WisDOT contract 20260512015 bid tabulation

Clear Lake - Cumberland; USH 8 E to STH 48 W (USH 063, Barron County Clear Lake - Cumberland). Let by Wisconsin DOT on May 12, 2026, Barron. 1 bid received; low bid $8,660,372 by Monarch Paving Company.

Owner
Wisconsin DOT
Letting
12 MAY 2026
Pay items
132
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Monarch Paving Company$8,660,372Low
WisDOT contract 20260512015: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Monarch Paving Company
1Clearing (201.0105)STA1$750.00
2Grubbing (201.0205)STA1$1,000.00
3Removing small pipe culverts (203.0100)EACH15$500.00
4Removing structure (structure) 01. C-03-67 (203.0220)EACH1$11,000
5Removing structure (structure) 02. sta. 547+00, 60-inch CPRC (203.0220)EACH1$5,000.00
6Removing structure (structure) 03. sta. 547+10, 60-inch CPRC (203.0220)EACH1$5,000.00
7Removing concrete pavement (204.0100)SY1,886$10.55
8Removing concrete surface partial depth (204.0109.S)SF1,286$7.44
9Removing asphaltic surface (204.0110)SY740$7.50
10Removing asphaltic surface butt joints (204.0115)SY96$26.90
11Removing asphaltic surface milling (204.0120)SY240,984$2.60
12Removing curb & gutter (204.0150)LF185$10.00
13Removing guardrail (204.0165)LF1,408$3.20
14Excavation common (205.0100)CY6,169$20.33
15Borrow (208.0100)CY551$22.69
16Temporary lane shift during culvert work (208.1500.S)EACH7$10,036
17Backfill granular grade 2 (209.2500)TON4,416$15.83
18Prepare foundation for asphaltic paving (project) 01. 1550-04-78 (211.0101)EACH1$91,867
19Prepare foundation for asphaltic shoulders (211.0400)STA1,059$11.53
20Finishing roadway (project) 01. 1550-04-78 (213.0100)EACH1$4,531.00
21Base aggregate dense 3/4-inch (305.0110)TON2,897$24.32
22Base aggregate dense 1 1/4-inch (305.0120)TON4,333$17.84
23Tack coat (455.0605)GAL30,339$3.22
24HMA percent within limits (PWL) test strip volumetrics (460.0105.S)EACH2$8,200.00
25HMA percent within limits (PWL) test strip density (460.0110.S)EACH2$2,250.00
26Incentive density PWL HMA pavement (460.2005)DOL34,400$1.00
27Incentive density HMA pavement longitudinal joints (460.2007)DOL34,820$1.00
28Incentive air voids HMA pavement (460.2010)DOL47,930$1.00
29HMA pavement 4 MT 58-28 S (460.6224)TON25,732$89.30
30HMA pavement 5 MT 58-28 S (460.6225)TON22,125$94.43
31Material transfer vehicle (460.9000.S)EACH1$29,300
32Asphaltic surface (465.0105)TON1,639$155.21
33Asphaltic surface patching (465.0110)TON215$272.21
34Asphaltic surface driveways and field entrances (465.0120)TON108$227.44
35Asphaltic surface temporary (465.0125)TON425$155.21
36Asphaltic flumes (465.0315)SY11$59.52
37Asphaltic rumble strips, shoulder (465.0520)LF99,870$0.29
38Asphaltic rumble strips, centerline (465.0560)LF47,674$0.29
39Resin binder high friction surface treatment (490.0100.S)SY6,224$24.03
40Apron endwalls for culvert pipe 18- inch (520.1018)EACH2$531.50
41Culvert pipe temporary 48-inch (520.2048)LF24$378.47
42Culvert pipe class III-A non-metal 18-inch (520.3418)LF52$65.88
43Concrete collars for pipe (520.8000)EACH10$830.00
44Cleaning culvert pipes (520.8700)EACH8$1,490.00
45Culvert pipe reinforced concrete class III 24-inch (522.0124)LF138$248.11
46Culvert pipe reinforced concrete class III 30-inch (522.0130)LF56$296.02
47Culvert pipe reinforced concrete class III 36-inch (522.0136)LF14$326.19
48Culvert pipe reinforced concrete class IV 24-inch (522.0424)LF56$264.11
49Culvert pipe reinforced concrete class IV 30-inch (522.0430)LF128$263.48
50Culvert pipe reinforced concrete class IV 42-inch (522.0442)LF58$409.24
51Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024)EACH10$2,204.61
52Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030)EACH7$2,394.25
53Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036)EACH1$2,913.19
54Apron endwalls for culvert pipe reinforced concrete 42-inch (522.1042)EACH2$3,771.63
55Culvert pipe reinforced concrete horizontal elliptical class HE-III 58X91-inch (522.2358)LF82$916.11
56Culvert pipe reinforced concrete horizontal elliptical class HE-III 68X106-inch (522.2368)LF74$1,043.50
57Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 58X91-inch (522.2658)EACH2$9,322.23
58Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 68X106-inch (522.2668)EACH2$14,170
59Concrete curb & gutter 30-inch type D (601.0411)LF30$71.15
60Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557)LF155$73.00
61Concrete barrier temporary precast delivered (603.8000)LF1,550$16.35
62Concrete barrier temporary precast installed (603.8125)LF2,800$5.04
63Anchoring concrete barrier temporary precast (603.8500)LF1,400$11.25
64Riprap extra-light (606.0050)CY11$153.73
65Riprap light (606.0100)CY6$158.15
66Riprap medium (606.0200)CY9$158.15
67Adjusting manhole covers (611.8110)EACH1$841.17
68Cover plates temporary (611.8120.S)EACH1$346.00
69Barrier system grading shaping finishing (614.0010)EACH2$7,669.00
70Guardrail mow strip emulsified asphalt (614.0397)SY270$17.45
71Crash cushions temporary (614.0905)EACH7$4,750.00
72MGS guardrail 3 (614.2300)LF375$26.25
73MGS guardrail 3 K (614.2330)LF1,050$38.60
74MGS guardrail terminal eat (614.2610)EACH4$3,965.00
75Maintenance and repair of haul roads (project) 01. 1550-04-78 (618.0100)EACH1$1.00
76Mobilization (619.1000)EACH1$579,110
77Water (624.0100)MGAL64$50.00
78Topsoil (625.0100)SY9,119$10.47
79Mulching (627.0200)SY5,442$0.38
80Silt fence (628.1504)LF3,811$1.90
81Silt fence maintenance (628.1520)LF3,811$0.01
82Silt fence heavy duty (628.1530.S)LF964$10.70
83Silt fence heavy duty maintenance (628.1535.S)LF964$0.01
84Mobilizations erosion control (628.1905)EACH10$485.00
85Mobilizations emergency erosion control (628.1910)EACH5$1.00
86Erosion mat urban class I type B (628.2008)SY4,928$1.75
87Erosion mat class III type C (628.2037)SY460$24.35
88Temporary ditch checks (628.7504)LF100$8.00
89Culvert pipe checks (628.7555)EACH106$16.00
90Fertilizer type B (629.0210)CWT4$150.00
91Seeding mixture no. 20 (630.0120)LB394$18.00
92Seeding temporary (630.0200)LB190$5.10
93Seed water (630.0500)MGAL245$1.00
94Delineators flexible (633.0200)EACH72$57.50
95Markers culvert end (633.5200)EACH72$57.50
96Moving signs type II (638.2102)EACH2$200.00
97Field office type B (642.5001)EACH1$22,250
98Traffic control drums (643.0300)DAY5,504$0.20
99Traffic control barricades type III (643.0420)DAY304$1.00
100Traffic control warning lights type A (643.0705)DAY342$0.11
101Traffic control warning lights type C (643.0715)DAY1,881$0.13
102Traffic control signs (643.0900)DAY9,005$0.30
103Traffic control signs fixed message (643.1000)SF54$20.00
104Temporary marking line paint 6- inch (643.3165)LF221,925$0.25
105Temporary marking line epoxy 6- inch (643.3170)LF100,401$0.72
106Temporary marking stop line paint 18-inch (643.3805)LF48$14.00
107Traffic control (643.5000)EACH1$119,148
108Geotextile type HR (645.0120)SY28$8.86
109Geotextile type R (645.0130)SY69$9.40
110Marking line grooved wet ref epoxy 6-inch (646.2040)LF211,842$1.20
111Marking line grooved wet ref epoxy 10-inch (646.4040)LF1,335$2.20
112Marking diagonal epoxy 12-inch (646.7120)LF1,450$11.00
113Marking removal line 6-inch (646.9002)LF4,108$1.80
114Locating no-passing zones (648.0100)MI10.70$450.00
115Construction staking subgrade (650.4500)LF2,719$0.01
116Construction staking base (650.5000)LF2,719$0.01
117Construction staking pipe culverts (650.6000)EACH14$350.00
118Construction staking resurfacing reference (650.8000)LF56,681$0.06
119Construction staking supplemental control (project) 01. 1550-04-78 (650.9911)EACH1$1,969.76
120Construction staking slope stakes (650.9920)LF1,955$0.60
121Temporary traffic signals for bridges (structure) 01. sta. 507+75 culvert C-03-687 (661.0101)EACH1$2,157.50
122Temporary traffic signals for bridges (structure) 02. sta. 547+07 culvert replacement (661.0101)EACH1$2,157.50
123Sawing asphalt (690.0150)LF1,241$2.25
124Sawing concrete (690.0250)LF303$2.75
125Incentive iri ride (740.0440)DOL42,940$1.00
126Maintaining bird deterrent system (station) 01. sta. 507+75 culvert C- 03-687 (999.2005.S)EACH1$500.00
127On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,500$5.00
128On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS2,000$5.00
129Special 01. ditch cleaning (SPV.0090)LF50$38.98
130Special 02. UV GRP cipp liners 24-inch (SPV.0090)LF154$230.00
131Special 03. UV GRP cipp liners 36-inch (SPV.0090)LF110$410.00
132Special 04. UV GRP cipp liners 48-inch (SPV.0090)LF188$540.00
WisDOT contract 20260512015: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of May 12, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy