WisDOT contract 20260414013 bid tabulation

Saukville - Waldo; .02 M S of Sheboygan/Ozaukee Co Ln (STH 057, Ozaukee County Saukville - Waldo). Let by Wisconsin DOT on April 14, 2026, Ozaukee. 6 bids received; low bid $1,178,596 by Vinton Construction Company.

Owner
Wisconsin DOT
Letting
14 APR 2026
Pay items
68
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Vinton Construction Company$1,178,596Low
2Lunda Construction Company$1,360,059+15%
3Highway Landscapers, Inc.$1,426,133+21%
4Zenith Tech., Inc. - Waukesha$1,477,390+25%
5Zignego Company, Inc.$1,586,533+35%
6Lalonde Contractors Incorporated$1,668,035+42%
WisDOT contract 20260414013: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Vinton Construction Company2. Lunda Construction Company3. Highway Landscapers, Inc.4. Zenith Tech., Inc. - Waukesha5. Zignego Company, Inc.6. Lalonde Contractors Incorporated
1Grubbing (201.0205)STA3$600.00$1,050.00$750.00$1,050.00$1,050.00$1,050.00
2Removing asphaltic surface milling (204.0120)SY537$13.42$13.42$8.50$13.42$13.42$13.42
3Removing guardrail (204.0165)LF1,200$1.00$1.00$4.00$1.00$1.00$3.00
4Removing manholes (204.0210)EACH1$1,020.00$1,020.00$1,000.00$400.00$750.00$900.00
5Removing storm sewer (size) 01. 18 inch (204.0245)LF86$9.25$9.23$75.00$10.00$35.00$50.00
6Excavation common (205.0100)CY455$85.00$85.00$25.00$31.43$0.01$59.19
7Finishing roadway (project) 01. 1040-05-71 (213.0100)EACH1$2,000.00$500.00$500.00$3,500.00$1,000.00$2,910.00
8Base aggregate dense 3/4-inch (305.0110)TON115$70.00$70.00$75.00$35.80$100.00$29.37
9Base aggregate dense 1 1/4-inch (305.0120)TON3,154$0.01$0.01$21.00$0.01$0.01$23.26
10Drilled tie bars (416.0610)EACH164$7.79$10.50$15.00$7.79$30.00$26.21
11Drilled dowel bars (416.0620)EACH226$16.20$18.50$35.00$16.20$30.00$31.60
12Concrete pavement replacement (416.1720)SY645$92.44$112.97$150.00$92.44$148.00$115.95
13Concrete pavement replacement shes (416.1725)SY208$119.84$140.60$175.00$119.84$213.00$181.26
14Tack coat (455.0605)GAL25$4.90$4.90$2.00$4.90$4.90$4.90
15Incentive density HMA pavement (460.2000)DOL500$1.00$1.00$1.00$1.00$1.00$1.00
16HMA pavement 4 LT 58-28 S (460.5224)TON356$108.20$108.20$150.00$108.20$108.20$108.20
17Asphaltic rumble strips, shoulder (465.0520)LF1,850$1.25$1.25$1.25$2.59$1.25$1.25
18Apron endwalls for culvert pipe salvaged 18-inch (524.0618)EACH1$1,726.00$1,726.00$1,250.00$1,000.00$1,200.00$1,977.00
19Concrete barrier temporary precast delivered (603.8000)LF1,257$19.00$18.00$12.00$27.00$11.55$27.00
20Concrete barrier temporary precast installed (603.8125)LF1,257$5.00$4.00$12.00$7.00$12.00$7.00
21Storm sewer pipe reinforced concrete class IV 18-inch (608.0418)LF86$163.95$163.95$155.00$162.85$165.00$120.00
22Inlet covers type MS (611.0642)EACH1$551.00$550.49$800.00$900.00$1,250.00$1,193.00
23Inlets median 1 grate (611.3901)EACH1$5,670.00$5,670.45$4,500.00$4,995.00$4,500.00$4,117.00
24Pipe underdrain wrapped 4-inch (612.0404)LF1,000$20.95$20.98$5.00$21.10$35.00$47.00
25Crash cushions temporary (614.0905)EACH1$4,300.00$4,300.00$4,300.00$7,500.00$5,500.00$4,300.00
26MGS guardrail 3 (614.2300)LF1,200$27.70$27.70$30.00$27.70$27.70$31.00
27MGS guardrail terminal eat (614.2610)EACH2$3,725.00$3,725.00$5,000.00$3,725.00$3,725.00$2,950.00
28Maintenance and repair of haul roads (project) 01. 1040-05-71 (618.0100)EACH1$0.01$0.01$1,200.00$6,500.00$1.00$0.01
29Mobilization (619.1000)EACH1$109,400$263,943$102,000$185,000$167,000$349,837
30Topsoil (625.0100)SY4,439$4.25$4.75$5.50$6.04$4.00$9.72
31Silt fence (628.1504)LF1,546$1.65$1.65$3.00$1.65$1.65$1.92
32Silt fence maintenance (628.1520)LF1,546$0.01$0.01$0.01$0.01$0.01$0.01
33Mobilizations erosion control (628.1905)EACH2$200.00$200.00$500.00$200.00$200.00$0.01
34Mobilizations emergency erosion control (628.1910)EACH4$35.00$35.00$1.00$35.00$35.00$0.01
35Erosion mat class II type B (628.2023)SY4,439$1.59$1.59$2.50$1.59$1.59$0.75
36Inlet protection type A (628.7005)EACH1$80.00$80.00$150.00$80.00$80.00$100.00
37Inlet protection type B (628.7010)EACH1$50.00$50.00$150.00$50.00$50.00$20.00
38Seeding mixture no. 20 (630.0120)LB159$9.45$9.45$15.00$9.45$9.45$4.00
39Seeding mixture no. 30 (630.0130)LB41$9.55$9.55$15.00$9.55$9.55$4.00
40Seed water (630.0500)MGAL100$10.00$10.00$0.01$10.00$10.00$0.01
41Trees (species, root, size) picea pungens "fat albert", colorado blue spruce, BB 20" (632.0101)EACH30$340.00$340.00$100.00$340.00$340.00$275.00
42Landscape planting surveillance and care cycles (632.9101)EACH24$150.00$150.00$750.00$150.00$150.00$500.00
43Posts wood 4X6-inch X 18-FT (634.0618)EACH15$83.00$83.00$150.00$83.00$83.00$95.00
44Signs type II reflective H (637.2210)SF174.50$21.90$21.90$40.00$21.90$21.90$19.00
45Signs type II reflective F (637.2230)SF20$22.90$22.90$40.00$22.90$22.90$21.00
46Moving signs type II (638.2102)EACH3$105.00$105.00$150.00$105.00$105.00$50.00
47Removing signs type II (638.2602)EACH7$18.00$18.00$50.00$18.00$18.00$10.00
48Removing small sign supports (638.3000)EACH15$18.00$18.00$50.00$18.00$18.00$15.00
49Field office type B (642.5001)EACH1$10,000$6,000.00$12,500$11,000$20,000$12,808
50Traffic control drums (643.0300)DAY1,288$0.20$0.20$0.20$0.33$0.33$0.20
51Traffic control barricades type III (643.0420)DAY104$0.45$0.45$0.45$0.98$0.98$0.45
52Traffic control warning lights type A (643.0705)DAY208$0.25$0.25$0.25$0.19$0.19$0.25
53Traffic control warning lights type C (643.0715)DAY357$0.25$0.25$0.25$0.19$0.19$0.25
54Traffic control connected arrow boards (643.0810)DAY94$26.00$26.00$26.00$25.00$25.00$26.00
55Traffic control signs (643.0900)DAY966$0.20$0.20$0.20$0.66$0.66$0.20
56Traffic control signs PCMS (643.1050)DAY14$45.00$45.00$45.00$60.00$60.00$45.00
57Temporary marking line removable tape 6-inch (643.3180)LF1,073$2.25$2.25$2.25$2.66$2.66$2.25
58Traffic control (643.5000)EACH1$11,000$11,000$11,000$41,000$2,500.00$11,000
59Marking line epoxy 6-inch (646.2020)LF3,264$2.55$3.41$3.41$2.55$2.55$3.41
60Construction staking storm sewer (650.4000)EACH2$200.00$200.00$200.00$200.00$500.00$200.00
61Construction staking base (650.5000)LF1,327$1.32$1.32$1.32$1.32$5.00$1.32
62Construction staking supplemental control (project) 01. 1040-05-71 (650.9911)EACH1$560.39$560.39$560.39$560.39$5,000.00$560.39
63Construction staking slope stakes (650.9920)LF1,327$0.97$0.97$0.97$0.97$5.00$0.97
64Sawing asphalt (690.0150)LF546$3.00$1.95$10.00$10.00$1.95$1.30
65On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS400$5.00$5.00$5.00$5.00$5.00$5.00
66On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS900$5.00$5.00$5.00$5.00$5.00$5.00
67Special 01. plate pile replacement (obstruction) (SPV.0060)EACH50$500.00$0.01$10.00$1,650.00$920.00$750.00
68Special 01. slope reinforcing steel plate piles (SPV.0165)SF26,160$24.26$25.62$29.73$29.00$34.59$27.00
WisDOT contract 20260414013: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of April 14, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy