| 1 | Clearing (201.0105) | STA | 2 | $750.00 | $2,500.00 |
| 2 | Grubbing (201.0205) | STA | 2 | $500.00 | $2,500.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 21 | $1,200.00 | $1,600.00 |
| 4 | Removing structure (structure) 01. B-37-187 (203.0220) | EACH | 1 | $4,700.00 | $10,000 |
| 5 | Removing asphaltic surface butt joints (204.0115) | SY | 940 | $8.80 | $8.80 |
| 6 | Removing asphaltic surface milling (204.0120) | SY | 171,300 | $2.27 | $2.27 |
| 7 | Removing curb & gutter (204.0150) | LF | 192 | $8.00 | $15.00 |
| 8 | Removing guardrail (204.0165) | LF | 1,688 | $2.00 | $3.50 |
| 9 | Removing delineators and markers (204.0180) | EACH | 34 | $15.00 | $21.00 |
| 10 | Removing masonry (204.0185) | CY | 14 | $487.00 | $200.00 |
| 11 | Removing surface drains (204.0190) | EACH | 2 | $600.00 | $500.00 |
| 12 | Excavation common (205.0100) | CY | 16,200 | $12.30 | $16.00 |
| 13 | Excavation for structures bridges (structure) 01. B-37-187 (206.1001) | EACH | 1 | $5,000.00 | $3,500.00 |
| 14 | Backfill granular grade 1 (209.1100) | CY | 1,900 | $23.80 | $30.00 |
| 15 | Backfill structure type A (210.1500) | TON | 80 | $51.00 | $30.00 |
| 16 | Prepare foundation for asphaltic paving (project) 01. 6610-00-71 (211.0101) | EACH | 1 | $36,510 | $132,770 |
| 17 | Prepare foundation for asphaltic shoulders 01. 6610-00-71 (211.0400) | STA | 23 | $282.85 | $282.85 |
| 18 | Base aggregate dense 3/4-inch (305.0110) | TON | 5,880 | $20.80 | $28.50 |
| 19 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 13,950 | $19.15 | $19.50 |
| 20 | Drilled tie bars (416.0610) | EACH | 3 | $16.19 | $17.00 |
| 21 | Tack coat (455.0605) | GAL | 22,090 | $3.70 | $3.70 |
| 22 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 2 | $4,500.00 | $4,500.00 |
| 23 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 2 | $4,500.00 | $4,500.00 |
| 24 | Incentive density HMA pavement (460.2000) | DOL | 859 | $1.00 | $1.00 |
| 25 | Incentive density PWL HMA pavement (460.2005) | DOL | 37,531 | $1.00 | $1.00 |
| 26 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 9,560 | $1.00 | $1.00 |
| 27 | Incentive air voids HMA pavement (460.2010) | DOL | 39,521 | $1.00 | $1.00 |
| 28 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 22,680 | $85.50 | $85.50 |
| 29 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 17,290 | $92.95 | $92.95 |
| 30 | HMA pavement 4 MT 58-28 H (460.6424) | TON | 410 | $117.25 | $117.25 |
| 31 | Asphaltic surface (465.0105) | TON | 3,020 | $131.85 | $131.85 |
| 32 | Asphaltic surface patching (465.0110) | TON | 100 | $142.85 | $142.85 |
| 33 | Asphaltic curb (465.0310) | LF | 44 | $36.85 | $36.85 |
| 34 | Asphaltic flumes (465.0315) | SY | 23 | $122.35 | $122.35 |
| 35 | Asphaltic rumble strips, centerline (465.0560) | LF | 40,030 | $0.60 | $0.52 |
| 36 | Concrete masonry bridges (502.0100) | CY | 7 | $2,000.00 | $2,600.00 |
| 37 | Pigmented surface sealer (502.3210) | SY | 7 | $31.00 | $27.00 |
| 38 | Adhesive anchors no. 4 bar (502.4204) | EACH | 4 | $45.00 | $35.00 |
| 39 | Adhesive anchors no. 6 bar (502.4206) | EACH | 19 | $45.00 | $40.00 |
| 40 | Bar steel reinforcement HS coated structures (505.0600) | LB | 1,020 | $2.70 | $5.00 |
| 41 | Rubberized membrane waterproofing (516.0500) | SY | 3 | $68.00 | $90.00 |
| 42 | Apron endwalls for culvert pipe 24- inch (520.1024) | EACH | 4 | $272.00 | $750.00 |
| 43 | Apron endwalls for culvert pipe 30- inch (520.1030) | EACH | 2 | $367.00 | $1,100.00 |
| 44 | Culvert pipe class III-A non-metal 24-inch (520.3424) | LF | 204 | $146.30 | $150.00 |
| 45 | Culvert pipe class III-A non-metal 30-inch (520.3430) | LF | 72 | $190.16 | $160.00 |
| 46 | Cleaning culvert pipes (520.8700) | EACH | 2 | $1,133.00 | $2,500.00 |
| 47 | Culvert pipe reinforced concrete class IV 24-inch (522.0424) | LF | 290 | $218.76 | $264.00 |
| 48 | Culvert pipe reinforced concrete class IV 30-inch (522.0430) | LF | 122 | $269.05 | $310.00 |
| 49 | Culvert pipe reinforced concrete class IV 36-inch (522.0436) | LF | 310 | $335.20 | $355.00 |
| 50 | Culvert pipe reinforced concrete class IV 42-inch (522.0442) | LF | 86 | $386.68 | $400.00 |
| 51 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 1 | $1,473.41 | $2,100.00 |
| 52 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 10 | $1,631.08 | $2,500.00 |
| 53 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 4 | $1,873.45 | $2,200.00 |
| 54 | Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036) | EACH | 10 | $2,492.89 | $2,900.00 |
| 55 | Apron endwalls for culvert pipe reinforced concrete 42-inch (522.1042) | EACH | 2 | $2,915.01 | $3,500.00 |
| 56 | Culvert pipe reinforced concrete horizontal elliptical class HE-III 48X76-inch (522.2348) | LF | 116 | $581.42 | $620.00 |
| 57 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 24X38-inch (522.2424) | LF | 58 | $350.57 | $370.00 |
| 58 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 29X45-inch (522.2429) | LF | 108 | $408.32 | $450.00 |
| 59 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 24X38-inch (522.2624) | EACH | 2 | $2,143.75 | $2,400.00 |
| 60 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 29X45-inch (522.2629) | EACH | 4 | $2,560.91 | $3,000.00 |
| 61 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 48X76-inch (522.2648) | EACH | 4 | $4,576.45 | $5,500.00 |
| 62 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 176 | $72.17 | $72.00 |
| 63 | Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588) | LF | 112 | $72.17 | $72.00 |
| 64 | Concrete surface drains (602.3010) | CY | 2 | $1,581.39 | $1,600.00 |
| 65 | Concrete barrier type S36 (603.1136) | LF | 635 | $152.60 | $152.00 |
| 66 | Slope paving crushed aggregate (604.0500) | SY | 655 | $28.33 | $48.00 |
| 67 | Riprap heavy (606.0300) | CY | 21 | $200.00 | $120.00 |
| 68 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 129 | $199.39 | $120.00 |
| 69 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 56 | $203.11 | $130.00 |
| 70 | Inlet covers type BW (611.0610) | EACH | 2 | $1,000.00 | $1,500.00 |
| 71 | Inlets 2X2.5-FT (611.3225) | EACH | 2 | $1,229.73 | $3,100.00 |
| 72 | Barrier system grading shaping finishing (614.0010) | EACH | 8 | $3,385.00 | $1,500.00 |
| 73 | MGS guardrail 3 (614.2300) | LF | 225 | $26.33 | $29.00 |
| 74 | MGS guardrail 3 K (614.2330) | LF | 150 | $42.33 | $41.00 |
| 75 | MGS thrie beam transition (614.2500) | LF | 300 | $87.00 | $96.00 |
| 76 | MGS guardrail terminal eat (614.2610) | EACH | 8 | $3,233.00 | $4,000.00 |
| 77 | Maintenance and repair of haul roads (project) 01. 6610-00-71 (618.0100) | EACH | 1 | $100.00 | $100.00 |
| 78 | Mobilization (619.1000) | EACH | 1 | $463,480 | $422,000 |
| 79 | Water (624.0100) | MGAL | 290 | $1.00 | $35.00 |
| 80 | Topsoil (625.0100) | SY | 5,440 | $4.05 | $5.00 |
| 81 | Mulching (627.0200) | SY | 1,230 | $0.50 | $0.50 |
| 82 | Silt fence (628.1504) | LF | 10,910 | $1.63 | $2.10 |
| 83 | Silt fence maintenance (628.1520) | LF | 21,820 | $0.03 | $0.01 |
| 84 | Mobilizations erosion control (628.1905) | EACH | 12 | $153.00 | $350.00 |
| 85 | Mobilizations emergency erosion control (628.1910) | EACH | 6 | $193.00 | $200.00 |
| 86 | Erosion mat urban class I type B (628.2008) | SY | 4,460 | $1.70 | $2.10 |
| 87 | Inlet protection type A (628.7005) | EACH | 2 | $100.00 | $120.00 |
| 88 | Inlet protection type C (628.7015) | EACH | 2 | $65.00 | $100.00 |
| 89 | Culvert pipe checks (628.7555) | EACH | 86 | $10.00 | $20.00 |
| 90 | Rock bags (628.7570) | EACH | 90 | $7.00 | $15.00 |
| 91 | Fertilizer type B (629.0210) | CWT | 7 | $100.00 | $100.00 |
| 92 | Seeding mixture no. 30 (630.0130) | LB | 450 | $7.33 | $8.00 |
| 93 | Seed water (630.0500) | MGAL | 230 | $1.00 | $5.00 |
| 94 | Delineators barrier wall (633.1000) | EACH | 7 | $233.00 | $65.00 |
| 95 | Markers culvert end (633.5200) | EACH | 43 | $68.00 | $40.00 |
| 96 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 16 | $98.00 | $160.00 |
| 97 | Posts tubular steel 2X2-inch X 12- FT (634.0812) | EACH | 1 | $300.00 | $500.00 |
| 98 | Signs type II reflective H (637.2210) | SF | 3 | $35.00 | $25.00 |
| 99 | Signs type II reflective F (637.2230) | SF | 60 | $25.00 | $25.00 |
| 100 | Moving signs type II (638.2102) | EACH | 9 | $75.00 | $120.00 |
| 101 | Moving small sign supports (638.4000) | EACH | 11 | $75.00 | $125.00 |
| 102 | Field office type B (642.5001) | EACH | 1 | $11,910 | $15,000 |
| 103 | Traffic control drums (643.0300) | DAY | 2,900 | $0.25 | $0.40 |
| 104 | Traffic control barricades type III (643.0420) | DAY | 5,065 | $0.50 | $1.00 |
| 105 | Traffic control warning lights type A (643.0705) | DAY | 9,150 | $0.01 | $0.15 |
| 106 | Traffic control signs (643.0900) | DAY | 16,710 | $0.40 | $0.70 |
| 107 | Traffic control covering signs type I (643.0910) | EACH | 10 | $100.00 | $400.00 |
| 108 | Traffic control covering signs type II (643.0920) | EACH | 7 | $37.00 | $25.00 |
| 109 | Traffic control signs fixed message (643.1000) | SF | 136 | $11.00 | $12.00 |
| 110 | Temporary marking line paint 6- inch (643.3165) | LF | 111,627 | $0.46 | $0.58 |
| 111 | Traffic control (643.5000) | EACH | 1 | $19,600 | $10,000 |
| 112 | Geotextile type HR (645.0120) | SY | 62 | $10.00 | $10.00 |
| 113 | Marking line epoxy 6-inch (646.2020) | LF | 3,110 | $0.75 | $0.75 |
| 114 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 132,470 | $1.15 | $1.15 |
| 115 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 208 | $2.30 | $2.50 |
| 116 | Marking symbol epoxy (646.5220) | EACH | 2 | $190.00 | $200.00 |
| 117 | Marking stop line epoxy 18-inch (646.6120) | LF | 93 | $23.00 | $23.00 |
| 118 | Marking diagonal epoxy 12-inch (646.7120) | LF | 245 | $11.00 | $11.00 |
| 119 | Marking parking stall epoxy (646.8320) | LF | 1,072 | $9.30 | $9.50 |
| 120 | Construction staking storm sewer (650.4000) | EACH | 3 | $120.00 | $200.00 |
| 121 | Construction staking subgrade (650.4500) | LF | 490 | $0.01 | $1.00 |
| 122 | Construction staking base (650.5000) | LF | 490 | $1.00 | $1.00 |
| 123 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 288 | $4.00 | $1.00 |
| 124 | Construction staking pipe culverts (650.6000) | EACH | 21 | $275.00 | $175.00 |
| 125 | Construction staking concrete barrier (650.7500) | LF | 635 | $1.75 | $1.00 |
| 126 | Construction staking resurfacing reference (650.8000) | LF | 47,277 | $0.10 | $0.15 |
| 127 | Construction staking supplemental control (project) 01. 6610-00-71 (650.9911) | EACH | 1 | $1,535.15 | $1,000.00 |
| 128 | Construction staking slope stakes (650.9920) | LF | 490 | $2.60 | $1.00 |
| 129 | Public land survey monument verify and reset (680.0100) | EACH | 7 | $500.00 | $1,000.00 |
| 130 | Sawing asphalt (690.0150) | LF | 2,233 | $3.35 | $3.00 |
| 131 | Sawing concrete (690.0250) | LF | 50 | $10.40 | $8.00 |
| 132 | Incentive strength concrete structures (715.0502) | DOL | 500 | $1.00 | $1.00 |
| 133 | Incentive iri ride (740.0440) | DOL | 36,187 | $1.00 | $1.00 |
| 134 | Special 01. temporary water diversion - sta. 53+70 (SPV.0060) | EACH | 1 | $13,560 | $3,500.00 |
| 135 | Special 02. temporary water diversion - sta. 125+43 (SPV.0060) | EACH | 1 | $12,750 | $3,500.00 |
| 136 | Special 03. temporary water diversion - sta. 215+16 (SPV.0060) | EACH | 1 | $8,560.00 | $3,500.00 |
| 137 | Special 04. temporary water diversion - sta. 300+66 (SPV.0060) | EACH | 1 | $5,120.00 | $3,500.00 |
| 138 | Special 01. removing distressed asphaltic surface milling (SPV.0180) | SY | 1,000 | $10.50 | $10.50 |