WisDOT contract 20260310022 bid tabulation
4516-11-73. Let by Wisconsin DOT on March 10, 2026, Brown. 4 bids received; low bid $2,963,668 by MCC, Inc..
- Owner
- Wisconsin DOT
- Letting
- 10 MAR 2026
- Pay items
- 140
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | MCC, Inc. | $2,963,668 | Low |
| 2 | Vinton Construction Company | $2,971,933 | 0.0% |
| 3 | Peters Concrete Company | $3,110,716 | +5.0% |
| 4 | James Peterson Sons, Inc. | $3,406,460 | +15% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. MCC, Inc. | 2. Vinton Construction Company | 3. Peters Concrete Company | 4. James Peterson Sons, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0120) | ID | 30 | $30.00 | $30.00 | $30.00 | $80.00 |
| 2 | Grubbing (201.0220) | ID | 30 | $30.00 | $30.00 | $30.00 | $40.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 1 | $455.00 | $490.00 | $400.00 | $750.00 |
| 4 | Removing concrete pavement (204.0100) | SY | 1,305 | $4.60 | $8.31 | $6.95 | $12.00 |
| 5 | Removing asphaltic surface (204.0110) | SY | 992 | $5.25 | $5.39 | $4.50 | $4.50 |
| 6 | Removing asphaltic surface milling (204.0120) | SY | 10,915 | $5.65 | $0.01 | $4.60 | $4.60 |
| 7 | Removing curb & gutter (204.0150) | LF | 7,891 | $2.70 | $6.96 | $8.10 | $12.00 |
| 8 | Removing concrete sidewalk (204.0155) | SY | 835 | $5.80 | $9.00 | $8.30 | $10.00 |
| 9 | Removing surface drains (204.0190) | EACH | 8 | $455.00 | $100.00 | $150.00 | $750.00 |
| 10 | Removing manholes (204.0210) | EACH | 4 | $400.00 | $504.25 | $400.00 | $465.00 |
| 11 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 308 | $20.00 | $13.94 | $29.15 | $20.00 |
| 12 | Removing storm sewer (size) 02. 15-inch (204.0245) | LF | 376 | $20.00 | $17.65 | $30.85 | $20.00 |
| 13 | Excavation common (205.0100) | CY | 15,712 | $12.50 | $17.75 | $15.00 | $28.40 |
| 14 | Finishing roadway (project) 01. 4516-11-73 (213.0100) | EACH | 1 | $3,500.00 | $2,500.00 | $3,000.00 | $2,000.00 |
| 15 | Finishing roadway (project) 02. 4516-12-75 (213.0100) | EACH | 1 | $3,500.00 | $2,500.00 | $1,500.00 | $2,000.00 |
| 16 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 10,903 | $15.10 | $0.01 | $15.60 | $20.39 |
| 17 | Base aggregate dense 3-inch (305.0130) | TON | 13,910 | $14.35 | $15.90 | $18.35 | $17.00 |
| 18 | Drilled tie bars (416.0610) | EACH | 278 | $6.00 | $6.00 | $6.00 | $6.00 |
| 19 | HMA cold weather paving (450.4000) | TON | 2,450 | $0.01 | $2.00 | $2.00 | $2.00 |
| 20 | Tack coat (455.0605) | GAL | 2,010 | $4.05 | $3.00 | $3.00 | $3.00 |
| 21 | Incentive density HMA pavement (460.2000) | DOL | 9,786 | $1.00 | $1.00 | $1.00 | $1.00 |
| 22 | HMA pavement 3 LT 58-28 S (460.5223) | TON | 1,838 | $82.90 | $68.20 | $68.20 | $68.20 |
| 23 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 1,226 | $78.85 | $74.20 | $74.20 | $74.20 |
| 24 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 4,979 | $81.15 | $70.30 | $70.30 | $70.30 |
| 25 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 1,743 | $80.75 | $77.20 | $77.20 | $77.20 |
| 26 | Asphaltic surface driveways and field entrances (465.0120) | TON | 117 | $200.00 | $165.00 | $165.00 | $165.00 |
| 27 | Bar steel reinforcement HS structures (505.0400) | LB | 985 | $2.45 | $2.45 | $2.45 | $2.45 |
| 28 | Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012) | EACH | 1 | $1,300.00 | $1,502.05 | $1,950.00 | $1,350.00 |
| 29 | Concrete curb & gutter 18-inch type A (601.0405) | LF | 106 | $52.50 | $52.50 | $52.50 | $52.50 |
| 30 | Concrete curb & gutter 18-inch type D (601.0407) | LF | 161 | $51.50 | $51.50 | $51.50 | $51.50 |
| 31 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 85 | $53.00 | $53.00 | $53.00 | $53.00 |
| 32 | Concrete curb pedestrian (601.0600) | LF | 21 | $50.00 | $50.00 | $50.00 | $50.00 |
| 33 | Concrete sidewalk 4-inch (602.0405) | SF | 52,776 | $6.10 | $6.10 | $6.10 | $6.10 |
| 34 | Concrete sidewalk 6-inch (602.0415) | SF | 3,749 | $7.85 | $7.85 | $7.85 | $7.85 |
| 35 | Curb ramp detectable warning field yellow (602.0505) | SF | 434 | $34.00 | $34.00 | $34.00 | $34.00 |
| 36 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 51 | $60.00 | $60.00 | $60.00 | $60.00 |
| 37 | Concrete driveway 6-inch (602.0810) | SY | 917 | $68.75 | $68.75 | $68.75 | $68.75 |
| 38 | Concrete driveway 8-inch (602.0820) | SY | 579 | $79.25 | $79.25 | $79.25 | $79.25 |
| 39 | Relaid storm sewer 15-inch (608.0115) | LF | 50 | $86.00 | $88.49 | $102.00 | $95.00 |
| 40 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 238 | $70.00 | $85.05 | $101.00 | $105.00 |
| 41 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 45 | $102.00 | $132.50 | $139.00 | $195.00 |
| 42 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 20 | $169.00 | $181.07 | $190.00 | $315.00 |
| 43 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 220 | $71.00 | $83.36 | $98.75 | $95.00 |
| 44 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 359 | $92.00 | $98.27 | $86.25 | $95.00 |
| 45 | Reconstructing catch basins (611.0410) | EACH | 11 | $1,000.00 | $1,024.91 | $800.00 | $1,500.00 |
| 46 | Reconstructing manholes (611.0420) | EACH | 23 | $1,000.00 | $1,338.63 | $750.00 | $1,450.00 |
| 47 | Reconstructing inlets (611.0430) | EACH | 13 | $1,000.00 | $1,047.29 | $800.00 | $1,500.00 |
| 48 | Inlet covers type C (611.0612) | EACH | 7 | $591.00 | $564.20 | $550.00 | $600.00 |
| 49 | Inlet covers type H-S (611.0639) | EACH | 8 | $831.00 | $777.31 | $800.00 | $800.00 |
| 50 | Manholes 4-FT diameter (611.2004) | EACH | 3 | $4,487.00 | $6,967.96 | $5,450.00 | $5,150.00 |
| 51 | Manholes 6X6-FT (611.2066) | EACH | 1 | $14,978 | $18,337 | $11,750 | $14,500 |
| 52 | Inlets 3-FT diameter (611.3003) | EACH | 7 | $2,705.00 | $2,302.10 | $2,750.00 | $2,850.00 |
| 53 | Inlets 2X3-FT (611.3230) | EACH | 7 | $2,976.00 | $2,821.46 | $2,830.00 | $3,350.00 |
| 54 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 1,389 | $12.50 | $13.97 | $26.00 | $15.00 |
| 55 | Maintenance and repair of haul roads (project) 01. 4516-11-73 (618.0100) | EACH | 1 | $500.00 | $0.01 | $1.00 | $500.00 |
| 56 | Maintenance and repair of haul roads (project) 02. 4516-12-75 (618.0100) | EACH | 1 | $500.00 | $0.01 | $1.00 | $500.00 |
| 57 | Mobilization (619.1000) | EACH | 1 | $140,300 | $360,000 | $261,000 | $189,160 |
| 58 | Water (624.0100) | MGAL | 349 | $32.23 | $0.01 | $1.00 | $45.00 |
| 59 | Topsoil (625.0100) | SY | 17,915 | $6.35 | $5.00 | $6.34 | $6.75 |
| 60 | Silt fence (628.1504) | LF | 3,499 | $1.95 | $1.80 | $1.80 | $1.80 |
| 61 | Silt fence maintenance (628.1520) | LF | 3,499 | $0.01 | $0.01 | $0.01 | $0.01 |
| 62 | Mobilizations erosion control (628.1905) | EACH | 6 | $150.00 | $0.01 | $0.01 | $0.01 |
| 63 | Mobilizations emergency erosion control (628.1910) | EACH | 6 | $100.00 | $0.01 | $0.01 | $0.01 |
| 64 | Erosion mat urban class I type B (628.2008) | SY | 20,603 | $1.85 | $0.01 | $0.01 | $0.01 |
| 65 | Inlet protection type A (628.7005) | EACH | 15 | $5.00 | $20.00 | $20.00 | $20.00 |
| 66 | Inlet protection type B (628.7010) | EACH | 11 | $65.00 | $20.00 | $20.00 | $20.00 |
| 67 | Inlet protection type C (628.7015) | EACH | 32 | $68.00 | $20.00 | $20.00 | $20.00 |
| 68 | Temporary ditch checks (628.7504) | LF | 180 | $7.50 | $6.25 | $6.25 | $6.25 |
| 69 | Culvert pipe checks (628.7555) | EACH | 6 | $15.00 | $16.00 | $16.00 | $16.00 |
| 70 | Tracking pads (628.7560) | EACH | 2 | $1,380.02 | $0.01 | $500.00 | $3,500.00 |
| 71 | Rock bags (628.7570) | EACH | 43 | $15.00 | $16.00 | $16.00 | $16.00 |
| 72 | Fertilizer type B (629.0210) | CWT | 10 | $95.00 | $340.00 | $340.00 | $340.00 |
| 73 | Seeding mixture no. 40 (630.0140) | LB | 402 | $7.50 | $75.00 | $75.00 | $75.00 |
| 74 | Seeding temporary (630.0200) | LB | 482 | $4.00 | $18.00 | $18.00 | $18.00 |
| 75 | Seed water (630.0500) | MGAL | 203 | $1.00 | $0.01 | $0.01 | $0.01 |
| 76 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 6 | $74.00 | $110.00 | $110.00 | $110.00 |
| 77 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 21 | $76.00 | $113.00 | $113.00 | $113.00 |
| 78 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 50 | $80.00 | $118.00 | $118.00 | $118.00 |
| 79 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 3 | $88.00 | $118.00 | $118.00 | $118.00 |
| 80 | Signs type II reflective H (637.2210) | SF | 252.72 | $22.15 | $19.00 | $19.00 | $19.00 |
| 81 | Signs type II reflective F (637.2230) | SF | 475.33 | $22.80 | $19.00 | $19.00 | $19.00 |
| 82 | Moving signs type II (638.2102) | EACH | 13 | $65.00 | $35.00 | $35.00 | $35.00 |
| 83 | Removing signs type II (638.2602) | EACH | 21 | $30.00 | $10.00 | $10.00 | $10.00 |
| 84 | Removing small sign supports (638.3000) | EACH | 15 | $30.00 | $10.00 | $10.00 | $10.00 |
| 85 | Field office type B (642.5001) | EACH | 1 | $14,500 | $10,000 | $9,500.00 | $18,000 |
| 86 | Traffic control drums (643.0300) | DAY | 2,950 | $0.30 | $0.15 | $0.15 | $0.15 |
| 87 | Traffic control barricades type III (643.0420) | DAY | 2,589 | $0.45 | $0.45 | $0.45 | $0.45 |
| 88 | Traffic control warning lights type A (643.0705) | DAY | 5,178 | $0.10 | $0.10 | $0.10 | $0.10 |
| 89 | Traffic control warning lights type C (643.0715) | DAY | 110 | $0.60 | $0.60 | $0.60 | $0.60 |
| 90 | Traffic control connected arrow boards (643.0810) | DAY | 5 | $9.00 | $9.00 | $9.00 | $9.00 |
| 91 | Traffic control signs (643.0900) | DAY | 4,073 | $0.20 | $0.20 | $0.20 | $0.20 |
| 92 | Traffic control signs fixed message (643.1000) | SF | 25 | $14.00 | $14.00 | $14.00 | $14.00 |
| 93 | Traffic control signs PCMS (643.1050) | DAY | 28 | $11.00 | $11.00 | $11.00 | $11.00 |
| 94 | Temporary marking crosswalk removable tape 6-inch (643.3350) | LF | 52 | $2.20 | $2.20 | $2.20 | $2.20 |
| 95 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 13 | $7.00 | $7.00 | $7.00 | $7.00 |
| 96 | Traffic control (643.5000) | EACH | 1 | $11,750 | $11,750 | $11,750 | $16,360 |
| 97 | Temporary pedestrian surface plate (644.1430) | SF | 48 | $10.00 | $10.00 | $10.00 | $10.00 |
| 98 | Temporary pedestrian surface matting (644.1440) | SF | 400 | $2.50 | $2.50 | $2.50 | $2.50 |
| 99 | Temporary pedestrian detectable warning field (644.1605) | SF | 16 | $3.50 | $3.50 | $3.50 | $3.50 |
| 100 | Temporary pedestrian barricade (644.1810) | LF | 301 | $6.75 | $6.75 | $6.75 | $6.75 |
| 101 | Marking line epoxy 6-inch (646.2020) | LF | 20,799 | $0.49 | $0.49 | $0.65 | $0.49 |
| 102 | Marking line epoxy 10-inch (646.4020) | LF | 287 | $1.07 | $1.07 | $0.80 | $1.07 |
| 103 | Marking arrow epoxy (646.5020) | EACH | 51 | $193.48 | $193.48 | $175.00 | $193.48 |
| 104 | Marking word epoxy (646.5120) | EACH | 3 | $378.89 | $378.89 | $225.00 | $378.89 |
| 105 | Marking symbol epoxy (646.5220) | EACH | 49 | $182.05 | $182.05 | $255.00 | $182.05 |
| 106 | Marking stop line epoxy 18-inch (646.6120) | LF | 155 | $15.72 | $15.72 | $15.25 | $15.72 |
| 107 | Marking diagonal epoxy 12-inch (646.7120) | LF | 9 | $15.30 | $15.30 | $10.20 | $15.30 |
| 108 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 1,838 | $14.88 | $14.88 | $8.50 | $14.88 |
| 109 | Marking crosswalk epoxy block style 24-inch (646.7520) | LF | 70 | $25.77 | $25.77 | $18.75 | $25.77 |
| 110 | Marking removal line water blasting 6-inch (646.9012) | LF | 172 | $2.20 | $2.20 | $2.20 | $2.20 |
| 111 | Marking removal line water blasting wide (646.9210) | LF | 50 | $9.85 | $9.85 | $9.85 | $9.85 |
| 112 | Marking removal special marking water blasting (646.9310) | EACH | 2 | $475.00 | $475.00 | $475.00 | $475.00 |
| 113 | Construction staking storm sewer (650.4000) | EACH | 19 | $250.00 | $250.00 | $250.00 | $250.00 |
| 114 | Construction staking subgrade (650.4500) | LF | 3,967 | $0.01 | $0.01 | $0.01 | $0.01 |
| 115 | Construction staking base (650.5000) | LF | 6,545 | $0.30 | $0.30 | $0.30 | $0.30 |
| 116 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 7,959 | $0.45 | $0.45 | $0.45 | $0.45 |
| 117 | Construction staking curb ramps (650.9000) | EACH | 46 | $75.00 | $75.00 | $75.00 | $75.00 |
| 118 | Construction staking sidewalk (project) 01. 4516-11-73 (650.9500) | EACH | 1 | $100.00 | $100.00 | $100.00 | $100.00 |
| 119 | Construction staking sidewalk (project) 02. 4516-12-75 (650.9500) | EACH | 1 | $100.00 | $100.00 | $100.00 | $100.00 |
| 120 | Construction staking supplemental control (project) 01. 4516-11-73 (650.9911) | EACH | 1 | $10.00 | $10.00 | $10.00 | $10.00 |
| 121 | Construction staking supplemental control (project) 02. 4516-12-75 (650.9911) | EACH | 1 | $10.00 | $10.00 | $10.00 | $10.00 |
| 122 | Construction staking slope stakes (650.9920) | LF | 6,545 | $1.35 | $1.35 | $1.35 | $1.35 |
| 123 | Sawing asphalt (690.0150) | LF | 1,041 | $1.75 | $3.00 | $1.75 | $1.48 |
| 124 | Sawing concrete (690.0250) | LF | 781 | $2.35 | $3.00 | $2.35 | $3.03 |
| 125 | Incentive iri ride (740.0440) | DOL | 10,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 126 | Installing and maintaining climbing turtle exclusion fence (999.2100.S) | LF | 640 | $6.50 | $4.00 | $4.00 | $4.00 |
| 127 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,000 | $5.00 | $5.00 | $5.00 | $5.00 |
| 128 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,320 | $5.00 | $5.00 | $5.00 | $5.00 |
| 129 | Special 01. adjust water valves (SPV.0060) | EACH | 20 | $350.00 | $329.13 | $225.00 | $350.00 |
| 130 | Special 02. adjust water service valves (SPV.0060) | EACH | 22 | $350.00 | $125.48 | $225.00 | $275.00 |
| 131 | Special 03. manhole covers type 1 (SPV.0060) | EACH | 4 | $645.00 | $593.74 | $775.00 | $650.00 |
| 132 | Special 04. inlet covers type E (SPV.0060) | EACH | 1 | $1,149.00 | $1,041.06 | $1,500.00 | $1,250.00 |
| 133 | Special 05. internal/external frame and chimeny seal (SPV.0060) | EACH | 2 | $720.00 | $575.00 | $575.00 | $800.00 |
| 134 | Special 05. internal/external frame and chimney seal (SPV.0060) | EACH | 5 | $720.00 | $575.00 | $575.00 | $800.00 |
| 135 | Special 06. storm sewer pipe PVC 12-inch connection (SPV.0060) | EACH | 1 | $800.00 | $1,860.56 | $2,400.00 | $1,500.00 |
| 136 | Special 07. temporary mailbox accommodations project 4516-11- 73 (SPV.0060) | EACH | 1 | $1,200.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 137 | Special 08. temporary mailbox accommodations project 4516-12- 75 (SPV.0060) | EACH | 1 | $1,500.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 138 | Special 01. concrete curb and gutter 24-inch type A (SPV.0090) | LF | 106 | $48.55 | $48.55 | $48.55 | $48.55 |
| 139 | Special 02. concrete curb and gutter 24-inch type D (SPV.0090) | LF | 7,480 | $22.95 | $22.95 | $22.95 | $22.95 |
| 140 | Special 03. concrete valley gutter 36-inch type D (SPV.0090) | LF | 116 | $54.00 | $54.00 | $54.00 | $54.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of March 10, 2026. Compiled by Mirage Metrics.