WisDOT contract 20260512019 bid tabulation
C Eau Claire, County Line Rd; 2800 W of Jeffers Rd to Jeffers Rd (LOC STR, Eau Claire County C Eau Claire, County Line Rd). Let by Wisconsin DOT on May 12, 2026, Eau Claire. 2 bids received; low bid $2,619,008 by Haas Sons, Inc..
- Owner
- Wisconsin DOT
- Letting
- 12 MAY 2026
- Pay items
- 164
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Haas Sons, Inc. | $2,619,008 | Low |
| 2 | A-1 Excavating LLC | $2,757,004 | +5.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Haas Sons, Inc. | 2. A-1 Excavating LLC |
|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 24 | $0.01 | $1.00 |
| 2 | Grubbing (201.0205) | STA | 24 | $835.00 | $1.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 6 | $250.00 | $400.00 |
| 4 | Removing concrete pavement (204.0100) | SY | 13 | $6.00 | $20.00 |
| 5 | Removing curb & gutter (204.0150) | LF | 654 | $4.25 | $6.00 |
| 6 | Removing concrete sidewalk (204.0155) | SY | 123 | $5.00 | $12.00 |
| 7 | Removing guardrail (204.0165) | LF | 413 | $3.85 | $5.00 |
| 8 | Excavation common (205.0100) | CY | 9,182 | $10.00 | $12.00 |
| 9 | Borrow (208.0100) | CY | 2,043 | $18.00 | $12.00 |
| 10 | Finishing roadway (project) 01. 7995-02-74 (213.0100) | EACH | 1 | $100.00 | $300.00 |
| 11 | Base aggregate dense 3/4-inch (305.0110) | TON | 46 | $43.00 | $26.00 |
| 12 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 13,210 | $16.50 | $21.00 |
| 13 | Base aggregate open-graded (310.0115) | CY | 12 | $77.00 | $90.00 |
| 14 | Coloring concrete wisdot red (405.0100) | CY | 183 | $86.00 | $90.00 |
| 15 | Concrete truck apron 12-inch (415.2010) | SY | 548 | $110.00 | $113.00 |
| 16 | Tack coat (455.0605) | GAL | 1,421 | $4.49 | $4.70 |
| 17 | Incentive density HMA pavement (460.2000) | DOL | 3,160 | $1.00 | $1.00 |
| 18 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 3,503 | $82.67 | $86.00 |
| 19 | HMA pavement 4 LT 58-34 S (460.5244) | TON | 1,434 | $91.64 | $95.00 |
| 20 | Asphaltic surface (465.0105) | TON | 454 | $92.91 | $98.00 |
| 21 | Asphaltic surface driveways and field entrances (465.0120) | TON | 31 | $198.95 | $209.00 |
| 22 | Apron endwalls for culvert pipe 18- inch (520.1018) | EACH | 4 | $675.00 | $474.00 |
| 23 | Culvert pipe class III-A 18-inch (520.3318) | LF | 72 | $64.00 | $47.00 |
| 24 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 1 | $1,900.00 | $1,802.00 |
| 25 | Concrete curb & gutter 18-inch type A (601.0405) | LF | 230 | $19.40 | $40.00 |
| 26 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 20 | $32.50 | $67.00 |
| 27 | Concrete curb & gutter 4-inch sloped 30-inch type R (601.0581) | LF | 336 | $17.80 | $37.00 |
| 28 | Concrete curb pedestrian (601.0600) | LF | 42 | $23.60 | $42.00 |
| 29 | Concrete sidewalk 5-inch (602.0410) | SF | 13,450 | $6.60 | $7.00 |
| 30 | Curb ramp detectable warning field yellow (602.0505) | SF | 198 | $45.75 | $63.00 |
| 31 | Concrete driveway 6-inch (602.0810) | SY | 188 | $61.00 | $70.00 |
| 32 | Riprap light (606.0100) | CY | 3 | $101.00 | $150.00 |
| 33 | Riprap medium (606.0200) | CY | 5 | $101.00 | $150.00 |
| 34 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 219 | $79.90 | $71.00 |
| 35 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 85 | $76.25 | $77.00 |
| 36 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 92 | $101.00 | $108.00 |
| 37 | Storm sewer pipe reinforced concrete class IV 30-inch (608.0430) | LF | 346 | $134.50 | $140.00 |
| 38 | Storm sewer pipe class III-A 12- inch (608.3012) | LF | 206 | $55.00 | $59.00 |
| 39 | Storm sewer pipe class III-A 24- inch (608.3024) | LF | 1,753 | $54.00 | $57.00 |
| 40 | Storm sewer pipe class III-A 30- inch (608.3030) | LF | 63 | $93.00 | $89.00 |
| 41 | Manhole covers type J (611.0530) | EACH | 9 | $1,135.00 | $696.00 |
| 42 | Inlet covers type H (611.0624) | EACH | 24 | $1,250.00 | $999.00 |
| 43 | Inlet covers type MS (611.0642) | EACH | 1 | $750.00 | $671.00 |
| 44 | Inlet covers type T (611.0652) | EACH | 2 | $1,725.00 | $1,283.00 |
| 45 | Manholes 4-FT diameter (611.2004) | EACH | 4 | $2,790.00 | $3,721.00 |
| 46 | Manholes 5-FT diameter (611.2005) | EACH | 9 | $4,390.00 | $5,824.00 |
| 47 | Manholes 6-FT diameter (611.2006) | EACH | 1 | $5,860.00 | $7,469.00 |
| 48 | Inlets 4-FT diameter (611.3004) | EACH | 4 | $2,850.00 | $3,824.00 |
| 49 | Inlets 2X3-FT (611.3230) | EACH | 17 | $2,200.00 | $2,772.00 |
| 50 | Inlets median 1 grate (611.3901) | EACH | 1 | $3,850.00 | $4,924.00 |
| 51 | Adjusting manhole covers (611.8110) | EACH | 1 | $780.00 | $500.00 |
| 52 | Adjusting inlet covers (611.8115) | EACH | 2 | $570.00 | $600.00 |
| 53 | Pipe underdrain 6-inch (612.0106) | LF | 336 | $6.75 | $13.00 |
| 54 | Maintenance and repair of haul roads (project) 01. 7995-02-74 (618.0100) | EACH | 1 | $50.00 | $300.00 |
| 55 | Mobilization (619.1000) | EACH | 1 | $69,500 | $112,936 |
| 56 | Concrete median sloped nose (620.0300) | SF | 303 | $9.90 | $13.00 |
| 57 | Water (624.0100) | MGAL | 255 | $30.00 | $35.00 |
| 58 | Topsoil (625.0100) | SY | 13,955 | $4.25 | $3.00 |
| 59 | Mulching (627.0200) | SY | 8,725 | $0.75 | $0.55 |
| 60 | Silt fence (628.1504) | LF | 4,808 | $1.95 | $1.90 |
| 61 | Silt fence maintenance (628.1520) | LF | 4,808 | $0.01 | $0.01 |
| 62 | Mobilizations erosion control (628.1905) | EACH | 3 | $25.00 | $210.00 |
| 63 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $35.00 | $105.00 |
| 64 | Erosion mat urban class I type B (628.2008) | SY | 5,575 | $1.90 | $2.10 |
| 65 | Inlet protection type A (628.7005) | EACH | 44 | $110.00 | $107.00 |
| 66 | Inlet protection type B (628.7010) | EACH | 5 | $40.00 | $46.00 |
| 67 | Inlet protection type C (628.7015) | EACH | 30 | $50.00 | $49.00 |
| 68 | Inlet protection type D (628.7020) | EACH | 10 | $175.00 | $153.00 |
| 69 | Temporary ditch checks (628.7504) | LF | 135 | $7.75 | $8.00 |
| 70 | Culvert pipe checks (628.7555) | EACH | 14 | $18.50 | $26.00 |
| 71 | Fertilizer type B (629.0210) | CWT | 9 | $145.00 | $116.00 |
| 72 | Seeding mixture no. 20 (630.0120) | LB | 398 | $18.50 | $9.00 |
| 73 | Seeding mixture no. 40 (630.0140) | LB | 205 | $31.64 | $12.00 |
| 74 | Seeding mixture no. 70 (630.0170) | LB | 2 | $500.00 | $210.00 |
| 75 | Seeding temporary (630.0200) | LB | 127 | $3.00 | $3.00 |
| 76 | Seeding nurse crop (630.0400) | LB | 4 | $10.00 | $42.00 |
| 77 | Seed water (630.0500) | MGAL | 312 | $5.00 | $0.01 |
| 78 | Signs type II reflective H (637.2210) | SF | 89.54 | $24.00 | $19.00 |
| 79 | Signs type II reflective F (637.2230) | SF | 25.50 | $27.25 | $24.00 |
| 80 | Moving signs type II (638.2102) | EACH | 5 | $100.00 | $142.00 |
| 81 | Removing signs type II (638.2602) | EACH | 4 | $25.00 | $34.00 |
| 82 | Removing small sign supports (638.3000) | EACH | 9 | $25.00 | $34.00 |
| 83 | Field office type B (642.5001) | EACH | 1 | $10,000 | $6,000.00 |
| 84 | Traffic control drums (643.0300) | DAY | 4,120 | $0.50 | $0.55 |
| 85 | Traffic control barricades type III (643.0420) | DAY | 3,425 | $0.50 | $0.55 |
| 86 | Traffic control warning lights type A (643.0705) | DAY | 5,170 | $0.10 | $0.11 |
| 87 | Traffic control signs (643.0900) | DAY | 15,410 | $0.55 | $0.60 |
| 88 | Traffic control covering signs type II (643.0920) | EACH | 5 | $30.00 | $33.00 |
| 89 | Traffic control signs PCMS (643.1050) | DAY | 21 | $40.00 | $44.00 |
| 90 | Temporary marking crosswalk removable tape 6-inch (643.3350) | LF | 48 | $2.00 | $2.20 |
| 91 | Traffic control (643.5000) | EACH | 1 | $2,600.00 | $6,600.00 |
| 92 | Temporary pedestrian surface matting (644.1440) | SF | 60 | $5.00 | $5.50 |
| 93 | Temporary pedestrian curb ramp (644.1601) | DAY | 300 | $5.00 | $5.50 |
| 94 | Temporary pedestrian detectable warning field (644.1605) | SF | 20 | $6.00 | $6.60 |
| 95 | Temporary pedestrian barricade (644.1810) | LF | 71 | $8.00 | $8.80 |
| 96 | Geotextile type DF schedule A (645.0111) | SY | 150 | $3.50 | $4.00 |
| 97 | Geotextile type HR (645.0120) | SY | 19 | $5.00 | $8.00 |
| 98 | Geotextile type R (645.0130) | SY | 12 | $5.00 | $6.00 |
| 99 | Marking line epoxy 4-inch (646.1020) | LF | 11,984 | $0.65 | $0.70 |
| 100 | Marking line epoxy 8-inch (646.3020) | LF | 207 | $1.40 | $1.45 |
| 101 | Marking stop line epoxy 18-inch (646.6120) | LF | 14 | $26.00 | $27.00 |
| 102 | Marking dotted extension epoxy 18-inch (646.6320) | LF | 65 | $26.00 | $27.00 |
| 103 | Marking diagonal epoxy 12-inch (646.7120) | LF | 104 | $19.00 | $20.00 |
| 104 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 280 | $13.50 | $14.00 |
| 105 | Marking curb epoxy (646.8120) | LF | 30 | $23.00 | $24.00 |
| 106 | Marking island nose epoxy (646.8220) | EACH | 3 | $320.00 | $336.00 |
| 107 | Construction staking storm sewer (650.4000) | EACH | 37 | $200.00 | $210.00 |
| 108 | Construction staking subgrade (650.4500) | LF | 4,646 | $0.01 | $0.01 |
| 109 | Construction staking base (650.5000) | LF | 4,646 | $1.00 | $1.30 |
| 110 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 7,984 | $1.30 | $1.50 |
| 111 | Construction staking electrical installations (project) 01. 7995-02- 74 (650.8501) | EACH | 1 | $1,000.00 | $1,100.00 |
| 112 | Construction staking curb ramps (650.9000) | EACH | 12 | $120.00 | $130.00 |
| 113 | Construction staking sidewalk (project) 01. 7995-02-74 (650.9500) | EACH | 1 | $1,000.00 | $1,100.00 |
| 114 | Construction staking supplemental control (project) 01. 7995-02-74 (650.9911) | EACH | 1 | $500.00 | $634.00 |
| 115 | Construction staking slope stakes (650.9920) | LF | 4,646 | $0.75 | $1.00 |
| 116 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 1,205 | $9.50 | $10.00 |
| 117 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 14 | $14.00 | $15.00 |
| 118 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 9 | $2,475.00 | $2,599.00 |
| 119 | Concrete bases type 5 (654.0105) | EACH | 11 | $1,280.00 | $1,344.00 |
| 120 | Concrete control cabinet bases type L24 (654.0224) | EACH | 1 | $1,975.00 | $2,074.00 |
| 121 | Electrical wire lighting 12 AWG (655.0610) | LF | 1,590 | $1.50 | $1.60 |
| 122 | Electrical wire lighting 8 AWG (655.0620) | LF | 4,678 | $2.25 | $2.35 |
| 123 | Electrical service meter breaker pedestal (location) 01. sta 10+50 RA (656.0201) | EACH | 1 | $2,275.00 | $2,389.00 |
| 124 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 11 | $790.00 | $830.00 |
| 125 | Poles type 5-aluminum (657.0322) | EACH | 11 | $2,750.00 | $2,888.00 |
| 126 | Luminaire arms single member 4 1/2-inch clamp 6-FT (657.0610) | EACH | 11 | $375.00 | $394.00 |
| 127 | Luminaires utility LED A (659.1115) | EACH | 11 | $325.00 | $341.00 |
| 128 | Lighting control cabinets 120/240 24-inch (659.2124) | EACH | 1 | $8,250.00 | $8,663.00 |
| 129 | Sawing asphalt (690.0150) | LF | 302 | $2.25 | $4.00 |
| 130 | Sawing concrete (690.0250) | LF | 51 | $5.00 | $8.00 |
| 131 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 | $1.00 |
| 132 | Incentive iri ride (740.0440) | DOL | 2,200 | $1.00 | $1.00 |
| 133 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 600 | $5.00 | $5.00 |
| 134 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 800 | $5.00 | $5.00 |
| 135 | Special 10. manhole chimney seal (SPV.0060) | EACH | 7 | $0.01 | $326.00 |
| 136 | Special 11. manhole casting type A lid (SPV.0060) | EACH | 7 | $1,350.00 | $736.00 |
| 137 | Special 12. sanitary sewer service wye, 8-inch X 4-inch (SPV.0060) | EACH | 9 | $225.00 | $350.00 |
| 138 | Special 13. connect to existing sanitary (SPV.0060) | EACH | 1 | $1,370.00 | $3,150.00 |
| 139 | Special 14. construction staking sanitary structure (SPV.0060) | EACH | 17 | $150.00 | $160.00 |
| 140 | Special 15. gate valve & box 6-inch (SPV.0060) | EACH | 4 | $2,460.00 | $2,420.00 |
| 141 | Special 17. gate valve & box resilient wedge 16-inch (SPV.0060) | EACH | 3 | $14,900 | $15,070 |
| 142 | Special 18. fire hydrant (SPV.0060) | EACH | 4 | $6,300.00 | $6,750.00 |
| 143 | Special 19. tap and corporation stop 1-inch (SPV.0060) | EACH | 9 | $350.00 | $350.00 |
| 144 | Special 20. curb stop and box 1- inch (SPV.0060) | EACH | 9 | $635.00 | $600.00 |
| 145 | Special 21. connect to existing water main (SPV.0060) | EACH | 2 | $2,100.00 | $3,210.00 |
| 146 | Special 22. construction staking water main structures (SPV.0060) | EACH | 30 | $100.00 | $110.00 |
| 147 | Special 23. posts steel U-channel 12-FT (SPV.0060) | EACH | 5 | $95.25 | $163.00 |
| 148 | Special 24. posts steel U-channel 10-FT (SPV.0060) | EACH | 22 | $87.00 | $139.00 |
| 149 | Special 25. posts steel U-channel 4-FT (SPV.0060) | EACH | 18 | $110.00 | $86.00 |
| 150 | Special 26. install break out signpost coupler and sleeve (SPV.0060) | EACH | 11 | $150.00 | $205.00 |
| 151 | Special 28. posts steel U-channel 8-FT (SPV.0060) | EACH | 2 | $81.00 | $127.00 |
| 152 | Special 10. water main fittings (SPV.0085) | LB | 1,709 | $11.00 | $13.00 |
| 153 | Special 01. concrete curb & gutter 24-inch type D (SPV.0090) | LF | 7,174 | $13.00 | $18.00 |
| 154 | Special 02. concrete curb & gutter 4-inch sloped 30-inch type D (SPV.0090) | LF | 155 | $32.00 | $58.00 |
| 155 | Special 10. 8-inch sanitary sewer PVC SDR 26 (SPV.0090) | LF | 2,121 | $79.75 | $61.00 |
| 156 | Special 11. 4-inch sanitary service PVC (SPV.0090) | LF | 311 | $45.00 | $33.00 |
| 157 | Special 12. construction staking sanitary pipe (SPV.0090) | LF | 2,121 | $0.75 | $1.00 |
| 158 | Special 13. 8-inch water main DI (SPV.0090) | LF | 31 | $116.00 | $126.00 |
| 159 | Special 14. 12-inch water main DI (SPV.0090) | LF | 20 | $126.50 | $176.00 |
| 160 | Special 15. 16-inch water main DI (SPV.0090) | LF | 1,948 | $156.00 | $141.00 |
| 161 | Special 16. 6-inch hydrant lead (SPV.0090) | LF | 51 | $88.00 | $73.00 |
| 162 | Special 17. water service copper type K 1-inch (SPV.0090) | LF | 387 | $49.00 | $44.00 |
| 163 | Special 18. construction staking water main pipe (SPV.0090) | LF | 1,999 | $0.75 | $1.00 |
| 164 | Special 10. 4-foot manhole masonry - sanitary sewer (SPV.0200) | VF | 134 | $355.00 | $400.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of May 12, 2026. Compiled by Mirage Metrics.