WisDOT contract 20260512013 bid tabulation
Brown Co, CTH Ee; Navigator Way - Quarry Park Dr (CTH EE, Brown County Brown Co, CTH EE). Let by Wisconsin DOT on May 12, 2026, Brown. 3 bids received; low bid $1,709,782 by Peters Concrete Company.
- Owner
- Wisconsin DOT
- Letting
- 12 MAY 2026
- Pay items
- 134
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Peters Concrete Company | $1,709,782 | Low |
| 2 | Relyco Plus, LLC | $1,921,713 | +12% |
| 3 | James Peterson Sons, Inc. | $2,030,918 | +19% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Peters Concrete Company | 2. Relyco Plus, LLC | 3. James Peterson Sons, Inc. |
|---|---|---|---|---|---|---|
| 1 | Removing small pipe culverts (203.0100) | EACH | 3 | $100.00 | $462.00 | $450.00 |
| 2 | Removing curb & gutter (204.0150) | LF | 600 | $3.00 | $5.00 | $6.00 |
| 3 | Removing manholes (204.0210) | EACH | 2 | $750.00 | $685.00 | $750.00 |
| 4 | Removing inlets (204.0220) | EACH | 1 | $300.00 | $560.00 | $450.00 |
| 5 | Removing storm sewer (size) 01. 18-inch (204.0245) | LF | 495 | $29.20 | $15.92 | $26.42 |
| 6 | Removing storm sewer (size) 02. 54X40-inch (204.0245) | LF | 165 | $51.60 | $14.00 | $28.15 |
| 7 | Excavation common (205.0100) | CY | 9,460 | $12.42 | $18.50 | $10.94 |
| 8 | Excavation marsh (205.0400) | CY | 1,542 | $33.25 | $36.15 | $10.94 |
| 9 | Select borrow (208.1100) | CY | 2,313 | $1.00 | $0.01 | $0.01 |
| 10 | Finishing roadway (project) 01. 9277-03-73 (213.0100) | EACH | 1 | $2,500.00 | $3,000.00 | $1,500.00 |
| 11 | Base aggregate dense 3/4-inch (305.0110) | TON | 300 | $35.00 | $38.00 | $28.04 |
| 12 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 12,500 | $15.05 | $15.92 | $21.85 |
| 13 | Base aggregate open-graded (310.0115) | CY | 22 | $40.00 | $45.76 | $38.50 |
| 14 | Breaker run (311.0110) | TON | 2,280 | $14.50 | $16.97 | $15.80 |
| 15 | Coloring concrete wisdot red (405.0100) | CY | 220 | $76.33 | $76.33 | $76.33 |
| 16 | Coloring concrete custom (405.0200) | CY | 25 | $95.00 | $95.00 | $95.00 |
| 17 | Stamping colored concrete (405.1000) | CY | 25 | $95.00 | $95.00 | $95.00 |
| 18 | Concrete truck apron 12-inch (415.2010) | SY | 652 | $81.00 | $81.00 | $81.00 |
| 19 | Tack coat (455.0605) | GAL | 1,300 | $4.65 | $4.65 | $4.65 |
| 20 | Incentive density HMA pavement (460.2000) | DOL | 2,140 | $1.00 | $1.00 | $1.00 |
| 21 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 2,390 | $89.85 | $89.85 | $89.85 |
| 22 | HMA pavement 4 MT 58-28 H (460.6424) | TON | 940 | $112.55 | $112.55 | $112.55 |
| 23 | Asphaltic flumes (465.0315) | SY | 24 | $75.00 | $75.00 | $75.00 |
| 24 | Apron endwalls for culvert pipe 15- inch (520.1015) | EACH | 2 | $200.00 | $455.00 | $232.08 |
| 25 | Apron endwalls for culvert pipe 18- inch (520.1018) | EACH | 4 | $250.00 | $533.00 | $264.13 |
| 26 | Culvert pipe class III-A 15-inch (520.3315) | LF | 32 | $45.00 | $74.85 | $91.96 |
| 27 | Culvert pipe class III-A 18-inch (520.3318) | LF | 62 | $49.50 | $86.70 | $97.61 |
| 28 | Apron endwalls for culvert pipe reinforced concrete 15-inch (522.1015) | EACH | 2 | $1,500.00 | $1,384.00 | $1,387.59 |
| 29 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 1 | $1,900.00 | $2,056.00 | $1,754.61 |
| 30 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 19X30-inch (522.2419) | LF | 76 | $172.40 | $176.30 | $189.61 |
| 31 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619) | EACH | 2 | $2,150.00 | $2,083.00 | $3,192.09 |
| 32 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 48X76-inch (522.2648) | EACH | 2 | $9,300.00 | $7,111.00 | $9,167.30 |
| 33 | Concrete curb & gutter 18-inch type A (601.0405) | LF | 224 | $29.00 | $29.00 | $29.00 |
| 34 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 1,610 | $22.14 | $22.14 | $22.14 |
| 35 | Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553) | LF | 1,259 | $24.99 | $24.99 | $24.99 |
| 36 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 791 | $23.16 | $23.16 | $23.16 |
| 37 | Concrete curb & gutter 4-inch sloped 30-inch type R (601.0581) | LF | 346 | $23.02 | $23.02 | $23.02 |
| 38 | Concrete curb pedestrian (601.0600) | LF | 80 | $65.12 | $65.12 | $65.12 |
| 39 | Concrete sidewalk 4-inch (602.0405) | SF | 16,040 | $6.10 | $6.35 | $6.10 |
| 40 | Concrete sidewalk 6-inch (602.0415) | SF | 910 | $6.90 | $7.10 | $6.90 |
| 41 | Curb ramp detectable warning field natural patina (602.0515) | SF | 320 | $30.00 | $30.00 | $30.00 |
| 42 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 40 | $93.20 | $74.65 | $108.55 |
| 43 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 132 | $72.30 | $83.25 | $1,191.11 |
| 44 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 20 | $94.75 | $78.00 | $114.67 |
| 45 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 52 | $90.00 | $80.70 | $117.60 |
| 46 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 312 | $113.65 | $133.95 | $162.37 |
| 47 | Manhole covers type J-special (611.0535) | EACH | 2 | $500.00 | $508.00 | $944.00 |
| 48 | Inlet covers type HM-S (611.0636) | EACH | 5 | $715.00 | $750.00 | $1,385.00 |
| 49 | Inlet covers type H-S (611.0639) | EACH | 1 | $715.00 | $750.00 | $1,385.00 |
| 50 | Inlet covers type MS (611.0642) | EACH | 2 | $600.00 | $501.00 | $594.00 |
| 51 | Inlet covers type T (611.0652) | EACH | 2 | $1,200.00 | $1,018.00 | $1,780.00 |
| 52 | Manholes 4-FT diameter (611.2004) | EACH | 1 | $3,745.00 | $4,593.00 | $3,696.00 |
| 53 | Manholes 5-FT diameter (611.2005) | EACH | 1 | $5,400.00 | $6,242.00 | $5,148.00 |
| 54 | Inlets 4-FT diameter (611.3004) | EACH | 2 | $3,870.00 | $4,383.00 | $3,212.00 |
| 55 | Inlets 2X3-FT (611.3230) | EACH | 4 | $2,150.00 | $3,083.00 | $1,984.00 |
| 56 | Inlets median 2 grate (611.3902) | EACH | 1 | $3,395.00 | $4,085.00 | $2,677.00 |
| 57 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 436 | $23.00 | $19.75 | $14.82 |
| 58 | Mobilization (619.1000) | EACH | 1 | $88,000 | $233,600 | $170,800 |
| 59 | Concrete median sloped nose (620.0300) | SF | 432 | $11.00 | $11.00 | $11.00 |
| 60 | Water (624.0100) | MGAL | 190 | $5.00 | $0.01 | $35.00 |
| 61 | Topsoil (625.0100) | SY | 10,700 | $1.60 | $0.01 | $3.50 |
| 62 | Topsoil (625.0105) | CY | 40 | $49.00 | $62.86 | $48.00 |
| 63 | Silt fence (628.1504) | LF | 810 | $2.05 | $2.00 | $2.00 |
| 64 | Silt fence maintenance (628.1520) | LF | 1,620 | $0.01 | $0.01 | $0.01 |
| 65 | Mobilizations erosion control (628.1905) | EACH | 5 | $250.00 | $150.00 | $150.00 |
| 66 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $250.00 | $75.00 | $75.00 |
| 67 | Erosion mat class I type B (628.2004) | SY | 8,500 | $1.05 | $1.58 | $1.58 |
| 68 | Erosion mat urban class I type B (628.2008) | SY | 2,160 | $1.85 | $1.90 | $1.90 |
| 69 | Inlet protection type A (628.7005) | EACH | 12 | $95.00 | $25.00 | $25.00 |
| 70 | Inlet protection type B (628.7010) | EACH | 2 | $55.00 | $68.00 | $68.00 |
| 71 | Inlet protection type C (628.7015) | EACH | 3 | $55.00 | $72.00 | $72.00 |
| 72 | Inlet protection type D (628.7020) | EACH | 8 | $95.00 | $135.00 | $135.00 |
| 73 | Temporary ditch checks (628.7504) | LF | 170 | $6.75 | $7.50 | $7.50 |
| 74 | Culvert pipe checks (628.7555) | EACH | 33 | $18.00 | $15.00 | $15.00 |
| 75 | Fertilizer type B (629.0210) | CWT | 7 | $85.00 | $95.00 | $95.00 |
| 76 | Seeding mixture no. 20 (630.0120) | LB | 480 | $8.75 | $7.50 | $7.50 |
| 77 | Seed water (630.0500) | MGAL | 250 | $15.00 | $5.00 | $5.00 |
| 78 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 35 | $110.00 | $74.00 | $74.00 |
| 79 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 4 | $115.00 | $78.00 | $78.00 |
| 80 | Signs type II reflective H (637.2210) | SF | 323.75 | $23.00 | $23.65 | $23.65 |
| 81 | Signs type II reflective F (637.2230) | SF | 34 | $24.00 | $22.88 | $22.88 |
| 82 | Moving signs type II (638.2102) | EACH | 4 | $110.00 | $75.00 | $75.00 |
| 83 | Removing signs type II (638.2602) | EACH | 26 | $28.00 | $35.00 | $35.00 |
| 84 | Removing small sign supports (638.3000) | EACH | 26 | $28.00 | $35.00 | $35.00 |
| 85 | Field office type B (642.5001) | EACH | 1 | $8,000.00 | $8,500.00 | $13,500 |
| 86 | Traffic control barricades type III (643.0420) | DAY | 2,944 | $0.60 | $0.60 | $0.45 |
| 87 | Traffic control warning lights type A (643.0705) | DAY | 4,416 | $0.11 | $0.11 | $0.09 |
| 88 | Traffic control signs (643.0900) | DAY | 24,932 | $0.20 | $0.20 | $0.14 |
| 89 | Traffic control covering signs type II (643.0920) | EACH | 3 | $45.00 | $45.00 | $100.00 |
| 90 | Traffic control signs PCMS (643.1050) | DAY | 28 | $85.00 | $85.00 | $50.00 |
| 91 | Traffic control (643.5000) | EACH | 1 | $19,000 | $19,000 | $24,160 |
| 92 | Geotextile type DF schedule A (645.0111) | SY | 316 | $2.50 | $4.20 | $3.62 |
| 93 | Marking line epoxy 6-inch (646.2020) | LF | 7,260 | $0.55 | $0.55 | $0.55 |
| 94 | Marking line epoxy 10-inch (646.4020) | LF | 190 | $1.25 | $1.25 | $1.25 |
| 95 | Marking dotted extension epoxy 18-inch (646.6320) | LF | 170 | $18.30 | $18.30 | $18.30 |
| 96 | Marking diagonal epoxy 12-inch (646.7120) | LF | 180 | $17.80 | $17.80 | $17.80 |
| 97 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 300 | $17.35 | $17.35 | $17.35 |
| 98 | Marking curb epoxy (646.8120) | LF | 40 | $8.75 | $8.75 | $8.75 |
| 99 | Marking island nose epoxy (646.8220) | EACH | 4 | $328.40 | $328.40 | $328.40 |
| 100 | Construction staking storm sewer (650.4000) | EACH | 18 | $125.00 | $125.00 | $125.00 |
| 101 | Construction staking subgrade (650.4500) | LF | 1,860 | $0.01 | $0.01 | $0.01 |
| 102 | Construction staking base (650.5000) | LF | 1,860 | $1.00 | $1.00 | $1.00 |
| 103 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 4,310 | $0.90 | $0.90 | $0.90 |
| 104 | Construction staking pipe culverts (650.6000) | EACH | 3 | $200.00 | $200.00 | $200.00 |
| 105 | Construction staking electrical installations (project) 01. 9277-03- 73 (650.8501) | EACH | 1 | $2,500.00 | $2,500.00 | $2,500.00 |
| 106 | Construction staking curb ramps (650.9000) | EACH | 12 | $200.00 | $200.00 | $200.00 |
| 107 | Construction staking sidewalk (project) 01. 9277-03-73 (650.9500) | EACH | 1 | $100.00 | $100.00 | $100.00 |
| 108 | Construction staking supplemental control (project) 01. 9277-03-73 (650.9911) | EACH | 1 | $10.00 | $10.00 | $10.00 |
| 109 | Construction staking slope stakes (650.9920) | LF | 1,860 | $1.25 | $1.25 | $1.25 |
| 110 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 138 | $25.00 | $25.00 | $25.00 |
| 111 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 1,582 | $6.00 | $6.00 | $6.00 |
| 112 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 10 | $2,200.00 | $2,200.00 | $2,200.00 |
| 113 | Concrete bases type 5 (654.0105) | EACH | 12 | $1,575.00 | $1,575.00 | $1,575.00 |
| 114 | Concrete control cabinet bases type L24 (654.0224) | EACH | 1 | $2,000.00 | $2,000.00 | $2,000.00 |
| 115 | Electrical wire lighting 12 AWG (655.0610) | LF | 2,304 | $0.90 | $0.90 | $0.90 |
| 116 | Electrical wire lighting 10 AWG (655.0615) | LF | 6,802 | $1.00 | $1.00 | $1.00 |
| 117 | Electrical service meter breaker pedestal (location) 01. LCC A (656.0201) | EACH | 1 | $1,950.00 | $1,950.00 | $1,950.00 |
| 118 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 12 | $620.00 | $620.00 | $620.00 |
| 119 | Poles type 5-aluminum (657.0322) | EACH | 12 | $1,840.00 | $1,840.00 | $1,840.00 |
| 120 | Luminaire arms single member 4 1/2-inch clamp 8-FT (657.0615) | EACH | 12 | $320.00 | $320.00 | $320.00 |
| 121 | Luminaires utility LED A (659.1115) | EACH | 12 | $340.00 | $340.00 | $340.00 |
| 122 | Lighting control cabinets 120/240 24-inch (659.2124) | EACH | 1 | $8,000.00 | $8,000.00 | $8,000.00 |
| 123 | Public land survey monument verify and reset (680.0100) | EACH | 3 | $1,000.00 | $1,000.00 | $1,000.00 |
| 124 | Sawing asphalt (690.0150) | LF | 123 | $2.50 | $2.25 | $2.25 |
| 125 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 | $1.00 | $1.00 |
| 126 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,000 | $5.00 | $5.00 | $5.00 |
| 127 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,200 | $5.00 | $5.00 | $5.00 |
| 128 | Special 01. inlets 2X3-FT special (SPV.0060) | EACH | 2 | $2,485.00 | $3,280.00 | $2,025.00 |
| 129 | Special 02. temporary water diversion - station 21+00 (SPV.0060) | EACH | 1 | $2,500.00 | $0.01 | $500.00 |
| 130 | Special 03. adjusting water valve boxes (SPV.0060) | EACH | 4 | $200.00 | $330.50 | $250.00 |
| 131 | Special 04. temporary lighting system, CTH EE/CTH EB roundabout (SPV.0060) | EACH | 1 | $3,500.00 | $3,500.00 | $3,500.00 |
| 132 | Special 01. culvert pipe reinforced concrete horizontal elliptical class HE-IV 48X76 (SPV.0090) | LF | 252 | $511.00 | $503.70 | $517.56 |
| 133 | Special 01. weed barrier (SPV.0165) | SF | 1,720 | $0.82 | $1.50 | $1.50 |
| 134 | Special 01. double shredded hardwood mulch (SPV.0180) | SY | 200 | $10.40 | $15.00 | $15.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of May 12, 2026. Compiled by Mirage Metrics.