WisDOT contract 20260811004 bid tabulation
Viroqua - Richland Center; S Jcn STH 131 to Fancy Ck B-52-223 (STH 056, Richland County Viroqua - Richland Center). Let by Wisconsin DOT on August 11, 2026, Richland. 3 bids received; low bid $8,884,289 by Mathy Construction Company.
- Owner
- Wisconsin DOT
- Letting
- 11 AUG 2026
- Pay items
- 178
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Mathy Construction Company | $8,884,289 | Low |
| 2 | Meise Construction Inc | $9,243,248 | +4.0% |
| 3 | Gerke Excavating Inc | $9,528,406 | +7.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Mathy Construction Company | 2. Meise Construction Inc | 3. Gerke Excavating Inc |
|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 3 | $700.00 | $2,000.00 | $4,350.00 |
| 2 | Clearing (201.0120) | ID | 53 | $40.00 | $37.00 | $75.00 |
| 3 | Grubbing (201.0205) | STA | 3 | $400.00 | $3,000.00 | $965.00 |
| 4 | Grubbing (201.0220) | ID | 97 | $18.00 | $37.00 | $15.00 |
| 5 | Removing small pipe culverts (203.0100) | EACH | 4 | $850.00 | $900.00 | $956.90 |
| 6 | Debris containment over waterway (structure) 01. B-52-50 (203.0335) | EACH | 1 | $5,500.00 | $6,000.00 | $5,500.00 |
| 7 | Removing asphaltic surface (204.0110) | SY | 649 | $6.00 | $5.00 | $5.62 |
| 8 | Removing asphaltic surface butt joints (204.0115) | SY | 1,043 | $15.00 | $5.00 | $15.00 |
| 9 | Removing asphaltic surface milling (204.0120) | SY | 23,256 | $4.83 | $5.00 | $4.83 |
| 10 | Removing curb & gutter (204.0150) | LF | 120 | $6.00 | $10.00 | $9.55 |
| 11 | Removing concrete sidewalk (204.0155) | SY | 57 | $12.00 | $10.00 | $20.10 |
| 12 | Removing guardrail (204.0165) | LF | 1,910 | $2.00 | $4.03 | $2.00 |
| 13 | Removing fence (204.0170) | LF | 1,890 | $2.00 | $3.20 | $2.00 |
| 14 | Removing delineators and markers (204.0180) | EACH | 41 | $15.00 | $23.00 | $15.00 |
| 15 | Removing inlets (204.0220) | EACH | 1 | $300.00 | $750.00 | $1,205.73 |
| 16 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 20 | $25.00 | $50.00 | $55.21 |
| 17 | Removing (item description) 01. endwall (204.9060.S) | EACH | 18 | $100.00 | $351.00 | $302.20 |
| 18 | Excavation common (205.0100) | CY | 30,959 | $12.50 | $20.81 | $12.49 |
| 19 | Temporary lane shift during culvert work (208.1500.S) | EACH | 2 | $2,000.00 | $10,876 | $41,586 |
| 20 | Prepare foundation for asphaltic paving (project) 01. 5730-00-64 (211.0101) | EACH | 1 | $20,666 | $23,000 | $20,666 |
| 21 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 9 | $765.41 | $766.00 | $2,152.87 |
| 22 | Finishing roadway (project) 01. 5730-00-64 (213.0100) | EACH | 1 | $5,500.00 | $20,000 | $7,997.25 |
| 23 | Base aggregate dense 3/4-inch (305.0110) | TON | 2,534 | $30.00 | $30.26 | $24.90 |
| 24 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 31,941 | $20.90 | $21.15 | $21.07 |
| 25 | Breaker run (311.0110) | TON | 25,654 | $21.00 | $21.15 | $17.93 |
| 26 | Mill and relay (330.0100) | SY | 159,774 | $3.01 | $3.02 | $3.87 |
| 27 | QMP mill and relay compaction (374.1010.S) | SY | 159,774 | $0.14 | $0.15 | $0.14 |
| 28 | Tack coat (455.0605) | GAL | 20,471 | $3.00 | $3.05 | $3.00 |
| 29 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $10,000 | $11,000 | $10,000 |
| 30 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 2 | $10,000 | $11,000 | $10,000 |
| 31 | Incentive density HMA pavement (460.2000) | DOL | 1,090 | $1.00 | $1.00 | $1.00 |
| 32 | Incentive density PWL HMA pavement (460.2005) | DOL | 27,090 | $1.00 | $1.00 | $1.00 |
| 33 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 10,380 | $1.00 | $1.00 | $1.00 |
| 34 | Incentive air voids HMA pavement (460.2010) | DOL | 33,620 | $1.00 | $1.00 | $1.00 |
| 35 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 33,620 | $89.74 | $90.00 | $89.74 |
| 36 | Asphaltic surface (465.0105) | TON | 332 | $319.78 | $320.00 | $319.78 |
| 37 | Asphaltic surface driveways and field entrances (465.0120) | TON | 34 | $268.03 | $309.00 | $268.03 |
| 38 | Asphaltic surface temporary (465.0125) | TON | 123 | $166.20 | $183.00 | $166.20 |
| 39 | Asphaltic flumes (465.0315) | SY | 18 | $386.24 | $774.00 | $386.24 |
| 40 | Asphaltic rumble strips, edge line (465.0540) | LF | 5,418 | $0.22 | $0.25 | $0.37 |
| 41 | Asphaltic rumble strips, centerline sinusoidal (465.0565) | LF | 44,695 | $0.22 | $0.25 | $0.24 |
| 42 | Resin binder high friction surface treatment (490.0100.S) | SY | 1,768 | $25.28 | $28.00 | $25.28 |
| 43 | Protective surface treatment (502.3200) | SY | 531 | $4.00 | $4.40 | $4.00 |
| 44 | Concrete masonry endwalls (504.0900) | CY | 91 | $1,450.00 | $1,777.00 | $1,583.07 |
| 45 | Preparation decks type 1 (509.0301) | SY | 237 | $185.00 | $190.00 | $185.00 |
| 46 | Preparation decks type 2 (509.0302) | SY | 185 | $215.00 | $216.00 | $215.00 |
| 47 | Cleaning decks to reapply concrete masonry overlay (509.0505.S) | SY | 531 | $25.00 | $28.00 | $25.00 |
| 48 | Concrete surface repair (509.1500) | SF | 42 | $335.00 | $369.00 | $335.00 |
| 49 | Full-depth deck repair (509.2000) | SY | 12 | $560.00 | $550.00 | $560.00 |
| 50 | Concrete masonry overlay decks (509.2500) | CY | 30 | $2,700.00 | $2,750.00 | $2,700.00 |
| 51 | Removing concrete masonry deck overlay (structure) 01. B-52-50 (509.9005.S) | SY | 531 | $61.54 | $63.00 | $61.54 |
| 52 | Containment and collection of waste materials (structure) 01. B- 52-50 (517.4001.S) | EACH | 1 | $10,000 | $11,000 | $10,000 |
| 53 | Concrete collars for pipe (520.8000) | EACH | 20 | $500.00 | $300.00 | $856.90 |
| 54 | Apron endwalls for culvert pipe steel 18-inch (521.1018) | EACH | 4 | $400.00 | $415.00 | $721.07 |
| 55 | Apron endwalls for culvert pipe steel 24-inch (521.1024) | EACH | 16 | $450.00 | $500.00 | $782.91 |
| 56 | Apron endwalls for culvert pipe steel 30-inch (521.1030) | EACH | 1 | $800.00 | $750.00 | $1,659.71 |
| 57 | Apron endwalls for culvert pipe steel 36-inch (521.1036) | EACH | 1 | $1,000.00 | $1,000.00 | $1,452.56 |
| 58 | Culvert pipe corrugated steel 18- inch (521.3118) | LF | 208 | $100.00 | $67.00 | $62.62 |
| 59 | Culvert pipe corrugated steel 24- inch (521.3124) | LF | 126 | $130.00 | $75.00 | $215.54 |
| 60 | Culvert pipe corrugated steel 30- inch (521.3130) | LF | 2 | $500.00 | $500.00 | $703.69 |
| 61 | Culvert pipe corrugated steel 36- inch (521.3136) | LF | 8 | $200.00 | $200.00 | $401.75 |
| 62 | Culvert pipe reinforced concrete horizontal elliptical class HE-III 24X38-inch (522.2324) | LF | 112 | $280.00 | $204.00 | $265.87 |
| 63 | Apron endwalls for culvert pipe aluminum 12-inch (525.0312) | EACH | 1 | $450.00 | $1,000.00 | $685.62 |
| 64 | Culvert pipe corrugated polyethylene 12-inch (530.0112) | LF | 26 | $60.00 | $70.00 | $59.22 |
| 65 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 88 | $54.07 | $60.00 | $54.07 |
| 66 | Concrete curb & gutter 4-inch sloped 30-inch type J (601.0576) | LF | 938 | $32.69 | $30.00 | $32.69 |
| 67 | Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588) | LF | 50 | $34.12 | $60.00 | $34.12 |
| 68 | Concrete sidewalk 4-inch (602.0405) | SF | 545 | $17.64 | $18.00 | $17.64 |
| 69 | Curb ramp detectable warning field yellow (602.0505) | SF | 20 | $60.38 | $60.00 | $60.38 |
| 70 | Concrete driveway 6-inch (602.0810) | SY | 32 | $117.64 | $92.00 | $117.64 |
| 71 | Concrete barrier type S32 (603.1132) | LF | 51 | $354.15 | $454.00 | $354.15 |
| 72 | Concrete barrier temporary precast delivered (603.8000) | LF | 600 | $23.80 | $12.00 | $23.80 |
| 73 | Concrete barrier temporary precast installed (603.8125) | LF | 1,200 | $11.75 | $6.54 | $11.75 |
| 74 | Riprap light (606.0100) | CY | 862 | $70.00 | $75.00 | $96.68 |
| 75 | Riprap medium (606.0200) | CY | 68 | $100.00 | $85.00 | $106.05 |
| 76 | Riprap heavy (606.0300) | CY | 136 | $120.00 | $95.00 | $108.84 |
| 77 | Riprap extra-heavy (606.0400) | CY | 20 | $100.00 | $100.00 | $144.97 |
| 78 | Inlet covers type HM-GJ (611.0630) | EACH | 1 | $500.00 | $1,110.00 | $1,384.93 |
| 79 | Inlet covers type MS (611.0642) | EACH | 8 | $700.00 | $620.00 | $832.25 |
| 80 | Inlet covers type V (611.0654) | EACH | 1 | $800.00 | $1,200.00 | $1,019.95 |
| 81 | Inlets 2X2-FT (611.3220) | EACH | 1 | $2,000.00 | $4,057.00 | $2,150.45 |
| 82 | Inlets 2X3-FT (611.3230) | EACH | 1 | $2,100.00 | $4,488.00 | $2,560.84 |
| 83 | Inlets median 2 grate (611.3902) | EACH | 4 | $3,100.00 | $5,419.00 | $4,714.33 |
| 84 | Steel thrie beam structure approach (614.0200) | LF | 20.70 | $90.00 | $97.00 | $90.00 |
| 85 | Steel plate beam guard energy absorbing terminal (614.0370) | EACH | 1 | $3,293.00 | $4,017.00 | $3,293.00 |
| 86 | Guardrail mow strip emulsified asphalt (614.0397) | SY | 4,187 | $8.33 | $9.27 | $8.33 |
| 87 | MGS guardrail 3 (614.2300) | LF | 5,687.50 | $26.03 | $29.00 | $26.03 |
| 88 | MGS guardrail 3 K (614.2330) | LF | 2,037.50 | $42.03 | $42.00 | $42.03 |
| 89 | MGS thrie beam transition (614.2500) | LF | 587.20 | $90.00 | $96.00 | $90.00 |
| 90 | MGS guardrail terminal eat (614.2610) | EACH | 37 | $3,293.00 | $4,223.00 | $3,293.00 |
| 91 | Maintenance and repair of haul roads (project) 01. 5730-00-64 (618.0100) | EACH | 1 | $16,000 | $20,000 | $0.01 |
| 92 | Mobilization (619.1000) | EACH | 1 | $823,542 | $785,000 | $1,352,237 |
| 93 | Water (624.0100) | MGAL | 1,584 | $35.00 | $35.00 | $27.87 |
| 94 | Salvaged topsoil (625.0500) | SY | 64,600 | $1.50 | $1.00 | $1.33 |
| 95 | Mulching (627.0200) | SY | 9,320 | $0.33 | $0.42 | $0.33 |
| 96 | Silt fence (628.1504) | LF | 31,957 | $1.53 | $2.16 | $1.53 |
| 97 | Silt fence maintenance (628.1520) | LF | 31,957 | $0.03 | $0.01 | $0.03 |
| 98 | Mobilizations erosion control (628.1905) | EACH | 10 | $153.00 | $464.00 | $153.00 |
| 99 | Mobilizations emergency erosion control (628.1910) | EACH | 6 | $193.00 | $500.00 | $193.00 |
| 100 | Erosion mat class I type A (628.2002) | SY | 29,000 | $0.95 | $1.08 | $0.95 |
| 101 | Erosion mat class I type B (628.2004) | SY | 13,700 | $0.95 | $1.08 | $0.95 |
| 102 | Erosion mat urban class I type B (628.2008) | SY | 9,180 | $1.60 | $2.16 | $1.60 |
| 103 | Inlet protection type A (628.7005) | EACH | 12 | $105.00 | $109.00 | $105.00 |
| 104 | Inlet protection type C (628.7015) | EACH | 3 | $95.00 | $74.00 | $95.00 |
| 105 | Temporary ditch checks (628.7504) | LF | 900 | $5.53 | $7.21 | $5.53 |
| 106 | Stone ditch checks (628.7515.S) | CY | 14 | $200.00 | $109.00 | $110.00 |
| 107 | Culvert pipe checks (628.7555) | EACH | 247 | $15.00 | $16.50 | $15.00 |
| 108 | Rock bags (628.7570) | EACH | 5 | $25.00 | $14.00 | $25.00 |
| 109 | Fertilizer type B (629.0210) | CWT | 77 | $95.00 | $99.00 | $95.00 |
| 110 | Seeding mixture no. 20 (630.0120) | LB | 3,775 | $6.13 | $7.21 | $6.13 |
| 111 | Seeding mixture no. 40 (630.0140) | LB | 4 | $75.00 | $15.00 | $75.00 |
| 112 | Seeding mixture no. 70 (630.0170) | LB | 78 | $130.00 | $119.00 | $130.00 |
| 113 | Seeding mixture no. 75 (630.0175) | LB | 66 | $50.00 | $119.00 | $50.00 |
| 114 | Seeding temporary (630.0200) | LB | 3,130 | $3.13 | $3.66 | $3.13 |
| 115 | Seed water (630.0500) | MGAL | 2,900 | $1.00 | $0.35 | $1.00 |
| 116 | Delineators barrier wall (633.1000) | EACH | 3 | $250.00 | $57.00 | $250.00 |
| 117 | Markers row (633.5100) | EACH | 32 | $65.00 | $57.00 | $65.00 |
| 118 | Markers culvert end (633.5200) | EACH | 25 | $65.00 | $74.00 | $65.00 |
| 119 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 70 | $90.00 | $98.00 | $90.00 |
| 120 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 57 | $95.00 | $103.00 | $95.00 |
| 121 | Moving signs type II (638.2102) | EACH | 123 | $50.00 | $118.00 | $50.00 |
| 122 | Removing small sign supports (638.3000) | EACH | 127 | $25.00 | $26.00 | $25.00 |
| 123 | Field office type C (642.5201) | EACH | 1 | $12,500 | $20,000 | $13,968 |
| 124 | Traffic control drums (643.0300) | DAY | 3,408 | $0.15 | $0.15 | $0.15 |
| 125 | Traffic control barricades type III (643.0420) | DAY | 46 | $1.00 | $1.00 | $1.00 |
| 126 | Traffic control warning lights type A (643.0705) | DAY | 92 | $0.15 | $0.15 | $0.15 |
| 127 | Traffic control warning lights type C (643.0715) | DAY | 1,242 | $0.15 | $0.15 | $0.15 |
| 128 | Traffic control signs (643.0900) | DAY | 15,232 | $0.16 | $0.16 | $0.16 |
| 129 | Traffic control signs PCMS (643.1050) | DAY | 14 | $25.00 | $25.00 | $25.00 |
| 130 | Temporary marking line paint 6- inch (643.3165) | LF | 302,747 | $0.23 | $0.19 | $0.23 |
| 131 | Temporary marking stop line paint 18-inch (643.3805) | LF | 22 | $5.00 | $20.00 | $5.00 |
| 132 | Traffic control (643.5000) | EACH | 1 | $39,500 | $41,000 | $39,500 |
| 133 | Temporary pedestrian surface matting (644.1440) | SF | 72 | $3.70 | $4.00 | $3.70 |
| 134 | Temporary pedestrian barricade (644.1810) | LF | 85 | $7.00 | $8.00 | $7.00 |
| 135 | Temporary audible message devices (644.1900.S) | DAY | 12 | $10.00 | $11.00 | $10.00 |
| 136 | Geotextile type C (645.0105) | SY | 342 | $6.00 | $3.00 | $4.50 |
| 137 | Geotextile type HR (645.0120) | SY | 614 | $6.00 | $3.00 | $4.17 |
| 138 | Geotextile type R (645.0130) | SY | 3,309 | $5.00 | $2.34 | $3.56 |
| 139 | Geotextile type sas (645.0140) | SY | 41 | $7.00 | $3.00 | $3.41 |
| 140 | Marking line epoxy 4-inch (646.1020) | LF | 122 | $1.00 | $5.00 | $1.00 |
| 141 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 202,095 | $1.19 | $1.39 | $1.19 |
| 142 | Marking removal line water blasting 4-inch (646.9010) | LF | 1,892 | $1.45 | $1.50 | $1.45 |
| 143 | Locating no-passing zones (648.0100) | MI | 9.88 | $518.00 | $510.00 | $518.00 |
| 144 | Construction staking storm sewer (650.4000) | EACH | 6 | $95.00 | $125.00 | $300.00 |
| 145 | Construction staking subgrade (650.4500) | LF | 47,024 | $0.12 | $0.14 | $0.25 |
| 146 | Construction staking base (650.5000) | LF | 47,024 | $0.65 | $0.60 | $1.00 |
| 147 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 1,087 | $1.30 | $1.50 | $3.00 |
| 148 | Construction staking pipe culverts (650.6000) | EACH | 4 | $300.00 | $250.00 | $200.00 |
| 149 | Construction staking structure layout (structure) 01. B-52-0249 (650.6501) | EACH | 1 | $6,000.00 | $6,000.00 | $1.00 |
| 150 | Construction staking concrete barrier (650.7500) | LF | 51 | $105.00 | $10.00 | $10.00 |
| 151 | Construction staking resurfacing reference (650.8000) | LF | 4,762 | $0.15 | $0.13 | $2.00 |
| 152 | Construction staking curb ramps (650.9000) | EACH | 2 | $500.00 | $250.00 | $500.00 |
| 153 | Construction staking sidewalk (project) 01. 5730-00-64 (650.9500) | EACH | 1 | $1,200.00 | $1,600.00 | $1.00 |
| 154 | Construction staking supplemental control (project) 01. 5730-00-64 (650.9911) | EACH | 1 | $8,500.00 | $3,000.00 | $1.00 |
| 155 | Construction staking slope stakes (650.9920) | LF | 47,024 | $0.70 | $0.79 | $0.10 |
| 156 | Temporary traffic signals for bridges (structure) 01. B-52-50 (661.0101) | EACH | 1 | $4,040.00 | $4,500.00 | $4,040.00 |
| 157 | Public land survey monument verify and reset (680.0100) | EACH | 3 | $800.00 | $1,500.00 | $550.00 |
| 158 | Sawing asphalt (690.0150) | LF | 426 | $1.98 | $5.00 | $2.25 |
| 159 | Sawing concrete (690.0250) | LF | 38 | $3.95 | $10.00 | $3.25 |
| 160 | Incentive strength concrete barrier (715.0603) | DOL | 25.50 | $1.00 | $1.00 | $1.00 |
| 161 | Incentive iri ride (740.0440) | DOL | 39,235 | $1.00 | $1.00 | $1.00 |
| 162 | Installing and maintaining bird deterrent system (station) 01. 277+50 (999.2000.S) | EACH | 1 | $6,500.00 | $7,000.00 | $6,500.00 |
| 163 | Installing and maintaining bird deterrent system (station) 02. 464+84 (999.2000.S) | EACH | 1 | $3,000.00 | $4,000.00 | $3,000.00 |
| 164 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,500 | $5.00 | $5.00 | $5.00 |
| 165 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 3,520 | $5.00 | $5.00 | $5.00 |
| 166 | Special 01. cleaning and painting piling (SPV.0060) | EACH | 16 | $1,388.00 | $1,400.00 | $1,388.00 |
| 167 | Special 02. temporary water diversion B-52-0249 (SPV.0060) | EACH | 1 | $70,000 | $5,000.00 | $41,603 |
| 168 | Special 03. adjusting water service curb stop (SPV.0060) | EACH | 2 | $100.00 | $400.00 | $1,071.75 |
| 169 | Special 04. adjusting sanitary service cleanout covers (SPV.0060) | EACH | 1 | $100.00 | $500.00 | $1,131.94 |
| 170 | Special 05. research and locate existing land parcel monuments (SPV.0060) | EACH | 10 | $200.00 | $2,000.00 | $200.00 |
| 171 | Special 06. verify and replace existing land parcel monuments (SPV.0060) | EACH | 10 | $360.00 | $2,000.00 | $200.00 |
| 172 | Special 07. removing and salvaging wooden stairs, platform, and railing (SPV.0060) | EACH | 1 | $1,000.00 | $5,000.00 | $6,373.03 |
| 173 | Special 01. concrete curb & gutter 30-inch curb head 4-inch (SPV.0090) | LF | 6 | $75.70 | $70.00 | $75.47 |
| 174 | Special 02. concrete curb & gutter 24-inch type D (SPV.0090) | LF | 5 | $74.02 | $70.00 | $74.02 |
| 175 | Special 01. removing distressed pavement milling (SPV.0180) | SY | 1,163 | $9.59 | $11.00 | $9.59 |
| 176 | Special 02. weed free mulch (SPV.0180) | SY | 3,810 | $1.45 | $0.77 | $1.45 |
| 177 | Special 03. removing and salvaging landscaping block (SPV.0180) | SY | 21 | $50.00 | $31.00 | $510.00 |
| 178 | Special 01. shot rock (SPV.0195) | TON | 2,324 | $50.00 | $25.00 | $31.67 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of August 11, 2026. Compiled by Mirage Metrics.