | $0.75 | $0.70 | $0.75 | $0.50 | $0.70 |
| 47 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 5,578 | $1.75 | $1.50 | $2.00 | $0.85 | $1.50 |
| 48 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 52,606 | $1.70 | $1.55 | $1.75 | $1.38 | $1.55 |
| 49 | Marking line epoxy 10-inch (646.4020) | LF | 2,943 | $1.25 | $1.15 | $1.50 | $1.05 | $1.15 |
| 50 | Marking line grooved black epoxy 10-inch (646.4025) | LF | 684 | $2.75 | $2.50 | $3.00 | $1.85 | $2.50 |
| 51 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 15,660 | $3.25 | $3.00 | $3.25 | $2.75 | $3.00 |
| 52 | Marking arrow epoxy (646.5020) | EACH | 28 | $250.00 | $230.00 | $250.00 | $361.30 | $230.00 |
| 53 | Marking word epoxy (646.5120) | EACH | 8 | $300.00 | $275.00 | $300.00 | $366.20 | $275.00 |
| 54 | Marking stop line epoxy 18-inch (646.6120) | LF | 230 | $13.00 | $12.00 | $13.00 | $15.00 | $12.00 |
| 55 | Marking diagonal epoxy 12-inch (646.7120) | LF | 4,229 | $11.00 | $9.75 | $11.00 | $14.80 | $9.75 |
| 56 | Marking chevron epoxy 24-inch (646.7220) | LF | 2,983 | $15.00 | $13.50 | $14.50 | $24.90 | $13.50 |
| 57 | Marking chevron epoxy 12-inch (646.7320) | LF | 68 | $14.00 | $12.00 | $13.00 | $24.10 | $12.00 |
| 58 | Marking island nose epoxy (646.8220) | EACH | 1 | $325.00 | $300.00 | $400.00 | $274.05 | $300.00 |
| 59 | Marking removal line 4-inch (646.9000) | LF | 5,445 | $0.60 | $0.50 | $1.00 | $2.70 | $2.70 |
| 60 | Marking removal line 8-inch (646.9100) | LF | 13,869 | $1.15 | $1.00 | $1.25 | $3.20 | $3.20 |
| 61 | Conduit rigid metallic 2-inch (652.0125) | LF | 21 | $160.00 | $165.20 | $200.00 | $124.18 | $124.18 |
| 62 | Electrical wire lighting 6 AWG (655.0625) | LF | 944 | $9.00 | $5.61 | $6.00 | $8.47 | $8.47 |
| 63 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 22 | $150.00 | $19.80 | $22.00 | $107.32 | $107.32 |
| 64 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,400 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 65 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 6,000 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 66 | Special 400. rapid set deck repair (SPV.0035) | CY | 13 | $1,500.00 | $3,000.00 | $3,000.00 | $5,000.00 | $3,000.00 |
| 67 | Special 001. traffic control close- open freeway entrance ramp (SPV.0060) | EACH | 123 | $500.00 | $400.00 | $500.00 | $850.00 | $315.00 |
| 68 | Special 002. traffic control close- open freeway to freeway system ramp (SPV.0060) | EACH | 56 | $600.00 | $500.00 | $750.00 | $1,500.00 | $925.00 |
| 69 | Special 003. traffic control full freeway closure (SPV.0060) | EACH | 50 | $5,000.00 | $5,000.00 | $2,500.00 | $2,250.00 | $2,250.00 |
| 70 | Special 004. removing sign lighting (SPV.0060) | EACH | 22 | $800.00 | $486.00 | $500.00 | $1,745.35 | $1,745.35 |
| 71 | Special 005. survey project 1060- 48-70 (SPV.0060) | EACH | 1 | $12,500 | $10,000 | $55,000 | $10,000 | $10,000 |
| 72 | Special 006. utility line opening (ulo) (SPV.0060) | EACH | 2 | $4,000.00 | $13,361 | $3,000.00 | $7,000.00 | $1,100.00 |
| 73 | Special 007. survey project 1060- 48-71 (SPV.0060) | EACH | 1 | $10,000 | $10,000 | $5,000.00 | $10,000 | $10,000 |
| 74 | Special 400. eye bolt drilled in (SPV.0060) | EACH | 3 | $2,000.00 | $500.00 | $550.00 | $1,800.00 | $500.00 |
| 75 | Special 401. remove, salvage, clean, and reset expansion device cover plate (SPV.0060) | EACH | 1 | $5,000.00 | $3,000.00 | $3,200.00 | $12,000 | $3,000.00 |
| 76 | Special 402. steel cover plate (SPV.0060) | EACH | 1 | $4,000.00 | $500.00 | $600.00 | $13,000 | $500.00 |
| 77 | Special 403. remove and reinstall thrie beam connection (SPV.0060) | EACH | 2 | $2,000.00 | $2,000.00 | $600.00 | $1,300.00 | $500.00 |
| 78 | Special 001. marking epoxy 6-inch black non grooved (SPV.0090) | LF | 1,400 | $1.25 | $1.10 | $1.50 | $0.75 | $1.10 |
| 79 | Special 002. marking epoxy 10-inch black non grooved (SPV.0090) | LF | 99 | $2.00 | $1.85 | $3.00 | $1.05 | $1.85 |
| 80 | Special 100. cable aerial aluminum 6 AWG quadruplex (SPV.0090) | LF | 880 | $16.00 | $15.04 | $16.00 | $13.15 | $13.15 |
| 81 | Special 400. strip seal gland replacement (SPV.0090) | LF | 750 | $85.00 | $175.00 | $185.00 | $225.00 | $175.00 |
| 82 | Special 001. resin binder high friction surface treatment (SPV.0180) | SY | 1,145 | $32.00 | $29.74 | $32.00 | $22.11 | $22.11 |
| 83 | Special 400. polyester polymer concrete overlay (SPV.0180) | SY | 60,064 | $89.50 | $114.59 | $118.50 | $92.75 | $97.70 |
| 84 | Special 401. high friction surface treatment polymer overlay (SPV.0180) | SY | 4,096 | $53.00 | $54.90 | $50.00 | $48.09 | $48.09 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of March 10, 2026. Compiled by Mirage Metrics.