| 1 | Removing small pipe culverts (203.0100) | EACH | 1 | $750.00 |
| 2 | Removing asphaltic surface (204.0110) | SY | 425 | $3.50 |
| 3 | Removing asphaltic surface butt joints (204.0115) | SY | 3,042 | $10.46 |
| 4 | Removing asphaltic surface milling (204.0120) | SY | 197,768 | $3.25 |
| 5 | Removing curb (204.0130) | LF | 288 | $8.00 |
| 6 | Removing curb & gutter (204.0150) | LF | 1,709 | $8.00 |
| 7 | Removing concrete sidewalk (204.0155) | SY | 746 | $3.50 |
| 8 | Removing guardrail (204.0165) | LF | 788 | $3.00 |
| 9 | Removing surface drains (204.0190) | EACH | 6 | $500.00 |
| 10 | Removing inlets (204.0220) | EACH | 1 | $500.00 |
| 11 | Removing storm sewer (size) 01. 24-inch (204.0245) | LF | 12 | $15.00 |
| 12 | Removing (item description) 01. inlet covers (204.9060.S) | EACH | 4 | $450.00 |
| 13 | Removing (item description) 02. removing endwall (204.9060.S) | EACH | 1 | $750.00 |
| 14 | Removing (item description) 01. beamguard curb (204.9090.S) | LF | 288 | $6.00 |
| 15 | Excavation common (205.0100) | CY | 252 | $20.00 |
| 16 | Borrow (208.0100) | CY | 103 | $25.00 |
| 17 | Prepare foundation for asphaltic paving (project) 01. 7160-04-76 (211.0101) | EACH | 1 | $11,439 |
| 18 | Prepare foundation for asphaltic paving (project) 02. 7550-00-76 (211.0101) | EACH | 1 | $2,859.69 |
| 19 | Finishing roadway (project) 01. 7160-04-76 (213.0100) | EACH | 1 | $11,939 |
| 20 | Finishing roadway (project) 02. 7550-00-76 (213.0100) | EACH | 1 | $3,359.69 |
| 21 | Base aggregate dense 3/4-inch (305.0110) | TON | 2,555 | $29.97 |
| 22 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 380 | $35.00 |
| 23 | Drilled tie bars (416.0610) | EACH | 148 | $16.03 |
| 24 | Tack coat (455.0605) | GAL | 23,346 | $2.23 |
| 25 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $10,000 |
| 26 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 1 | $10,000 |
| 27 | Incentive density PWL HMA pavement (460.2005) | DOL | 21,510 | $1.00 |
| 28 | Incentive density PWL HMA pavement (460.2005) | DOL | 1,650 | $1.00 |
| 29 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 19,030 | $1.00 |
| 30 | Incentive air voids HMA pavement (460.2010) | DOL | 2,130 | $1.00 |
| 31 | Incentive air voids HMA pavement (460.2010) | DOL | 33,850 | $1.00 |
| 32 | HMA pavement 5 MT 58-34 S (460.6245) | TON | 35,981 | $94.32 |
| 33 | Material transfer vehicle (460.9000.S) | EACH | 0.80 | $29,646 |
| 34 | Material transfer vehicle (460.9000.S) | EACH | 0.20 | $29,646 |
| 35 | Asphaltic surface (465.0105) | TON | 1,118 | $135.07 |
| 36 | Asphaltic surface patching (465.0110) | TON | 500 | $117.41 |
| 37 | Asphaltic surface driveways and field entrances (465.0120) | TON | 145 | $208.78 |
| 38 | Asphaltic curb (465.0310) | LF | 288 | $20.56 |
| 39 | Asphaltic flumes (465.0315) | SY | 26 | $221.82 |
| 40 | Asphaltic rumble strips, shoulder (465.0520) | LF | 56,108 | $0.17 |
| 41 | Asphaltic rumble strips, centerline (465.0560) | LF | 32,085 | $0.17 |
| 42 | Apron endwalls for culvert pipe 24- inch (520.1024) | EACH | 1 | $400.00 |
| 43 | Concrete collars for pipe (520.8000) | EACH | 10 | $500.00 |
| 44 | Cleaning culvert pipes (520.8700) | EACH | 6 | $1,050.00 |
| 45 | Apron endwalls for culvert pipe steel 30-inch (521.1030) | EACH | 1 | $750.00 |
| 46 | Culvert pipe corrugated steel 30- inch (521.3130) | LF | 98 | $70.00 |
| 47 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 3 | $1,400.00 |
| 48 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 1 | $1,750.00 |
| 49 | Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036) | EACH | 1 | $2,500.00 |
| 50 | Culvert pipe salvaged 24-inch (524.0124) | LF | 36 | $25.00 |
| 51 | Culvert pipe salvaged 60-inch (524.0160) | LF | 20 | $50.00 |
| 52 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 1,098 | $59.88 |
| 53 | Concrete curb & gutter 6-inch sloped 30-inch type J (601.0415) | LF | 31 | $59.88 |
| 54 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 140 | $61.47 |
| 55 | Concrete curb pedestrian (601.0600) | LF | 186 | $56.78 |
| 56 | Concrete sidewalk 5-inch (602.0410) | SF | 6,420 | $12.02 |
| 57 | Curb ramp detectable warning field yellow (602.0505) | SF | 270 | $60.32 |
| 58 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 56 | $67.28 |
| 59 | Concrete steps (602.1500) | SF | 34 | $82.71 |
| 60 | Riprap medium (606.0200) | CY | 28 | $110.00 |
| 61 | Riprap heavy (606.0300) | CY | 317 | $75.00 |
| 62 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 12 | $125.00 |
| 63 | Manhole covers type J (611.0530) | EACH | 1 | $650.00 |
| 64 | Inlet covers type A (611.0600) | EACH | 1 | $1,000.00 |
| 65 | Inlet covers type H (611.0624) | EACH | 1 | $1,000.00 |
| 66 | Inlet covers type H-S (611.0639) | EACH | 1 | $1,000.00 |
| 67 | Inlet covers type V (611.0654) | EACH | 1 | $975.00 |
| 68 | Manholes 4-FT diameter (611.2004) | EACH | 1 | $3,200.00 |
| 69 | Inlets 4-FT diameter (611.3004) | EACH | 1 | $3,200.00 |
| 70 | Adjusting manhole covers (611.8110) | EACH | 14 | $300.00 |
| 71 | Adjusting inlet covers (611.8115) | EACH | 7 | $450.00 |
| 72 | Cover plates temporary (611.8120.S) | EACH | 6 | $260.00 |
| 73 | Steel plate beam guard class A (614.0305) | LF | 688 | $29.00 |
| 74 | Steel plate beam guard energy absorbing terminal (614.0370) | EACH | 2 | $3,433.00 |
| 75 | Adjusting steel plate beam guard (614.0400) | LF | 3,900 | $5.13 |
| 76 | Replacing guardrail posts and blocks (614.0950) | EACH | 319 | $78.00 |
| 77 | Replacing guardrail rail and hardware (614.0951) | LF | 1,270 | $12.00 |
| 78 | Replacing eat reflective panel (614.0953) | EACH | 4 | $100.00 |
| 79 | MGS guardrail 3 (614.2300) | LF | 100 | $32.00 |
| 80 | Maintenance and repair of haul roads (project) 01. 7160-04-76 (618.0100) | EACH | 1 | $8,000.00 |
| 81 | Maintenance and repair of haul roads (project) 02. 7550-00-76 (618.0100) | EACH | 1 | $2,000.00 |
| 82 | Mobilization (619.1000) | EACH | 1 | $557,438 |
| 83 | Water (624.0100) | MGAL | 45 | $52.37 |
| 84 | Topsoil (625.0100) | SY | 3,169 | $3.25 |
| 85 | Silt fence (628.1504) | LF | 2,000 | $2.05 |
| 86 | Silt fence maintenance (628.1520) | LF | 2,000 | $0.03 |
| 87 | Mobilizations erosion control (628.1905) | EACH | 6 | $193.00 |
| 88 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $303.00 |
| 89 | Erosion mat urban class I type B (628.2008) | SY | 3,169 | $2.15 |
| 90 | Inlet protection type A (628.7005) | EACH | 2 | $100.00 |
| 91 | Inlet protection type C (628.7015) | EACH | 45 | $60.00 |
| 92 | Temporary ditch checks (628.7504) | LF | 144 | $10.00 |
| 93 | Culvert pipe checks (628.7555) | EACH | 29 | $25.00 |
| 94 | Rock bags (628.7570) | EACH | 82 | $6.00 |
| 95 | Fertilizer type B (629.0210) | CWT | 3.80 | $100.00 |
| 96 | Seeding mixture no. 20 (630.0120) | LB | 130.30 | $11.00 |
| 97 | Seeding mixture no. 40 (630.0140) | LB | 13.40 | $25.00 |
| 98 | Seeding temporary (630.0200) | LB | 50 | $10.00 |
| 99 | Seed water (630.0500) | MGAL | 88 | $5.00 |
| 100 | Delineators flexible (633.0200) | EACH | 44 | $75.00 |
| 101 | Markers culvert end (633.5200) | EACH | 32 | $75.00 |
| 102 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 3 | $100.00 |
| 103 | Signs type II reflective H (637.2210) | SF | 9 | $50.00 |
| 104 | Field office type C (642.5201) | EACH | 1 | $6,925.00 |
| 105 | Traffic control drums (643.0300) | DAY | 7,300 | $0.62 |
| 106 | Traffic control barricades type III (643.0420) | DAY | 20 | $4.71 |
| 107 | Traffic control warning lights type C (643.0715) | DAY | 500 | $0.20 |
| 108 | Traffic control signs (643.0900) | DAY | 6,450 | $0.74 |
| 109 | Traffic control signs fixed message (643.1000) | SF | 90 | $24.37 |
| 110 | Traffic control signs PCMS (643.1050) | DAY | 40 | $62.08 |
| 111 | Temporary marking line epoxy 6- inch (643.3170) | LF | 155,030 | $0.72 |
| 112 | Temporary marking line removable tape 8-inch (643.3250) | LF | 1,320 | $9.46 |
| 113 | Temporary marking crosswalk removable tape 6-inch (643.3350) | LF | 1,120 | $2.73 |
| 114 | Traffic control (643.5000) | EACH | 1 | $16,271 |
| 115 | Temporary pedestrian curb ramp (644.1601) | DAY | 440 | $11.18 |
| 116 | Temporary pedestrian barricade (644.1810) | LF | 1,400 | $6.36 |
| 117 | Geotextile type HR (645.0120) | SY | 649 | $4.25 |
| 118 | Marking line epoxy 6-inch (646.2020) | LF | 1,080 | $0.65 |
| 119 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 139,860 | $1.19 |
| 120 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 532 | $2.20 |
| 121 | Marking stop line epoxy 18-inch (646.6120) | LF | 22 | $45.00 |
| 122 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 300 | $16.00 |
| 123 | Marking crosswalk epoxy block style 24-inch (646.7520) | LF | 385 | $35.00 |
| 124 | Marking curb epoxy (646.8120) | LF | 690 | $6.00 |
| 125 | Marking parking stall epoxy (646.8320) | LF | 321 | $26.00 |
| 126 | Locating no-passing zones (648.0100) | MI | 9.22 | $400.00 |
| 127 | Construction staking storm sewer (650.4000) | EACH | 2 | $150.20 |
| 128 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 1,717 | $2.00 |
| 129 | Construction staking pipe culverts (650.6000) | EACH | 1 | $243.00 |
| 130 | Construction staking resurfacing reference (650.8000) | LF | 48,695 | $0.08 |
| 131 | Construction staking curb ramps (650.9000) | EACH | 26 | $190.00 |
| 132 | Construction staking sidewalk (project) 01. 7160-04-76 (650.9500) | EACH | 1 | $500.00 |
| 133 | Construction staking supplemental control (project) 01. 7160-04-76 (650.9911) | EACH | 1 | $1,500.00 |
| 134 | Construction staking supplemental control (project) 02. 7550-00-76 (650.9911) | EACH | 1 | $450.00 |
| 135 | Construction staking slope stakes (650.9920) | LF | 917 | $1.00 |
| 136 | Sawing asphalt (690.0150) | LF | 1,959 | $1.65 |
| 137 | Sawing concrete (690.0250) | LF | 911 | $2.85 |
| 138 | Incentive iri ride (740.0440) | DOL | 2,454 | $1.00 |
| 139 | Incentive iri ride (740.0440) | DOL | 33,573 | $1.00 |
| 140 | Special 01. adjusting sanitary manholes (SPV.0060) | EACH | 24 | $500.00 |
| 141 | Special 02. adjusting water valves (SPV.0060) | EACH | 17 | $250.00 |
| 142 | Special 03. adjusting water service curb stops (SPV.0060) | EACH | 4 | $200.00 |
| 143 | Special 04. steel plate 1/2-inch (SPV.0060) | EACH | 2 | $750.00 |
| 144 | Special 05. sawing hole in existing structure (SPV.0060) | EACH | 2 | $750.00 |
| 145 | Special 06. traffic control signs fixed message mndot (SPV.0060) | EACH | 1 | $659.63 |
| 146 | Special 07. cleaning inlets (SPV.0060) | EACH | 4 | $800.00 |
| 147 | Special 08. connect to existing structure (SPV.0060) | EACH | 1 | $1,000.00 |
| 148 | Special 09. inlet covers type H-D (SPV.0060) | EACH | 2 | $1,050.00 |
| 149 | Special 10. site mowing project 7160-04-76 (SPV.0060) | EACH | 1 | $10,000 |
| 150 | Special 11. site mowing project 7550-00-76 (SPV.0060) | EACH | 1 | $10,000 |
| 151 | Special 01. shoulder existing beamguard (SPV.0090) | LF | 5,500 | $4.88 |
| 152 | Special 02. modified pedestrian curb (SPV.0090) | LF | 448 | $84.42 |
| 153 | Special 03. fence chain link small animal barrier (SPV.0090) | LF | 2,500 | $25.73 |
| 154 | Special 04. cleaning ditch (SPV.0090) | LF | 500 | $10.00 |
| 155 | Special 05. UV GRP cipp 60-inch (SPV.0090) | LF | 180 | $825.00 |