WisDOT contract 20260310037 bid tabulation

T Pelican, Haymeadow Road; Haymeadow Creek Bridge B-43-0070 (LOC STR, Oneida County T Pelican, Haymeadow Road). Let by Wisconsin DOT on March 10, 2026, Oneida. 3 bids received.

Owner
Wisconsin DOT
Letting
10 MAR 2026
Pay items
60
Data through
10 NOV 2026

2 of the 3 bids matched their published totals to within a dollar and are shown; the others are left out.

Bidders

RankBidderTotal bidAgainst the low bid
2Lunda Construction Company$736,171+23%
3Sheet Piling Services LLC$1,056,642+77%
WisDOT contract 20260310037: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Lunda Construction Company2. Sheet Piling Services LLC
1Clearing (201.0105)STA3$500.00$500.00
2Grubbing (201.0205)STA3$500.00$500.00
3Removing structure over waterway remove debris (structure) 01. P-43- 58 (203.0250)EACH1$247,000$200,000
4Excavation common (205.0100)CY132$23.50$23.50
5Excavation for structures bridges (structure) 01. B-43-70 (206.1001)EACH1$25,000$100,000
6Cofferdams (structure) 01. B-43-70 (206.5001)EACH1$65,000$250,000
7Borrow (208.0100)CY4$100.00$100.00
8Backfill structure type A (210.1500)TON314$38.91$38.91
9Finishing roadway (project) 01. 9877-03-71 (213.0100)EACH1$1,000.00$1,000.00
10Base aggregate dense 3/4-inch (305.0110)TON30$42.50$42.50
11Base aggregate dense 1 1/4-inch (305.0120)TON395$27.43$27.43
12Asphaltic surface (465.0105)TON113$141.66$141.66
13Concrete masonry bridges (502.0100)CY171$750.00$1,000.00
14Protective surface treatment (502.3200)SY167$3.00$10.00
15Pigmented surface sealer (502.3210)SY50$6.00$10.00
16Bar steel reinforcement HS structures (505.0400)LB4,100$1.13$2.50
17Bar steel reinforcement HS coated structures (505.0600)LB29,220$1.23$2.45
18Rubberized membrane waterproofing (516.0500)SY12$25.00$22.00
19Pre-boring rock or consolidated materials (550.0020)LF105$366.00$400.00
20Piling steel HP 10-inch X 42 LB (550.1100)LF245$52.00$97.00
21Riprap heavy (606.0300)CY80$150.49$150.49
22Pipe underdrain wrapped 6-inch (612.0406)LF140$7.15$7.15
23Anchor assemblies for steel plate beam guard (614.0150)EACH4$175.00$1,000.00
24Maintenance and repair of haul roads (project) 01. 9877-03-71 (618.0100)EACH1$1,500.00$0.01
25Mobilization (619.1000)EACH1$72,000$78,727
26Water (624.0100)MGAL6$25.00$25.00
27Salvaged topsoil (625.0500)SY758$3.98$3.98
28Silt fence (628.1504)LF686$3.85$3.85
29Silt fence maintenance (628.1520)LF686$0.10$0.10
30Mobilizations erosion control (628.1905)EACH3$200.00$200.00
31Mobilizations emergency erosion control (628.1910)EACH2$300.00$300.00
32Erosion mat class II type C (628.2027)SY616$5.10$5.10
33Turbidity barriers (628.6005)SY158$48.90$48.90
34Seeding mixture no. 20 (630.0120)LB27$7.15$7.15
35Seeding temporary (630.0200)LB16$5.10$5.10
36Seed water (630.0500)MGAL3$100.00$100.00
37Posts wood 4X6-inch X 12-FT (634.0612)EACH4$140.00$140.00
38Signs type II reflective F (637.2230)SF12$30.00$30.00
39Moving signs type II (638.2102)EACH1$40.00$40.00
40Removing signs type II (638.2602)EACH4$20.00$20.00
41Removing small sign supports (638.3000)EACH4$20.00$20.00
42Moving small sign supports (638.4000)EACH1$125.00$125.00
43Field office type B (642.5001)EACH1$2,000.00$1,000.00
44Traffic control drums (643.0300)DAY660$0.50$0.50
45Traffic control barricades type III (643.0420)DAY1,188$0.35$0.35
46Traffic control warning lights type A (643.0705)DAY1,584$0.10$0.10
47Traffic control signs (643.0900)DAY924$0.40$0.40
48Traffic control signs PCMS (643.1050)DAY14$50.00$50.00
49Traffic control (643.5000)EACH1$2,800.00$2,800.00
50Geotextile type DF schedule A (645.0111)SY86$9.50$9.50
51Geotextile type HR (645.0120)SY132$8.25$8.25
52Construction staking subgrade (650.4500)LF300$0.01$0.01
53Construction staking base (650.5000)LF300$5.00$5.00
54Construction staking structure layout (structure) 01. B-43-70 (650.6501)EACH1$5,000.00$5,000.00
55Construction staking supplemental control (project) 01. 9877-03-71 (650.9911)EACH1$500.00$500.00
56Construction staking slope stakes (650.9920)LF300$5.00$5.00
57Sawing asphalt (690.0150)LF40$5.00$5.00
58Incentive strength concrete structures (715.0502)DOL1,026$1.00$1.00
59Installing and maintaining climbing turtle exclusion fence (999.2100.S)LF686$5.50$5.50
60Special 01. infill riprap - station 10+00 (SPV.0195)TON18$58.50$58.50
WisDOT contract 20260310037: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of March 10, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy