WisDOT contract 20260811014 bid tabulation
Abbotsford - Wausau; CTH E South to STH 97, Wb (STH 029, Marathon County Abbotsford - Wausau). Let by Wisconsin DOT on August 11, 2026, Marathon. 7 bids received; low bid $5,481,730 by James Peterson Sons, Inc..
- Owner
- Wisconsin DOT
- Letting
- 11 AUG 2026
- Pay items
- 95
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | James Peterson Sons, Inc. | $5,481,730 | Low |
| 2 | Trierweiler Construction & Supply Company, Inc. | $5,504,085 | 0.0% |
| 3 | Hoffman Construction Company | $5,539,482 | +1.0% |
| 4 | Haas Sons, Inc. | $5,589,097 | +2.0% |
| 5 | Zignego Company, Inc. | $5,877,314 | +7.0% |
| 6 | Michels Road & Stone, Inc. | $6,300,428 | +15% |
| 7 | Integrity Grading and Excavating, Inc. | $6,359,766 | +16% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. James Peterson Sons, Inc. | 2. Trierweiler Construction & Supply Company, Inc. | 3. Hoffman Construction Company | 4. Haas Sons, Inc. | 5. Zignego Company, Inc. | 6. Michels Road & Stone, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing small pipe culverts (203.0100) | EACH | 1 | $1,250.00 | $1,250.00 | $1,000.00 | $500.00 | $1,250.00 | $600.00 |
| 2 | Removing concrete pavement (204.0100) | SY | 37,730 | $0.65 | $0.65 | $5.00 | $3.50 | $0.65 | $0.80 |
| 3 | Removing asphaltic surface (204.0110) | SY | 360 | $4.00 | $4.00 | $5.00 | $2.00 | $4.00 | $6.00 |
| 4 | Removing curb & gutter (204.0150) | LF | 300 | $2.25 | $2.25 | $5.00 | $4.00 | $2.25 | $4.00 |
| 5 | Removing delineators and markers (204.0180) | EACH | 34 | $20.00 | $20.00 | $20.00 | $20.00 | $20.00 | $20.00 |
| 6 | Removing inlets (204.0220) | EACH | 1 | $500.00 | $500.00 | $500.00 | $186.74 | $500.00 | $800.00 |
| 7 | Removing storm sewer (size) 01. 18-inch (204.0245) | LF | 8 | $100.00 | $100.00 | $25.00 | $50.00 | $100.00 | $26.00 |
| 8 | Removing (item description) 01. buried concrete pavement (204.9180.S) | SY | 9,390 | $1.50 | $1.50 | $5.00 | $0.50 | $1.50 | $3.00 |
| 9 | Excavation common (205.0100) | CY | 72,285 | $9.56 | $9.56 | $10.00 | $10.75 | $9.56 | $9.35 |
| 10 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 11 | $120.00 | $120.00 | $150.00 | $400.00 | $1.00 | $190.00 |
| 11 | Finishing roadway (project) 01. 1053-07-85 (213.0100) | EACH | 1 | $2,500.00 | $1,000.00 | $100.00 | $500.00 | $1,000.00 | $5,000.00 |
| 12 | Base aggregate dense 3/4-inch (305.0110) | TON | 7,210 | $18.38 | $18.38 | $0.01 | $19.00 | $18.38 | $21.95 |
| 13 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 34,700 | $12.84 | $12.84 | $0.01 | $13.50 | $12.84 | $11.10 |
| 14 | Select crushed material (312.0110) | TON | 56,818 | $14.57 | $14.57 | $0.01 | $12.25 | $14.57 | $15.95 |
| 15 | Concrete pavement gaps (415.0210) | EACH | 2 | $569.87 | $569.87 | $569.87 | $569.87 | $1,000.00 | $750.00 |
| 16 | Rout and seal (415.6000.S) | LF | 27,250 | $1.06 | $1.06 | $1.06 | $1.06 | $0.95 | $0.95 |
| 17 | Drilled dowel bars (416.0620) | EACH | 34 | $15.52 | $15.52 | $15.52 | $15.52 | $30.00 | $20.72 |
| 18 | HMA cold weather paving (450.4000) | TON | 995 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 |
| 19 | Tack coat (455.0605) | GAL | 716 | $6.35 | $6.35 | $6.35 | $6.35 | $6.35 | $6.35 |
| 20 | Incentive density HMA pavement (460.2000) | DOL | 2,560 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 21 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 3,970 | $117.05 | $117.05 | $117.05 | $117.05 | $117.05 | $117.05 |
| 22 | Asphaltic flumes (465.0315) | SY | 42 | $56.95 | $56.95 | $56.95 | $56.95 | $56.95 | $56.95 |
| 23 | Asphaltic rumble strips, shoulder divided roadway (465.0510) | LF | 15,060 | $0.43 | $0.39 | $0.39 | $0.31 | $0.31 | $0.39 |
| 24 | Apron endwalls for culvert pipe 18- inch (520.1018) | EACH | 2 | $290.00 | $290.00 | $750.00 | $800.00 | $290.00 | $930.00 |
| 25 | Culvert pipe class III-A 18-inch (520.3318) | LF | 38 | $74.00 | $74.00 | $75.00 | $50.00 | $74.00 | $122.00 |
| 26 | Apron endwalls for culvert pipe sloped side drains steel 18-inch 6 to 1 (521.1518) | EACH | 1 | $1,000.00 | $1,000.00 | $1,750.00 | $2,750.00 | $1,000.00 | $2,200.00 |
| 27 | Apron endwalls for culvert pipe salvaged 18-inch (524.0618) | EACH | 1 | $1,250.00 | $1,250.00 | $750.00 | $1,500.00 | $1,250.00 | $730.00 |
| 28 | Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553) | LF | 302 | $51.89 | $51.89 | $51.89 | $51.89 | $60.00 | $75.00 |
| 29 | Concrete rumble strips, shoulder divided roadway (602.3210) | LF | 11,710 | $0.90 | $0.87 | $0.87 | $0.78 | $0.78 | $0.87 |
| 30 | Riprap light (606.0100) | CY | 27 | $110.00 | $110.00 | $125.00 | $89.00 | $110.00 | $125.00 |
| 31 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 720 | $2.58 | $2.58 | $10.00 | $9.50 | $2.58 | $7.00 |
| 32 | Maintenance and repair of haul roads (project) 01. 1053-07-85 (618.0100) | EACH | 1 | $500.00 | $0.01 | $100.00 | $100.00 | $1.00 | $0.01 |
| 33 | Mobilization (619.1000) | EACH | 1 | $448,510 | $459,941 | $1,614,883 | $325,000 | $344,000 | $626,050 |
| 34 | Water (624.0100) | MGAL | 1,115 | $5.00 | $5.00 | $0.01 | $40.00 | $5.00 | $50.00 |
| 35 | Topsoil (625.0100) | SY | 13,480 | $2.30 | $2.30 | $2.00 | $3.65 | $2.30 | $3.50 |
| 36 | Mobilizations erosion control (628.1905) | EACH | 8 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 37 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 38 | Erosion mat urban class I type B (628.2008) | SY | 13,480 | $1.75 | $1.75 | $1.75 | $1.75 | $1.75 | $1.75 |
| 39 | Inlet protection type A (628.7005) | EACH | 8 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 |
| 40 | Temporary ditch checks (628.7504) | LF | 154 | $8.25 | $8.25 | $8.25 | $8.25 | $8.25 | $8.25 |
| 41 | Culvert pipe checks (628.7555) | EACH | 92 | $22.00 | $22.00 | $22.00 | $22.00 | $22.00 | $22.00 |
| 42 | Tracking pads (628.7560) | EACH | 3 | $500.00 | $500.00 | $100.00 | $150.00 | $500.00 | $1,200.00 |
| 43 | Rock bags (628.7570) | EACH | 20 | $8.00 | $8.00 | $8.00 | $8.00 | $8.00 | $8.00 |
| 44 | Fertilizer type B (629.0210) | CWT | 64.10 | $85.00 | $85.00 | $85.00 | $85.00 | $85.00 | $85.00 |
| 45 | Seeding mixture no. 30 (630.0130) | LB | 2,112 | $6.25 | $6.25 | $6.25 | $6.25 | $6.25 | $6.25 |
| 46 | Seeding borrow pit (630.0300) | LB | 345 | $5.95 | $5.95 | $5.95 | $5.95 | $5.95 | $5.95 |
| 47 | Seed water (630.0500) | MGAL | 1,060 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 48 | Delineator posts steel (633.0100) | EACH | 38 | $50.00 | $50.00 | $50.00 | $50.00 | $50.00 | $50.00 |
| 49 | Delineator reflectors (633.0500) | EACH | 38 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 50 | Delineators temporary (633.1100) | EACH | 69 | $18.00 | $18.00 | $45.00 | $45.00 | $45.00 | $18.00 |
| 51 | Markers culvert end (633.5200) | EACH | 3 | $85.00 | $85.00 | $85.00 | $85.00 | $85.00 | $85.00 |
| 52 | Markers permanent flexible (633.5350) | EACH | 60 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 |
| 53 | Moving signs type II (638.2102) | EACH | 1 | $150.00 | $150.00 | $150.00 | $150.00 | $150.00 | $150.00 |
| 54 | Field office type C (642.5201) | EACH | 1 | $10,000 | $15,000 | $15,000 | $10,000 | $20,000 | $8,700.00 |
| 55 | Traffic control drums (643.0300) | DAY | 32,068 | $0.30 | $0.30 | $0.30 | $0.30 | $0.30 | $0.30 |
| 56 | Traffic control barricades type III (643.0420) | DAY | 3,386 | $0.60 | $0.60 | $0.60 | $0.60 | $0.60 | $0.60 |
| 57 | Traffic control flexible tubular marker posts (643.0500) | EACH | 617 | $26.00 | $26.00 | $26.00 | $26.00 | $26.00 | $26.00 |
| 58 | Traffic control flexible tubular marker bases (643.0600) | EACH | 617 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 |
| 59 | Traffic control warning lights type A (643.0705) | DAY | 5,944 | $0.05 | $0.05 | $0.05 | $0.05 | $0.05 | $0.05 |
| 60 | Traffic control warning lights type C (643.0715) | DAY | 8,344 | $0.05 | $0.05 | $0.05 | $0.05 | $0.05 | $0.05 |
| 61 | Traffic control connected arrow boards (643.0810) | DAY | 230 | $18.00 | $18.00 | $18.00 | $18.00 | $18.00 | $18.00 |
| 62 | Traffic control signs (643.0900) | DAY | 9,382 | $0.60 | $0.60 | $0.60 | $0.60 | $0.60 | $0.60 |
| 63 | Traffic control covering signs type II (643.0920) | EACH | 24 | $20.00 | $20.00 | $20.00 | $20.00 | $20.00 | $20.00 |
| 64 | Traffic control signs fixed message (643.1000) | SF | 97 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 |
| 65 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 230 | $7.00 | $7.00 | $7.00 | $7.00 | $7.00 | $7.00 |
| 66 | Temporary marking line removable tape 6-inch (643.3180) | LF | 55,568 | $1.90 | $1.90 | $1.90 | $1.90 | $1.90 | $1.90 |
| 67 | Temporary marking line removable tape 10-inch (643.3280) | LF | 200 | $2.86 | $2.86 | $2.86 | $2.86 | $2.86 | $2.86 |
| 68 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 40 | $5.25 | $5.25 | $5.25 | $5.25 | $5.25 | $5.25 |
| 69 | Traffic control (643.5000) | EACH | 1 | $22,423 | $22,423 | $22,423 | $22,423 | $22,423 | $22,423 |
| 70 | Geotextile type R (645.0130) | SY | 120 | $10.00 | $10.00 | $10.00 | $5.50 | $10.00 | $4.00 |
| 71 | Geotextile type sas (645.0140) | SY | 62,780 | $0.98 | $0.98 | $2.00 | $2.35 | $0.98 | $2.10 |
| 72 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 9,710 | $0.85 | $0.85 | $0.85 | $0.85 | $1.20 | $0.85 |
| 73 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 53,290 | $1.39 | $1.39 | $1.39 | $1.39 | $1.60 | $1.39 |
| 74 | Marking line grooved permanent tape 6-inch (646.2050) | LF | 9,710 | $7.05 | $7.05 | $7.05 | $7.05 | $7.75 | $7.05 |
| 75 | Marking line grooved permanent tape 10-inch (646.4050) | LF | 4,420 | $11.65 | $11.65 | $11.65 | $11.65 | $13.25 | $11.65 |
| 76 | Cold weather marking epoxy 6-inch (646.6466) | LF | 13,324 | $0.55 | $0.55 | $0.55 | $0.55 | $0.35 | $0.55 |
| 77 | Marking removal line water blasting 4-inch (646.9010) | LF | 2,535 | $1.06 | $1.06 | $1.25 | $1.06 | $1.06 | $1.06 |
| 78 | Marking removal line water blasting 6-inch (646.9012) | LF | 785 | $2.10 | $2.10 | $1.90 | $2.10 | $2.10 | $2.10 |
| 79 | Marking removal line water blasting 10-inch (646.9112) | LF | 458 | $3.50 | $3.50 | $3.00 | $3.50 | $3.50 | $3.50 |
| 80 | Construction staking subgrade (650.4500) | LF | 13,092 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 81 | Construction staking base (650.5000) | LF | 1,675 | $0.30 | $1.25 | $1.25 | $0.30 | $0.30 | $0.30 |
| 82 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 302 | $4.00 | $2.50 | $2.50 | $4.00 | $4.00 | $4.00 |
| 83 | Construction staking pipe culverts (650.6000) | EACH | 1 | $120.00 | $250.00 | $250.00 | $120.00 | $120.00 | $120.00 |
| 84 | Construction staking concrete pavement (650.7000) | LF | 13,092 | $0.50 | $0.70 | $0.70 | $0.50 | $0.50 | $0.50 |
| 85 | Construction staking supplemental control (project) 01. 1053-07-85 (650.9911) | EACH | 1 | $10.00 | $3,640.93 | $3,640.93 | $10.00 | $10.00 | $10.00 |
| 86 | Construction staking slope stakes (650.9920) | LF | 13,092 | $0.65 | $0.75 | $0.01 | $0.65 | $0.65 | $0.65 |
| 87 | Public land survey monument verify and reset (680.0100) | EACH | 5 | $590.00 | $600.00 | $600.00 | $590.00 | $590.00 | $590.00 |
| 88 | Sawing asphalt (690.0150) | LF | 3,342 | $1.35 | $1.35 | $1.35 | $1.35 | $1.95 | $1.35 |
| 89 | Sawing concrete (690.0250) | LF | 1,095 | $2.25 | $2.25 | $2.25 | $2.25 | $2.55 | $2.25 |
| 90 | Incentive flexural strength concrete pavement (715.0715) | DOL | 11,343 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 91 | Incentive iri ride (740.0440) | DOL | 9,918 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 92 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,400 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 93 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 2,760 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 94 | Special 01. grading and shaping ditch (SPV.0090) | LF | 1,065 | $6.00 | $6.00 | $10.00 | $11.00 | $6.00 | $5.00 |
| 95 | Special 01. HP concrete pavement 10-inch (SPV.0180) | SY | 37,810 | $44.89 | $44.89 | $44.89 | $44.89 | $57.21 | $56.61 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of August 11, 2026. Compiled by Mirage Metrics.