WisDOT contract 20260414027 bid tabulation
C Osseo, West St & Elevator St; USH 10/West St to Elevator/North St (LOC STR, Trempealeau County C Osseo, West St & Elevator St). Let by Wisconsin DOT on April 14, 2026, Trempealeau. 7 bids received; low bid $957,975 by McCabe Construction, Inc..
- Owner
- Wisconsin DOT
- Letting
- 14 APR 2026
- Pay items
- 114
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | McCabe Construction, Inc. | $957,975 | Low |
| 2 | Haas Sons, Inc. | $1,003,942 | +5.0% |
| 3 | Stout Construction, Inc. | $1,103,907 | +15% |
| 4 | A-1 Excavating LLC | $1,149,959 | +20% |
| 5 | James Peterson Sons, Inc. | $1,183,231 | +24% |
| 6 | Tri-City Contractors, Inc | $1,187,839 | +24% |
| 7 | Gerke Excavating Inc | $1,230,593 | +28% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. McCabe Construction, Inc. | 2. Haas Sons, Inc. | 3. Stout Construction, Inc. | 4. A-1 Excavating LLC | 5. James Peterson Sons, Inc. | 6. Tri-City Contractors, Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 4 | $305.00 | $1,376.54 | $1,750.00 | $1,200.00 | $895.00 | $800.00 |
| 2 | Removing concrete pavement (204.0100) | SY | 503 | $6.25 | $8.00 | $6.70 | $6.00 | $6.25 | $19.00 |
| 3 | Removing curb & gutter (204.0150) | LF | 24 | $9.00 | $8.00 | $14.55 | $8.00 | $25.00 | $10.00 |
| 4 | Removing manholes (204.0210) | EACH | 8 | $525.00 | $500.00 | $450.00 | $550.00 | $662.69 | $550.00 |
| 5 | Removing inlets (204.0220) | EACH | 1 | $325.00 | $400.00 | $400.00 | $440.00 | $227.69 | $400.00 |
| 6 | Removing storm sewer (size) 01. 10-inch (204.0245) | LF | 27 | $10.00 | $15.00 | $47.50 | $16.00 | $406.41 | $12.00 |
| 7 | Removing storm sewer (size) 02. 24-inch (204.0245) | LF | 346 | $16.85 | $14.50 | $18.50 | $16.00 | $31.80 | $21.00 |
| 8 | Removing (item description) 01. endwalls (204.9060.S) | EACH | 1 | $225.00 | $185.00 | $425.00 | $400.00 | $406.50 | $400.00 |
| 9 | Excavation common (205.0100) | CY | 3,291 | $14.90 | $13.25 | $24.50 | $22.00 | $27.00 | $20.00 |
| 10 | Excavation, hauling, and disposal of petroleum contaminated soil (205.0501.S) | TON | 200 | $75.00 | $83.00 | $145.00 | $50.00 | $88.69 | $91.00 |
| 11 | Finishing roadway (project) 01. 7287-00-72 (213.0100) | EACH | 1 | $1,255.00 | $1.00 | $18,750 | $1,000.00 | $3,000.00 | $1,000.00 |
| 12 | Base aggregate dense 3/4-inch (305.0110) | TON | 5 | $32.00 | $52.00 | $166.25 | $50.00 | $100.00 | $45.60 |
| 13 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 3,224 | $24.00 | $17.50 | $21.85 | $25.00 | $25.25 | $26.60 |
| 14 | Concrete pavement 8 1/2-inch (415.0085) | SY | 8 | $145.47 | $97.00 | $102.00 | $175.00 | $145.47 | $155.00 |
| 15 | Drilled tie bars (416.0610) | EACH | 4 | $16.03 | $6.50 | $6.85 | $17.00 | $16.03 | $16.50 |
| 16 | Drilled dowel bars (416.0620) | EACH | 4 | $19.79 | $16.00 | $16.80 | $21.00 | $19.79 | $21.00 |
| 17 | Tack coat (455.0605) | GAL | 288 | $3.70 | $3.68 | $3.85 | $4.00 | $3.68 | $3.75 |
| 18 | Incentive density HMA pavement (460.2000) | DOL | 830 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 19 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 647 | $83.35 | $83.35 | $87.50 | $99.00 | $83.35 | $85.00 |
| 20 | HMA pavement 4 LT 58-34 S (460.5244) | TON | 647 | $91.36 | $91.36 | $95.95 | $96.00 | $91.36 | $94.00 |
| 21 | Asphaltic surface (465.0105) | TON | 95 | $203.40 | $203.40 | $213.50 | $228.00 | $203.40 | $208.00 |
| 22 | Asphaltic surface driveways and field entrances (465.0120) | TON | 12 | $203.40 | $203.40 | $213.50 | $254.00 | $203.40 | $208.00 |
| 23 | Apron endwalls for culvert pipe 24- inch (520.1024) | EACH | 1 | $250.00 | $830.00 | $600.00 | $1,250.00 | $413.22 | $950.00 |
| 24 | Concrete collars for pipe (520.8000) | EACH | 1 | $500.00 | $650.00 | $1,200.00 | $1,270.00 | $575.00 | $1,000.00 |
| 25 | Concrete curb integral type D (601.0150) | LF | 24 | $13.21 | $19.60 | $20.60 | $26.00 | $13.21 | $15.00 |
| 26 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 3,356 | $18.00 | $16.30 | $17.10 | $20.00 | $18.00 | $19.00 |
| 27 | Concrete sidewalk 4-inch (602.0405) | SF | 2,284 | $6.85 | $6.35 | $6.65 | $8.00 | $6.85 | $7.35 |
| 28 | Curb ramp detectable warning field yellow (602.0505) | SF | 20 | $60.38 | $56.20 | $59.00 | $63.00 | $60.38 | $62.00 |
| 29 | Concrete driveway 6-inch (602.0810) | SY | 495 | $74.60 | $80.50 | $82.95 | $81.00 | $74.60 | $80.00 |
| 30 | Riprap heavy (606.0300) | CY | 15 | $85.25 | $59.33 | $125.00 | $117.00 | $125.00 | $106.00 |
| 31 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 20 | $94.00 | $75.00 | $145.45 | $92.00 | $90.35 | $90.00 |
| 32 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 139 | $70.00 | $76.62 | $78.40 | $84.00 | $85.82 | $92.00 |
| 33 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 320 | $87.00 | $96.22 | $77.30 | $99.00 | $95.87 | $116.00 |
| 34 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 84 | $64.50 | $73.21 | $74.80 | $76.00 | $75.19 | $90.00 |
| 35 | Manhole covers type J (611.0530) | EACH | 4 | $792.00 | $1,130.04 | $1,160.00 | $1,300.00 | $1,186.99 | $900.00 |
| 36 | Inlet covers type DW (611.0613) | EACH | 9 | $985.00 | $1,193.91 | $1,400.00 | $1,600.00 | $1,650.52 | $1,220.00 |
| 37 | Inlet covers type H (611.0624) | EACH | 1 | $903.00 | $1,114.03 | $1,315.00 | $1,500.00 | $1,633.72 | $1,250.00 |
| 38 | Manholes 5-FT diameter (611.2005) | EACH | 4 | $4,915.00 | $5,297.76 | $4,660.00 | $5,900.00 | $6,067.81 | $5,950.00 |
| 39 | Inlets 4-FT diameter (611.3004) | EACH | 3 | $906.00 | $3,100.76 | $2,470.00 | $3,500.00 | $3,047.57 | $3,080.00 |
| 40 | Inlets 2X3-FT (611.3230) | EACH | 7 | $1,886.00 | $2,081.44 | $1,825.00 | $2,400.00 | $2,090.88 | $2,225.00 |
| 41 | Inlets median 2 grate (611.3902) | EACH | 1 | $3,205.00 | $4,249.19 | $4,225.00 | $4,700.00 | $4,075.21 | $4,550.00 |
| 42 | Cover plates temporary (611.8120.S) | EACH | 15 | $50.00 | $49.93 | $107.00 | $150.00 | $250.00 | $175.00 |
| 43 | Salvaged inlet covers (611.9710) | EACH | 2 | $250.00 | $115.98 | $330.00 | $400.00 | $1,015.50 | $300.00 |
| 44 | Insulation board polystyrene (inch) 01. 2-inch (612.0902.S) | SY | 300 | $20.00 | $17.38 | $19.95 | $20.00 | $31.57 | $36.00 |
| 45 | Maintenance and repair of haul roads (project) 01. 7287-00-72 (618.0100) | EACH | 1 | $1.00 | $0.01 | $5,675.00 | $500.00 | $5,000.00 | $500.00 |
| 46 | Mobilization (619.1000) | EACH | 1 | $36,746 | $61,275 | $50,500 | $77,000 | $89,515 | $113,800 |
| 47 | Water (624.0100) | MGAL | 32 | $33.00 | $40.00 | $51.50 | $30.00 | $65.00 | $50.00 |
| 48 | Topsoil (625.0100) | SY | 1,742 | $7.50 | $8.63 | $7.30 | $7.00 | $4.50 | $4.00 |
| 49 | Silt fence (628.1504) | LF | 1,821 | $2.35 | $2.35 | $4.25 | $2.40 | $2.20 | $2.30 |
| 50 | Silt fence maintenance (628.1520) | LF | 1,821 | $0.01 | $0.01 | $0.20 | $0.01 | $0.01 | $0.01 |
| 51 | Mobilizations erosion control (628.1905) | EACH | 8 | $150.00 | $150.00 | $420.00 | $420.00 | $400.00 | $420.00 |
| 52 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $225.00 | $225.00 | $525.00 | $53.00 | $50.00 | $53.00 |
| 53 | Erosion mat urban class I type A (628.2006) | SY | 1,742 | $2.45 | $2.45 | $3.25 | $2.30 | $2.15 | $2.30 |
| 54 | Inlet protection type A (628.7005) | EACH | 1 | $175.00 | $175.00 | $560.00 | $111.00 | $106.00 | $111.00 |
| 55 | Inlet protection type B (628.7010) | EACH | 1 | $75.00 | $75.00 | $150.00 | $74.00 | $70.00 | $75.00 |
| 56 | Inlet protection type C (628.7015) | EACH | 11 | $75.00 | $75.00 | $175.00 | $74.00 | $70.00 | $75.00 |
| 57 | Tracking pads (628.7560) | EACH | 1 | $1,000.00 | $450.00 | $2,050.00 | $500.00 | $0.01 | $400.00 |
| 58 | Fertilizer type A (629.0205) | CWT | 1 | $150.00 | $150.00 | $700.00 | $95.00 | $90.00 | $95.00 |
| 59 | Seeding mixture no. 40 (630.0140) | LB | 78 | $40.00 | $40.00 | $16.00 | $13.00 | $12.00 | $13.00 |
| 60 | Seeding temporary (630.0200) | LB | 47 | $2.75 | $2.75 | $14.75 | $4.00 | $3.55 | $4.00 |
| 61 | Seed water (630.0500) | MGAL | 49 | $30.00 | $30.00 | $51.50 | $1.10 | $1.00 | $1.05 |
| 62 | Posts tubular steel 2X2-inch X 8-FT (634.0808) | EACH | 1 | $175.00 | $175.00 | $640.00 | $220.00 | $208.00 | $220.00 |
| 63 | Signs type II reflective H (637.2210) | SF | 5.50 | $28.00 | $28.00 | $85.00 | $25.00 | $23.00 | $24.00 |
| 64 | Moving signs type II (638.2102) | EACH | 2 | $80.00 | $80.00 | $325.00 | $30.00 | $25.00 | $27.00 |
| 65 | Moving small sign supports (638.4000) | EACH | 2 | $80.00 | $80.00 | $325.00 | $30.00 | $25.00 | $27.00 |
| 66 | Field office type B (642.5001) | EACH | 1 | $7,500.00 | $13,700 | $3,700.00 | $5,000.00 | $9,000.00 | $9,000.00 |
| 67 | Traffic control barricades type III (643.0420) | DAY | 1,032 | $0.80 | $0.80 | $0.85 | $0.90 | $0.80 | $0.85 |
| 68 | Traffic control warning lights type A (643.0705) | DAY | 2,064 | $0.15 | $0.15 | $0.15 | $0.20 | $0.15 | $0.16 |
| 69 | Traffic control signs (643.0900) | DAY | 1,806 | $0.80 | $0.80 | $0.85 | $0.90 | $0.80 | $0.84 |
| 70 | Traffic control signs PCMS (643.1050) | DAY | 14 | $50.00 | $50.00 | $52.50 | $53.00 | $50.00 | $53.00 |
| 71 | Traffic control (643.5000) | EACH | 1 | $1,600.00 | $1,600.00 | $1,680.00 | $13,000 | $1,600.00 | $5,000.00 |
| 72 | Geotextile type HR (645.0120) | SY | 4 | $10.00 | $7.50 | $75.00 | $14.00 | $125.00 | $10.00 |
| 73 | Construction staking storm sewer (650.4000) | EACH | 16 | $111.10 | $300.00 | $115.00 | $116.00 | $300.00 | $315.00 |
| 74 | Construction staking subgrade (650.4500) | LF | 1,759 | $0.01 | $0.01 | $0.25 | $0.30 | $0.01 | $0.01 |
| 75 | Construction staking base (650.5000) | LF | 1,759 | $1.26 | $0.75 | $1.30 | $1.30 | $0.75 | $0.80 |
| 76 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 3,380 | $1.26 | $0.90 | $1.30 | $1.30 | $0.90 | $0.95 |
| 77 | Construction staking curb ramps (650.9000) | EACH | 2 | $120.00 | $300.00 | $120.00 | $121.00 | $300.00 | $315.00 |
| 78 | Construction staking sidewalk (project) 01. 7287-00-72 (650.9500) | EACH | 1 | $505.00 | $1,000.00 | $525.00 | $525.00 | $1,000.00 | $1,050.00 |
| 79 | Construction staking supplemental control (project) 01. 7287-00-72 (650.9911) | EACH | 1 | $2,272.50 | $1,000.00 | $2,350.00 | $2,400.00 | $1,000.00 | $1,050.00 |
| 80 | Construction staking slope stakes (650.9920) | LF | 1,759 | $1.26 | $1.00 | $1.30 | $1.30 | $1.00 | $1.05 |
| 81 | Sawing asphalt (690.0150) | LF | 287 | $1.75 | $2.50 | $2.00 | $2.00 | $1.74 | $3.00 |
| 82 | Sawing concrete (690.0250) | LF | 606 | $2.25 | $2.75 | $2.50 | $3.00 | $2.95 | $4.00 |
| 83 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 84 | Incentive iri ride (740.0440) | DOL | 1,200 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 85 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 300 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 86 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 300 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 87 | Special 01. sanitary sewer manhole with casting 4-FT diameter (SPV.0060) | EACH | 7 | $5,100.00 | $5,975.00 | $5,825.00 | $5,600.00 | $6,385.69 | $6,090.00 |
| 88 | Special 02. connect to existing sanitary sewer main (SPV.0060) | EACH | 3 | $925.00 | $825.00 | $1,025.00 | $1,800.00 | $2,458.18 | $1,050.00 |
| 89 | Special 03. connect to existing sanitary sewer service (SPV.0060) | EACH | 8 | $95.00 | $140.00 | $200.00 | $500.00 | $825.46 | $125.00 |
| 90 | Special 04. sanitary sewer wye, 10-inch X 4-inch (SPV.0060) | EACH | 6 | $415.00 | $364.00 | $350.00 | $275.00 | $389.25 | $600.00 |
| 91 | Special 05. sanitary sewer wye, 10-inch X 6-inch (SPV.0060) | EACH | 2 | $445.00 | $364.00 | $455.00 | $300.00 | $445.25 | $615.00 |
| 92 | Special 06. exploratory excavation (SPV.0060) | EACH | 1 | $700.00 | $975.00 | $850.00 | $325.00 | $1,000.00 | $650.00 |
| 93 | Special 07. remove existing hydrant and lead (SPV.0060) | EACH | 1 | $680.00 | $775.00 | $850.00 | $1,100.00 | $813.00 | $250.00 |
| 94 | Special 08. remove existing gate valve (SPV.0060) | EACH | 2 | $225.00 | $200.00 | $425.00 | $400.00 | $813.00 | $200.00 |
| 95 | Special 09. connect to existing water main (SPV.0060) | EACH | 3 | $1,800.00 | $1,350.00 | $1,550.00 | $2,500.00 | $2,786.45 | $2,150.00 |
| 96 | Special 10. lower water main (SPV.0060) | EACH | 1 | $4,000.00 | $6,500.00 | $4,600.00 | $5,500.00 | $5,426.56 | $1,500.00 |
| 97 | Special 11. gate valve and box 6- inch (SPV.0060) | EACH | 5 | $2,340.00 | $2,700.00 | $2,625.00 | $2,500.00 | $2,426.32 | $2,735.00 |
| 98 | Special 12. gate valve and box 10- inch (SPV.0060) | EACH | 4 | $4,275.00 | $4,900.00 | $4,800.00 | $4,600.00 | $5,191.44 | $5,340.00 |
| 99 | Special 13. hydrant 8.5-FT bury depth (SPV.0060) | EACH | 3 | $6,005.00 | $6,975.00 | $7,100.00 | $6,500.00 | $7,402.55 | $7,600.00 |
| 100 | Special 14. connect to existing water service (SPV.0060) | EACH | 4 | $125.00 | $125.00 | $700.00 | $400.00 | $649.66 | $140.00 |
| 101 | Special 15. corporation stop 1-inch (SPV.0060) | EACH | 5 | $325.00 | $475.00 | $620.00 | $600.00 | $309.81 | $1,010.00 |
| 102 | Special 16. curb stop & box 1-inch (SPV.0060) | EACH | 5 | $425.00 | $515.00 | $750.00 | $800.00 | $443.87 | $685.00 |
| 103 | Special 17. maintain water service during construction (SPV.0060) | EACH | 1 | $3,830.00 | $2,500.00 | $60,000 | $1,000.00 | $14,066 | $7,000.00 |
| 104 | Special 01. water main fittings (SPV.0085) | LB | 900 | $13.40 | $16.50 | $15.75 | $17.00 | $13.86 | $22.00 |
| 105 | Special 01. sanitary sewer service 4-inch PVC (SPV.0090) | LF | 180 | $57.00 | $44.00 | $57.85 | $40.00 | $66.92 | $44.00 |
| 106 | Special 02. sanitary sewer service 6-inch PVC (SPV.0090) | LF | 60 | $65.00 | $49.75 | $65.80 | $50.00 | $70.13 | $48.00 |
| 107 | Special 03. sanitary sewer main 10- inch (SPV.0090) | LF | 1,561 | $53.15 | $54.50 | $35.90 | $70.00 | $58.76 | $57.00 |
| 108 | Special 04. televise sanitary sewer main (SPV.0090) | LF | 1,561 | $2.00 | $2.00 | $2.35 | $1.50 | $4.05 | $2.00 |
| 109 | Special 05. water service 1-inch (SPV.0090) | LF | 151 | $55.00 | $39.75 | $26.70 | $40.00 | $61.85 | $41.00 |
| 110 | Special 06. water main C900 6-inch (SPV.0090) | LF | 164 | $48.00 | $50.00 | $49.50 | $60.00 | $62.59 | $74.00 |
| 111 | Special 07. water main C900 10- inch (SPV.0090) | LF | 1,604 | $60.00 | $64.00 | $48.60 | $65.00 | $64.19 | $75.00 |
| 112 | Special 08. water main C900 12- inch (SPV.0090) | LF | 3 | $185.00 | $275.00 | $300.00 | $150.00 | $35.93 | $140.00 |
| 113 | Special 01. bedding for pipe stabilization (SPV.0195) | TON | 100 | $22.00 | $31.00 | $50.25 | $40.00 | $27.48 | $40.00 |
| 114 | Special 01. sanitary manhole excess depth 4-FT diameter (SPV.0200) | VF | 10.01 | $350.00 | $350.00 | $325.00 | $600.00 | $179.00 | $400.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of April 14, 2026. Compiled by Mirage Metrics.