| 1 | Grubbing (201.0220) | ID | 30 | $65.00 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 3 | $1,000.00 |
| 3 | Removing concrete pavement (204.0100) | SY | 6,180 | $24.00 |
| 4 | Removing asphaltic surface (204.0110) | SY | 1,620 | $11.00 |
| 5 | Removing asphaltic surface butt joints (204.0115) | SY | 360 | $10.00 |
| 6 | Removing asphaltic surface milling (204.0120) | SY | 270,075 | $2.90 |
| 7 | Removing curb & gutter (204.0150) | LF | 945 | $14.00 |
| 8 | Removing concrete sidewalk (204.0155) | SY | 141 | $30.00 |
| 9 | Removing guardrail (204.0165) | LF | 9,775 | $2.25 |
| 10 | Removing fence (204.0170) | LF | 30 | $10.00 |
| 11 | Removing delineators and markers (204.0180) | EACH | 224 | $22.00 |
| 12 | Removing surface drains (204.0190) | EACH | 1 | $350.00 |
| 13 | Removing concrete bases (204.0195) | EACH | 29 | $400.00 |
| 14 | Removing manholes (204.0210) | EACH | 1 | $800.00 |
| 15 | Removing inlets (204.0220) | EACH | 6 | $450.00 |
| 16 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 197 | $50.00 |
| 17 | Removing storm sewer (size) 02. 30-inch (204.0245) | LF | 8 | $200.00 |
| 18 | Sealing pipes (204.0280) | EACH | 1 | $2,000.00 |
| 19 | Abandoning sewer (204.0291.S) | CY | 8.60 | $500.00 |
| 20 | Removing (item description) 01. silt fence (204.9090.S) | LF | 7,810 | $0.65 |
| 21 | Excavation common (205.0100) | CY | 5,344 | $40.00 |
| 22 | Borrow (208.0100) | CY | 800 | $30.00 |
| 23 | Prepare foundation for asphaltic paving (project) 01. 1166-04-85 (211.0101) | EACH | 1 | $5,000.00 |
| 24 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 27 | $100.00 |
| 25 | Finishing roadway (project) 01. 1166-04-85 (213.0100) | EACH | 1 | $5,000.00 |
| 26 | Base aggregate dense 3/4-inch (305.0110) | TON | 7,700 | $34.50 |
| 27 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 6,320 | $35.00 |
| 28 | Concrete pavement 9-inch (415.0090) | SY | 1,010 | $94.93 |
| 29 | Concrete pavement approach slab (415.0410) | SY | 175 | $295.50 |
| 30 | Drilled tie bars (416.0610) | EACH | 1,790 | $11.03 |
| 31 | Drilled dowel bars (416.0620) | EACH | 1,530 | $15.59 |
| 32 | Concrete pavement partial depth repair joint repair (416.0750.S) | LF | 10 | $57.69 |
| 33 | Concrete pavement partial depth repair crack repair (416.0752.S) | LF | 730 | $57.69 |
| 34 | Concrete pavement partial depth repair surface repair (416.0754.S) | SF | 70 | $57.69 |
| 35 | Concrete pavement partial depth repair edge repair (416.0756.S) | LF | 10 | $57.69 |
| 36 | Concrete pavement partial depth repair full depth adjustment (416.0758.S) | SF | 10 | $57.69 |
| 37 | Concrete pavement repair (416.1710) | SY | 650 | $119.09 |
| 38 | Concrete pavement replacement (416.1720) | SY | 2,550 | $119.09 |
| 39 | Continuous diamond grinding concrete pavement (420.1000) | SY | 8,300 | $6.77 |
| 40 | HMA cold weather paving (450.4000) | TON | 26,500 | $3.00 |
| 41 | Tack coat (455.0605) | GAL | 33,460 | $2.75 |
| 42 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $3,000.00 |
| 43 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 2 | $3,000.00 |
| 44 | HMA pavement test strip volumetrics (460.0115.S) | EACH | 1 | $3,000.00 |
| 45 | HMA test strip density (460.0120.S) | EACH | 1 | $3,000.00 |
| 46 | Incentive density HMA pavement (460.2000) | DOL | 25,330 | $1.00 |
| 47 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 16,870 | $68.00 |
| 48 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 2,000 | $85.00 |
| 49 | HMA pavement 4 MT 58-28 H (460.6424) | TON | 1,300 | $95.00 |
| 50 | HMA pavement 3 HT 58-28 S (460.7223) | TON | 34,000 | $77.00 |
| 51 | HMA pavement 4 SMA 58-28 H (460.8424) | TON | 19,400 | $99.90 |
| 52 | Material transfer vehicle (460.9000.S) | EACH | 1 | $2,500.00 |
| 53 | Asphaltic surface (465.0105) | TON | 360 | $160.00 |
| 54 | Asphaltic surface patching (465.0110) | TON | 810 | $105.00 |
| 55 | Asphaltic surface temporary (465.0125) | TON | 410 | $105.00 |
| 56 | Asphaltic flumes (465.0315) | SY | 88 | $30.00 |
| 57 | Asphaltic rumble strips, shoulder divided roadway (465.0510) | LF | 118,645 | $0.14 |
| 58 | Concrete collars for pipe (520.8000) | EACH | 2 | $750.00 |
| 59 | Cleaning culvert pipes (520.8700) | EACH | 1 | $1,200.00 |
| 60 | Apron endwalls for culvert pipe steel 12-inch (521.1012) | EACH | 8 | $300.00 |
| 61 | Culvert pipe reinforced concrete class III 24-inch (522.0124) | LF | 58 | $250.00 |
| 62 | Culvert pipe reinforced concrete class IV 30-inch (522.0430) | LF | 64 | $350.00 |
| 63 | Culvert pipe reinforced concrete class IV 36-inch (522.0436) | LF | 90 | $375.00 |
| 64 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 2 | $1,500.00 |
| 65 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 2 | $1,600.00 |
| 66 | Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036) | EACH | 2 | $2,000.00 |
| 67 | Culvert pipe salvaged 30-inch (524.0130) | LF | 24 | $100.00 |
| 68 | Apron endwalls for culvert pipe salvaged 18-inch (524.0618) | EACH | 2 | $750.00 |
| 69 | Apron endwalls for culvert pipe salvaged 30-inch (524.0630) | EACH | 2 | $750.00 |
| 70 | Concrete curb & gutter 18-inch type D (601.0407) | LF | 164 | $60.02 |
| 71 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 220 | $62.33 |
| 72 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 1,730 | $34.97 |
| 73 | Concrete curb & gutter 4-inch sloped 36-inch type A (601.0551) | LF | 327 | $36.06 |
| 74 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 25 | $69.32 |
| 75 | Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588) | LF | 47 | $69.32 |
| 76 | Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590) | LF | 68 | $69.32 |
| 77 | Concrete sidewalk 4-inch (602.0405) | SF | 5,100 | $7.50 |
| 78 | Concrete sidewalk 6-inch (602.0415) | SF | 1,352 | $16.01 |
| 79 | Curb ramp detectable warning field yellow (602.0505) | SF | 40 | $62.51 |
| 80 | Slope paving crushed aggregate (604.0500) | SY | 100 | $20.00 |
| 81 | Riprap medium (606.0200) | CY | 80 | $150.00 |
| 82 | Riprap heavy (606.0300) | CY | 200 | $175.00 |
| 83 | Storm sewer pipe reinforced concrete class III 30-inch (608.0330) | LF | 8 | $400.00 |
| 84 | Storm sewer pipe class III-A 12- inch (608.3012) | LF | 282 | $50.00 |
| 85 | Reconstructing inlets (611.0430) | EACH | 2 | $1,900.00 |
| 86 | Inlet covers type HM (611.0627) | EACH | 1 | $1,400.00 |
| 87 | Inlet covers type V (611.0654) | EACH | 8 | $1,100.00 |
| 88 | Inlets 2X2.5-FT (611.3225) | EACH | 8 | $2,700.00 |
| 89 | Adjusting inlet covers (611.8115) | EACH | 6 | $600.00 |
| 90 | Cover plates temporary (611.8120.S) | EACH | 2 | $600.00 |
| 91 | Insulation board polystyrene (inch) 01. 2-inch (612.0902.S) | SY | 8 | $200.00 |
| 92 | Steel thrie beam bullnose terminal (614.0220) | EACH | 4 | $14,900 |
| 93 | Steel thrie beam (614.0230) | LF | 225 | $40.00 |
| 94 | MGS guardrail 3 (614.2300) | LF | 8,300 | $28.00 |
| 95 | MGS thrie beam transition (614.2500) | LF | 354.60 | $88.00 |
| 96 | MGS guardrail terminal eat (614.2610) | EACH | 12 | $3,800.00 |
| 97 | MGS guardrail terminal type 2 (614.2620) | EACH | 5 | $2,800.00 |
| 98 | Fence woven wire (height) 01. 4- FT (616.0100) | LF | 30 | $50.00 |
| 99 | Maintenance and repair of haul roads (project) 01. 1166-04-85 (618.0100) | EACH | 1 | $1.00 |
| 100 | Mobilization (619.1000) | EACH | 1 | $396,486 |
| 101 | Concrete median sloped nose (620.0300) | SF | 390 | $18.37 |
| 102 | Water (624.0100) | MGAL | 170 | $20.00 |
| 103 | Topsoil (625.0100) | SY | 23,200 | $8.00 |
| 104 | Silt fence (628.1504) | LF | 11,300 | $1.95 |
| 105 | Silt fence maintenance (628.1520) | LF | 18,910 | $0.01 |
| 106 | Mobilizations erosion control (628.1905) | EACH | 11 | $100.00 |
| 107 | Mobilizations emergency erosion control (628.1910) | EACH | 6 | $100.00 |
| 108 | Erosion mat urban class I type B (628.2008) | SY | 22,500 | $1.60 |
| 109 | Erosion mat class II type C (628.2027) | SY | 700 | $3.75 |
| 110 | Inlet protection type A (628.7005) | EACH | 8 | $125.00 |
| 111 | Inlet protection type B (628.7010) | EACH | 3 | $60.00 |
| 112 | Inlet protection type C (628.7015) | EACH | 35 | $70.00 |
| 113 | Temporary ditch checks (628.7504) | LF | 300 | $9.00 |
| 114 | Culvert pipe checks (628.7555) | EACH | 50 | $19.00 |
| 115 | Rock bags (628.7570) | EACH | 370 | $19.00 |
| 116 | Fertilizer type B (629.0210) | CWT | 11.40 | $90.00 |
| 117 | Seeding mixture no. 30 (630.0130) | LB | 800 | $8.95 |
| 118 | Seeding mixture no. 40 (630.0140) | LB | 200 | $12.50 |
| 119 | Seeding temporary (630.0200) | LB | 610 | $4.75 |
| 120 | Seed water (630.0500) | MGAL | 130 | $10.00 |
| 121 | Delineator posts steel (633.0100) | EACH | 224 | $35.00 |
| 122 | Delineator reflectors (633.0500) | EACH | 265 | $8.00 |
| 123 | Markers culvert end (633.5200) | EACH | 18 | $65.00 |
| 124 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 2 | $85.00 |
| 125 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 3 | $90.00 |
| 126 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 8 | $95.00 |
| 127 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 5 | $100.00 |
| 128 | Posts wood 4X6-inch X 20-FT (634.0620) | EACH | 1 | $125.00 |
| 129 | Moving signs type II (638.2102) | EACH | 47 | $200.00 |
| 130 | Removing small sign supports (638.3000) | EACH | 20 | $35.00 |
| 131 | Field office type C (642.5201) | EACH | 1 | $22,060 |
| 132 | Traffic control drums (643.0300) | DAY | 110,000 | $0.20 |
| 133 | Digital speed reduction system (DSRS) (643.0370.S) | DAY | 1,350 | $22.86 |
| 134 | Traffic control barricades type III (643.0420) | DAY | 5,800 | $0.65 |
| 135 | Traffic control flexible tubular marker posts (643.0500) | EACH | 105 | $10.00 |
| 136 | Traffic control flexible tubular marker bases (643.0600) | EACH | 105 | $5.00 |
| 137 | Traffic control warning lights type A (643.0705) | DAY | 11,500 | $0.01 |
| 138 | Traffic control warning lights type C (643.0715) | DAY | 7,800 | $0.01 |
| 139 | Traffic control connected arrow boards (643.0810) | DAY | 240 | $20.64 |
| 140 | Traffic control signs (643.0900) | DAY | 18,500 | $0.60 |
| 141 | Traffic control covering signs type I (643.0910) | EACH | 13 | $200.00 |
| 142 | Traffic control covering signs type II (643.0920) | EACH | 55 | $40.00 |
| 143 | Traffic control signs fixed message (643.1000) | SF | 85 | $10.00 |
| 144 | Traffic control signs PCMS (643.1050) | DAY | 330 | $28.29 |
| 145 | Basic traffic queue warning system (643.1205.S) | DAY | 350 | $58.52 |
| 146 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 290 | $9.00 |
| 147 | Temporary marking line paint 6- inch (643.3165) | LF | 259,100 | $0.25 |
| 148 | Temporary marking line removable tape 6-inch (643.3180) | LF | 67,400 | $3.00 |
| 149 | Temporary marking line removable tape 10-inch (643.3280) | LF | 1,000 | $6.00 |
| 150 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 200 | $17.00 |
| 151 | Temporary marking removable mask out tape 8-inch (643.3980) | LF | 26,360 | $8.00 |
| 152 | Temporary marking removable mask out tape 12-inch (643.3990) | LF | 1,100 | $18.00 |
| 153 | Traffic control (643.5000) | EACH | 1 | $57,652 |
| 154 | Geotextile type HR (645.0120) | SY | 490 | $8.00 |
| 155 | Marking line epoxy 4-inch (646.1020) | LF | 550 | $3.50 |
| 156 | Marking line epoxy 6-inch (646.2020) | LF | 81 | $0.85 |
| 157 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 15,900 | $0.80 |
| 158 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 155,140 | $1.18 |
| 159 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 5,315 | $2.25 |
| 160 | Marking arrow epoxy (646.5020) | EACH | 4 | $355.00 |
| 161 | Marking symbol epoxy (646.5220) | EACH | 4 | $275.00 |
| 162 | Marking aerial enforcement bar epoxy (646.5420) | EACH | 4 | $275.00 |
| 163 | Marking stop line epoxy 18-inch (646.6120) | LF | 45 | $24.00 |
| 164 | Cold weather marking epoxy 6-inch (646.6466) | LF | 160,240 | $0.32 |
| 165 | Cold weather marking epoxy 10- inch (646.6470) | LF | 4,540 | $0.49 |
| 166 | Marking chevron epoxy 24-inch (646.7220) | LF | 420 | $14.00 |
| 167 | Marking crosswalk epoxy block style 24-inch (646.7520) | LF | 18 | $25.00 |
| 168 | Marking curb epoxy (646.8120) | LF | 318 | $10.00 |
| 169 | Marking island nose epoxy (646.8220) | EACH | 6 | $340.00 |
| 170 | Marking parking stall epoxy (646.8320) | LF | 2,740 | $4.00 |
| 171 | Marking removal line 4-inch (646.9000) | LF | 73,700 | $0.42 |
| 172 | Marking removal line 6-inch (646.9002) | LF | 26,000 | $0.43 |
| 173 | Marking removal line wide (646.9200) | LF | 450 | $1.75 |
| 174 | Marking removal special marking (646.9300) | EACH | 8 | $160.00 |
| 175 | Construction staking storm sewer (650.4000) | EACH | 18 | $200.00 |
| 176 | Construction staking subgrade (650.4500) | LF | 2,094 | $0.75 |
| 177 | Construction staking base (650.5000) | LF | 1,766 | $0.85 |
| 178 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 3,003 | $2.50 |
| 179 | Construction staking pipe culverts (650.6000) | EACH | 3 | $150.00 |
| 180 | Construction staking concrete pavement (650.7000) | LF | 328 | $4.00 |
| 181 | Construction staking resurfacing reference (650.8000) | LF | 75,147 | $0.12 |
| 182 | Construction staking electrical installations (project) 01. 1166-04- 85 (650.8501) | EACH | 1 | $3,500.00 |
| 183 | Construction staking curb ramps (650.9000) | EACH | 4 | $200.00 |
| 184 | Construction staking sidewalk (project) 01. 1166-04-85 (650.9500) | EACH | 1 | $1,500.00 |
| 185 | Construction staking supplemental control (project) 01. 1166-04-85 (650.9911) | EACH | 1 | $4,000.00 |
| 186 | Construction staking slope stakes (650.9920) | LF | 12,054 | $1.00 |
| 187 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 2,510 | $12.00 |
| 188 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 42 | $15.00 |
| 189 | Conduit special 2-inch (652.0605) | LF | 550 | $28.00 |
| 190 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 8 | $2,900.00 |
| 191 | Concrete bases type 2 (654.0102) | EACH | 2 | $1,850.00 |
| 192 | Concrete bases type 5 (654.0105) | EACH | 16 | $1,700.00 |
| 193 | Concrete bases type 11 (654.0111) | EACH | 8 | $1,150.00 |
| 194 | Concrete control cabinet bases type L30 (654.0230) | EACH | 1 | $1,925.00 |
| 195 | Electrical wire lighting 12 AWG (655.0610) | LF | 17,616 | $1.90 |
| 196 | Electrical service meter breaker pedestal (location) 01. rest area 81 (656.0201) | EACH | 1 | $3,750.00 |
| 197 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 15 | $750.00 |
| 198 | Poles type 5-aluminum (657.0322) | EACH | 15 | $5,125.00 |
| 199 | Luminaire arms single member 4 1/2-inch clamp 6-FT (657.0610) | EACH | 9 | $475.00 |
| 200 | Luminaire arms truss type 4 1/2- inch clamp 12-FT (657.0710) | EACH | 10 | $625.00 |
| 201 | Lighting units walkway (659.0700) | EACH | 8 | $2,600.00 |
| 202 | Luminaires utility LED B (659.1120) | EACH | 19 | $425.00 |
| 203 | Lighting control cabinets 120/240 30-inch (659.2130) | EACH | 1 | $13,750 |
| 204 | Sawing asphalt (690.0150) | LF | 820 | $1.95 |
| 205 | Sawing concrete (690.0250) | LF | 12,650 | $2.55 |
| 206 | Incentive iri ride (740.0440) | DOL | 102,960 | $1.00 |
| 207 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,100 | $5.00 |
| 208 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 4,800 | $5.00 |
| 209 | Special 01. fertilizer for lawn type turf (SPV.0030) | CWT | 5 | $200.00 |
| 210 | Special 01. incentive density PWL HMA pavement (SPV.0055) | DOL | 28,500 | $1.00 |
| 211 | Special 02. incentive air voids HMA pavement (SPV.0055) | DOL | 34,000 | $1.00 |
| 212 | Special 03. incentive density HMA pavement longitudinal joints (SPV.0055) | DOL | 12,130 | $1.00 |
| 213 | Special 01. remove and salvage light pole assemblies rest area 81 (SPV.0060) | EACH | 22 | $1,800.00 |
| 214 | Special 02. salvage and reinstall light pole assemblies rest area 82 (SPV.0060) | EACH | 2 | $2,390.00 |
| 215 | Special 03. connecting to existing water line (SPV.0060) | EACH | 1 | $2,000.00 |
| 216 | Special 04. yard hydrant (SPV.0060) | EACH | 1 | $2,000.00 |
| 217 | Special 05. curb stop 1-inch (SPV.0060) | EACH | 1 | $2,000.00 |
| 218 | Special 06. salvage and reinstall ramp gate (SPV.0060) | EACH | 1 | $9,000.00 |
| 219 | Special 07. digital speed limit trailer pad (SPV.0060) | EACH | 30 | $700.00 |
| 220 | Special 01. concrete curb and gutter repair (SPV.0090) | LF | 90 | $142.76 |
| 221 | Special 02. curb & gutter 42-inch special (SPV.0090) | LF | 422 | $47.00 |
| 222 | Special 03. HDPE water service 1- inch (SPV.0090) | LF | 205 | $100.00 |
| 223 | Special 04. UV GRP cipp 30-inch (SPV.0090) | LF | 100 | $295.00 |
| 224 | Special 05. salvaging and reinstalling rail (SPV.0090) | LF | 182.40 | $40.00 |
| 225 | Special 01. marking mobile reflectometer measurements (MRM) (SPV.0125) | MI | 34.80 | $190.00 |
| 226 | Special 01. removing distressed asphaltic surface milling (SPV.0180) | SY | 2,230 | $5.00 |
| 227 | Special 02. preparing topsoil for lawn type turf (SPV.0180) | SY | 4,082 | $0.50 |