WisDOT contract 20260414002 bid tabulation

Oconomowoc - Mayville; Waukesha Co Line to CTH Mm (STH 067, Dodge County Oconomowoc - Mayville). Let by Wisconsin DOT on April 14, 2026, Dodge. 3 bids received; low bid $2,548,394 by Payne and Dolan, Inc.

Owner
Wisconsin DOT
Letting
14 APR 2026
Pay items
96
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Payne and Dolan, Inc$2,548,394Low
2Rock Road Companies, Inc.$2,747,787+8.0%
3Stark Pavement Corporation$2,831,882+11%
WisDOT contract 20260414002: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Payne and Dolan, Inc2. Rock Road Companies, Inc.3. Stark Pavement Corporation
1Removing small pipe culverts (203.0100)EACH3$310.00$746.76$750.00
2Removing concrete pavement (204.0100)SY393$10.35$9.39$10.75
3Removing asphaltic surface (204.0110)SY55$12.00$12.00$18.25
4Removing asphaltic surface butt joints (204.0115)SY583$5.45$4.89$8.70
5Removing asphaltic surface milling (204.0120)SY101,300$2.35$1.00$3.00
6Removing curb & gutter (204.0150)LF174$8.00$8.00$9.00
7Removing concrete sidewalk (204.0155)SY142$24.00$24.00$14.00
8Removing guardrail (204.0165)LF320$5.00$5.00$5.00
9Removing delineators and markers (204.0180)EACH6$25.00$25.00$25.00
10Excavation common (205.0100)CY1,116$21.40$16.68$35.00
11Prepare foundation for asphaltic paving (project) 01. 3030-05-74 (211.0101)EACH1$5,165.00$0.01$3,300.00
12Prepare foundation for asphaltic shoulders (211.0400)STA8$155.00$360.58$340.00
13Finishing roadway (project) 01. 3030-05-74 (213.0100)EACH1$2,600.00$4,634.58$1,750.00
14Base aggregate dense 3/4-inch (305.0110)TON2,760$24.00$30.06$27.00
15Base aggregate dense 1 1/4-inch (305.0120)TON550$31.40$22.84$22.00
16Base aggregate dense 3-inch (305.0130)TON680$31.15$27.97$26.00
17Drilled tie bars (416.0610)EACH60$10.00$10.00$10.00
18Tack coat (455.0605)GAL12,970$2.30$3.50$3.00
19HMA percent within limits (PWL) test strip volumetrics (460.0105.S)EACH1$1,300.00$3,500.00$3,500.00
20HMA percent within limits (PWL) test strip density (460.0110.S)EACH2$8,000.00$3,500.00$3,500.00
21Incentive density PWL HMA pavement (460.2005)DOL14,130$1.00$1.00$1.00
22Incentive density HMA pavement longitudinal joints (460.2007)DOL5,410$1.00$1.00$1.00
23Incentive air voids HMA pavement (460.2010)DOL21,220$1.00$1.00$1.00
24HMA pavement 4 MT 58-28 S (460.6224)TON10,670$66.35$83.01$76.00
25HMA pavement 4 MT 58-28 H (460.6424)TON10,540$71.30$87.68$78.30
26Asphaltic surface (465.0105)TON800$111.75$91.00$95.50
27Asphaltic surface driveways and field entrances (465.0120)TON77$77.00$198.20$132.00
28Culvert pipe reinforced concrete class IV 24-inch (522.0424)LF104$127.85$227.59$275.00
29Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024)EACH4$1,300.00$1,430.06$1,850.00
30Culvert pipe reinforced concrete horizontal elliptical class HE-IV 29X45-inch (522.2429)LF86$309.60$306.63$325.00
31Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 29X45-inch (522.2629)EACH2$2,440.00$2,484.00$3,000.00
32Concrete curb & gutter 30-inch type D (601.0411)LF176$51.50$51.50$51.50
33Concrete curb pedestrian (601.0600)LF22$40.00$40.00$40.00
34Concrete sidewalk 5-inch (602.0410)SF1,410$10.50$10.50$10.50
35Curb ramp detectable warning field natural patina (602.0515)SF60$40.00$40.00$40.00
36Adjusting inlet covers (611.8115)EACH2$600.00$640.34$1,350.00
37Barrier system grading shaping finishing (614.0010)EACH2$4,180.00$3,292.92$14,200
38Steel plate beam guard class A (614.0305)LF350$31.00$31.00$31.00
39Steel plate beam guard energy absorbing terminal (614.0370)EACH4$4,000.00$4,000.00$4,000.00
40Maintenance and repair of haul roads (project) 01. 3030-05-74 (618.0100)EACH1$350.00$0.01$960.00
41Mobilization (619.1000)EACH1$85,664$92,939$86,000
42Water (624.0100)MGAL56$45.00$0.01$50.00
43Salvaged topsoil (625.0500)SY690$1.60$0.01$9.00
44Silt fence (628.1504)LF1,130$2.50$2.50$2.50
45Silt fence maintenance (628.1520)LF1,130$0.01$0.01$0.01
46Mobilizations erosion control (628.1905)EACH3$100.00$100.00$100.00
47Mobilizations emergency erosion control (628.1910)EACH2$100.00$100.00$100.00
48Erosion mat urban class I type B (628.2008)SY690$2.25$2.25$2.25
49Inlet protection type C (628.7015)EACH33$65.00$65.00$65.00
50Temporary ditch checks (628.7504)LF45$12.00$12.00$12.00
51Culvert pipe checks (628.7555)EACH16$20.00$20.00$20.00
52Rock bags (628.7570)EACH150$20.00$20.00$20.00
53Fertilizer type B (629.0210)CWT0.30$150.00$150.00$150.00
54Seeding mixture no. 30 (630.0130)LB31$15.00$15.00$15.00
55Seed water (630.0500)MGAL15$20.00$20.00$20.00
56Markers culvert end (633.5200)EACH6$75.00$75.00$75.00
57Posts wood 4X6-inch X 14-FT (634.0614)EACH4$90.00$90.00$90.00
58Posts wood 4X6-inch X 16-FT (634.0616)EACH1$98.00$98.00$98.00
59Moving signs type II (638.2102)EACH6$150.00$150.00$150.00
60Removing small sign supports (638.3000)EACH5$40.00$40.00$40.00
61Moving small sign supports (638.4000)EACH1$150.00$150.00$150.00
62Field office type B (642.5001)EACH1$8,275.00$5,400.00$7,500.00
63Traffic control drums (643.0300)DAY2,208$0.25$0.25$0.20
64Traffic control barricades type III (643.0420)DAY2,934$1.00$1.00$0.60
65Traffic control warning lights type A (643.0705)DAY5,844$0.11$0.11$0.10
66Traffic control signs (643.0900)DAY20,258$0.50$0.50$0.40
67Traffic control covering signs type I (643.0910)EACH4$200.00$200.00$200.00
68Traffic control covering signs type II (643.0920)EACH9$40.00$40.00$40.00
69Traffic control signs PCMS (643.1050)DAY14$60.00$60.00$75.00
70Temporary marking line paint 6- inch (643.3165)LF78,900$0.49$0.45$0.50
71Temporary marking crosswalk paint 6-inch (643.3305)LF200$10.00$8.00$10.00
72Traffic control (643.5000)EACH1$29,000$29,000$27,250
73Temporary pedestrian curb ramp (644.1601)DAY38$15.00$15.00$20.00
74Temporary pedestrian detectable warning field (644.1605)SF40$18.00$18.00$20.00
75Temporary pedestrian barricade (644.1810)LF246$6.00$6.00$5.00
76Geogrid type SR (645.0220)SY786$12.00$1.75$1.80
77Marking line epoxy 4-inch (646.1020)LF337$0.50$0.50$0.50
78Marking line grooved wet ref epoxy 6-inch (646.2040)LF74,290$1.05$1.05$1.05
79Marking line grooved wet ref epoxy 10-inch (646.4040)LF1,410$2.00$2.00$2.00
80Marking railroad crossing epoxy (646.5320)EACH2$1,600.00$1,600.00$1,600.00
81Marking stop line epoxy 18-inch (646.6120)LF37$27.00$27.00$27.00
82Marking crosswalk epoxy transverse line 6-inch (646.7420)LF344$11.00$11.00$11.00
83Construction staking curb gutter and curb & gutter (650.5500)LF176$2.50$0.01$2.50
84Construction staking pipe culverts (650.6000)EACH3$300.00$15.00$300.00
85Construction staking resurfacing reference (650.8000)LF27,033$0.19$0.05$0.20
86Construction staking curb ramps (650.9000)EACH6$300.00$100.00$300.00
87Construction staking sidewalk (project) 01. 3030-05-74 (650.9500)EACH1$400.00$4,000.00$400.00
88Construction staking supplemental control (project) 01. 3030-05-74 (650.9911)EACH1$600.00$4,000.00$600.00
89Sawing asphalt (690.0150)LF434$1.20$1.69$1.20
90Sawing concrete (690.0250)LF240$2.20$2.25$2.20
91Incentive iri ride (740.0440)DOL20,480$1.00$1.00$1.00
92Special 01. foundation backfill (SPV.0035)CY538$54.26$26.52$28.00
93Special 01. grading shaping and finishing curb ramps (SPV.0060)EACH4$1,150.00$1,225.00$1,850.00
94Special 02. verify landmark reference monuments (SPV.0060)EACH5$900.00$500.00$900.00
95Special 03. adjusting sanitary manhole covers (SPV.0060)EACH3$1,830.00$733.60$1,500.00
96Special 01. removing distressed pavement milling (SPV.0180)SY4,710$5.75$6.10$7.55
WisDOT contract 20260414002: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of April 14, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way