WisDOT contract 20260915018 bid tabulation

1590-14-73. Let by Wisconsin DOT on September 15, 2026, Lincoln. 5 bids received; low bid $5,409,265 by Musson Bros., Inc..

Owner
Wisconsin DOT
Letting
15 SEP 2026
Pay items
186
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Musson Bros., Inc.$5,409,265Low
2James Peterson Sons, Inc.$5,623,052+4.0%
3S & N Incorporated$5,772,721+7.0%
4Hoffman Construction Company$5,997,882+11%
5A-1 Excavating LLC$6,016,569+11%
WisDOT contract 20260915018: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Musson Bros., Inc.2. James Peterson Sons, Inc.3. S & N Incorporated4. Hoffman Construction Company5. A-1 Excavating LLC
1Clearing (201.0105)STA21$650.00$990.00$600.00$990.00$1,040.00
2Clearing (201.0120)ID648$35.00$25.00$45.00$25.00$27.00
3Grubbing (201.0205)STA21$275.00$325.00$600.00$325.00$375.00
4Grubbing (201.0220)ID648$14.00$10.00$15.00$10.00$12.00
5Removing small pipe culverts (203.0100)EACH7$627.09$750.00$1,600.00$2,400.00$1,000.00
6Removing concrete pavement (204.0100)SY1,050$0.01$4.85$13.50$5.00$6.00
7Removing asphaltic surface (204.0110)SY3,600$5.22$2.75$4.00$5.00$3.00
8Removing asphaltic surface butt joints (204.0115)SY350$2.50$2.50$9.00$2.50$3.00
9Removing asphaltic surface milling (204.0120)SY37,000$1.10$1.10$1.07$1.10$1.20
10Removing curb & gutter (204.0150)LF836$8.11$4.00$4.75$5.00$5.00
11Removing delineators and markers (204.0180)EACH23$25.00$25.00$25.00$25.00$30.00
12Removing concrete bases (204.0195)EACH3$496.00$500.00$496.00$496.00$696.00
13Removing utility poles (204.0205)EACH1$467.00$467.00$467.00$467.00$667.00
14Removing manholes (204.0210)EACH1$627.15$750.00$600.00$350.00$600.00
15Removing inlets (204.0220)EACH1$627.15$500.00$400.00$350.00$600.00
16Removing storm sewer (size) 01. 12-inch (204.0245)LF20$10.45$26.75$18.00$13.50$20.00
17Removing storm sewer (size) 02. 18-inch (204.0245)LF80$10.45$26.75$17.00$13.50$20.00
18Removing storm sewer (size) 03. 24-inch (204.0245)LF33$10.45$26.75$30.00$13.50$30.00
19Removing storm sewer (size) 04. 30-inch (204.0245)LF16$20.91$26.75$40.00$13.50$30.00
20Excavation common (205.0100)CY35,151$8.80$14.05$11.20$20.00$10.00
21Borrow (208.0100)CY27,073$0.01$11.85$14.16$1.00$24.00
22Prepare foundation for asphaltic paving (project) 01. 1590-14-73 (211.0101)EACH1$500.00$1.00$1.00$1.00$36,650
23Prepare foundation for asphaltic shoulders (211.0400)STA210$25.00$25.00$72.25$25.00$26.00
24Finishing roadway (project) 01. 1590-14-73 (213.0100)EACH1$500.00$1,000.00$950.00$100.00$500.00
25Finishing roadway (project) 02. 1590-14-75 (213.0100)EACH1$500.00$1,000.00$950.00$100.00$500.00
26Finishing roadway (project) 03. 1590-14-76 (213.0100)EACH1$500.00$1,000.00$950.00$100.00$500.00
27Obliterating old road (214.0100)STA4.90$382.29$1,500.00$500.00$350.00$700.00
28Base aggregate dense 3/4-inch (305.0110)TON3,740$6.02$25.00$26.15$40.00$26.00
29Base aggregate dense 1 1/4-inch (305.0120)TON37,630$16.74$17.60$20.55$25.00$21.00
30Coloring concrete wisdot red (405.0100)CY387$90.53$90.53$90.53$90.53$94.00
31Concrete truck apron 12-inch (415.2010)SY1,158$105.88$105.88$105.88$105.88$109.00
32HMA cold weather paving (450.4000)TON4,730$0.50$0.50$0.50$0.50$0.70
33Tack coat (455.0605)GAL5,414$4.00$4.00$4.00$4.00$4.20
34Incentive density HMA pavement (460.2000)DOL7,950$1.00$1.00$1.00$1.00$1.00
35HMA pavement 4 MT 58-28 S (460.6224)TON5,253$85.00$85.00$85.00$85.00$86.00
36HMA pavement 3 HT 58-28 S (460.7223)TON5,285$91.40$91.40$91.40$91.40$92.00
37HMA pavement 4 HT 58-34 H (460.7444)TON2,375$98.00$98.00$98.00$98.00$99.00
38Asphaltic surface (465.0105)TON610$85.00$85.00$85.00$85.00$88.00
39Asphaltic surface patching (465.0110)TON110$120.00$120.00$120.00$120.00$160.00
40Asphaltic surface driveways and field entrances (465.0120)TON40$120.00$120.00$120.00$120.00$160.25
41Asphaltic surface temporary (465.0125)TON1,555$98.00$98.00$98.00$98.00$112.80
42Asphaltic flumes (465.0315)SY122$25.00$25.00$25.00$25.00$36.00
43Asphaltic rumble strips, shoulder (465.0520)LF22,647$0.22$0.25$0.56$0.36$0.50
44Asphaltic rumble strips, centerline (465.0560)LF6,933$0.22$0.25$0.56$0.68$1.00
45Apron endwalls for culvert pipe 30- inch (520.1030)EACH1$1,104.63$900.00$1,095.00$1,100.00$1,110.00
46Apron endwalls for culvert pipe 36- inch (520.1036)EACH2$1,519.42$1,269.00$1,185.00$1,300.00$1,580.00
47Culvert pipe class III-A 18-inch (520.3318)LF111$57.51$87.75$75.55$70.00$67.00
48Culvert pipe class III-A 30-inch (520.3330)LF6$106.09$250.75$216.40$404.00$160.00
49Culvert pipe class III-B 36-inch (520.3536)LF267$140.93$184.00$96.40$144.00$125.00
50Concrete collars for pipe (520.8000)EACH2$1,173.84$750.00$975.00$1,250.00$1,500.00
51Apron endwalls for culvert pipe sloped side drains steel 18-inch 6 to 1 (521.1518)EACH8$1,532.50$1,312.00$975.00$2,000.00$1,925.00
52Apron endwalls for culvert pipe sloped side drains steel 24-inch 6 to 1 (521.1524)EACH2$2,306.58$1,960.00$2,250.00$2,700.00$2,475.00
53Culvert pipe reinforced concrete class III 30-inch (522.0130)LF10$278.57$242.50$288.40$194.00$180.00
54Culvert pipe reinforced concrete class IV 15-inch (522.0415)LF34$131.85$122.50$115.75$92.00$109.00
55Culvert pipe reinforced concrete class IV 24-inch (522.0424)LF254$133.53$151.75$91.85$116.00$105.00
56Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012)EACH9$1,334.22$858.00$1,280.00$1,822.00$1,870.00
57Apron endwalls for culvert pipe reinforced concrete 15-inch (522.1015)EACH4$1,413.30$923.00$965.00$1,906.00$1,990.00
58Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024)EACH3$1,753.00$1,305.00$1,615.00$2,260.00$2,370.00
59Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030)EACH1$2,349.26$1,588.00$1,880.00$2,700.00$5,165.00
60Apron endwalls for culvert pipe salvaged 30-inch (524.0630)EACH1$1,535.56$554.00$1,100.00$1,060.00$1,100.00
61Concrete gutter 24-inch (601.0205)LF82$78.04$78.04$78.04$78.04$79.00
62Concrete curb & gutter 18-inch type A (601.0405)LF478$41.03$41.03$41.03$41.03$42.00
63Concrete curb & gutter 30-inch type D (601.0411)LF3,374$25.96$25.96$25.96$25.96$26.50
64Concrete curb & gutter 4-inch sloped 36-inch type A (601.0551)LF421$34.80$34.80$34.80$34.80$36.00
65Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553)LF2,858$27.92$27.92$27.92$27.92$28.50
66Concrete curb & gutter 4-inch sloped 30-inch type R (601.0581)LF672$45.14$45.14$45.14$45.14$47.00
67Concrete curb pedestrian (601.0600)LF310$40.72$40.72$40.72$40.72$42.00
68Concrete sidewalk 4-inch (602.0405)SF32,960$7.66$7.66$7.66$7.66$8.00
69Concrete sidewalk 6-inch (602.0415)SF220$17.70$17.70$17.70$17.70$19.00
70Curb ramp detectable warning field natural patina (602.0515)SF496$60.38$60.38$60.38$60.38$61.50
71Riprap medium (606.0200)CY160$160.94$102.00$160.00$150.00$140.00
72Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF558$134.74$113.32$77.35$75.00$86.00
73Storm sewer pipe reinforced concrete class IV 24-inch (608.0424)LF29$171.01$130.00$111.35$150.00$138.00
74Inlet covers type H (611.0624)EACH2$1,832.37$1,281.00$875.00$1,100.00$1,225.00
75Inlet covers type HM (611.0627)EACH2$1,832.37$1,281.00$875.00$1,100.00$1,225.00
76Inlet covers type HM-S (611.0636)EACH6$1,832.37$1,281.00$875.00$1,100.00$1,225.00
77Inlet covers type H-S (611.0639)EACH6$1,832.37$1,281.00$875.00$1,100.00$1,225.00
78Inlet covers type T (611.0652)EACH4$2,150.89$1,679.00$1,205.00$1,500.00$1,510.00
79Manholes 5-FT diameter (611.2005)EACH1$4,579.53$4,222.00$4,300.00$5,500.00$6,020.00
80Inlets 4-FT diameter (611.3004)EACH2$3,184.70$2,981.00$3,345.50$3,800.00$3,720.00
81Inlets 2X2.5-FT (611.3225)EACH4$1,633.76$1,535.00$2,115.00$2,000.00$2,250.00
82Inlets 2X3-FT (611.3230)EACH14$2,325.85$1,923.00$2,400.00$2,500.00$2,800.00
83Cover plates temporary (611.8120.S)EACH1$430.56$250.00$950.00$300.00$200.00
84Pipe grates (size) 01. 30-inch (611.9850.S)EACH2$2,604.46$3,010.00$2,600.00$3,200.00$2,300.00
85Pipe grates (size) 02. 36-inch (611.9850.S)EACH2$3,455.59$4,138.00$2,750.00$4,400.00$3,000.00
86Maintenance and repair of haul roads (project) 01. 1590-14-73 (618.0100)EACH1$1.00$500.00$100.00$100.00$500.00
87Mobilization (619.1000)EACH1$860,000$287,000$415,000$486,250$204,047
88Concrete median sloped nose (620.0300)SF952$14.27$14.27$14.27$14.27$15.00
89Water (624.0100)MGAL772$1.00$50.00$1.00$0.01$1.00
90Topsoil (625.0100)SY43,000$0.01$3.50$2.95$2.00$3.00
91Silt fence (628.1504)LF9,400$1.70$1.70$1.70$1.70$1.75
92Silt fence maintenance (628.1520)LF9,400$0.03$0.03$0.03$0.03$0.03
93Mobilizations erosion control (628.1905)EACH20$193.00$193.00$193.00$193.00$213.00
94Mobilizations emergency erosion control (628.1910)EACH14$293.00$293.00$293.00$293.00$313.00
95Erosion mat urban class I type B (628.2008)SY43,000$1.70$1.70$1.70$1.70$1.75
96Inlet protection type A (628.7005)EACH20$125.00$125.00$125.00$125.00$150.00
97Inlet protection type C (628.7015)EACH20$75.00$75.00$75.00$75.00$100.00
98Temporary ditch checks (628.7504)LF290$7.00$7.00$7.00$7.00$9.00
99Culvert pipe checks (628.7555)EACH79$20.00$20.00$20.00$20.00$25.00
100Tracking pads (628.7560)EACH11$1.00$500.00$450.00$500.00$1.00
101Rock bags (628.7570)EACH220$5.00$5.00$5.00$5.00$9.00
102Fertilizer type B (629.0210)CWT45$100.00$100.00$100.00$100.00$110.00
103Seeding mixture no. 30 (630.0130)LB1,860$6.53$6.53$6.53$6.53$8.00
104Seeding temporary (630.0200)LB546$4.33$4.33$4.33$4.33$5.00
105Seed water (630.0500)MGAL2,885$1.00$1.00$1.00$1.00$1.00
106Markers culvert end (633.5200)EACH16$75.00$75.00$75.00$75.00$85.00
107Posts wood 4X6-inch X 14-FT (634.0614)EACH33$100.00$100.00$100.00$100.00$110.00
108Posts wood 4X6-inch X 18-FT (634.0618)EACH25$125.00$125.00$125.00$125.00$135.00
109Posts tubular steel 2X2-inch X 12- FT (634.0812)EACH7$275.00$275.00$275.00$275.00$285.00
110Posts tubular steel 2X2-inch X 14- FT (634.0814)EACH19$275.00$275.00$275.00$275.00$285.00
111Signs type II reflective H (637.2210)SF556.70$20.00$20.00$20.00$20.00$25.00
112Signs type II reflective F (637.2230)SF88.75$30.00$30.00$30.00$30.00$33.00
113Moving signs type II (638.2102)EACH31$100.00$100.00$100.00$100.00$110.00
114Removing signs type II (638.2602)EACH25$25.00$25.00$25.00$25.00$35.00
115Removing small sign supports (638.3000)EACH33$25.00$25.00$25.00$25.00$35.00
116Moving small sign supports (638.4000)EACH28$100.00$100.00$100.00$100.00$110.00
117Field office type C (642.5201)EACH1$25,000$15,000$17,500$25,000$12,000
118Traffic control drums (643.0300)DAY9,000$0.50$0.50$0.50$0.50$0.60
119Traffic control barricades type III (643.0420)DAY3,600$0.55$0.55$0.55$0.55$0.75
120Traffic control warning lights type A (643.0705)DAY6,700$0.10$0.10$0.10$0.10$0.25
121Traffic control warning lights type C (643.0715)DAY1,180$0.10$0.10$0.10$0.10$0.50
122Traffic control signs (643.0900)DAY15,225$0.60$0.60$0.60$0.60$0.65
123Traffic control signs fixed message (643.1000)SF72$10.20$10.20$10.20$10.20$13.20
124Traffic control signs PCMS (643.1050)DAY60$45.00$45.00$45.00$45.00$50.00
125Temporary marking line paint 6- inch (643.3165)LF52,750$0.39$0.77$0.77$0.77$0.80
126Temporary marking line removable tape 6-inch (643.3180)LF13,155$1.90$1.90$1.90$1.90$1.95
127Traffic control (643.5000)EACH1$5,182.00$5,182.00$5,182.00$5,182.00$20,182
128Temporary pedestrian barricade (644.1810)LF350$5.00$5.00$5.00$5.00$6.00
129Geotextile type HR (645.0120)SY385$8.21$3.50$7.50$10.00$5.00
130Marking line epoxy 6-inch (646.2020)LF5,860$0.56$1.00$1.00$1.00$1.10
131Marking line grooved wet ref epoxy 6-inch (646.2040)LF53,175$1.31$1.70$1.70$1.70$1.72
132Marking line grooved wet ref epoxy 10-inch (646.4040)LF650$3.08$3.70$3.70$3.70$4.70
133Marking arrow epoxy (646.5020)EACH2$239.53$350.00$350.00$350.00$400.00
134Marking stop line epoxy 18-inch (646.6120)LF30$19.43$20.00$20.00$20.00$23.00
135Marking dotted extension epoxy 18-inch (646.6320)LF126$19.43$20.00$20.00$20.00$23.00
136Cold weather marking epoxy 6-inch (646.6466)LF39,850$0.56$0.32$0.32$0.32$0.35
137Cold weather marking epoxy 10- inch (646.6470)LF125$5.00$0.49$0.49$0.49$5.00
138Marking diagonal epoxy 12-inch (646.7120)LF465$15.96$9.00$9.00$9.00$11.00
139Marking curb epoxy (646.8120)LF560$9.32$8.00$8.00$8.00$10.00
140Marking island nose epoxy (646.8220)EACH9$348.10$330.00$330.00$330.00$380.00
141Marking removal line 4-inch (646.9000)LF4,000$0.88$0.88$0.88$1.20$1.10
142Locating no-passing zones (648.0100)MI1.95$623.81$2,000.00$2,000.00$2,000.00$2,200.00
143Construction staking storm sewer (650.4000)EACH33$225.00$225.00$225.00$225.00$230.00
144Construction staking subgrade (650.4500)LF7,325$0.01$0.01$0.01$0.01$0.01
145Construction staking base (650.5000)LF7,325$1.12$1.12$1.12$1.12$1.25
146Construction staking pipe culverts (650.6000)EACH9$275.00$275.00$275.00$275.00$325.00
147Construction staking resurfacing reference (650.8000)LF10,333$0.15$0.15$0.15$0.15$0.25
148Construction staking electrical installations (project) 01. 1590-14- 75 (650.8501)EACH1$5,000.00$5,000.00$5,000.00$5,000.00$5,200.00
149Construction staking electrical installations (project) 02. 1590-14- 76 (650.8501)EACH1$5,000.00$5,000.00$5,000.00$5,000.00$5,200.00
150Construction staking curb ramps (650.9000)EACH2$750.00$750.00$750.00$750.00$1,000.00
151Construction staking supplemental control (project) 01. 1590-14-73 (650.9911)EACH1$10.00$10.00$10.00$10.00$210.00
152Construction staking supplemental control (project) 02. 1590-14-75 (650.9911)EACH1$2,000.00$2,000.00$2,000.00$2,000.00$2,200.00
153Construction staking supplemental control (project) 03. 1590-14-76 (650.9911)EACH1$2,000.00$2,000.00$2,000.00$2,000.00$2,200.00
154Construction staking slope stakes (650.9920)LF7,325$1.12$1.12$1.12$1.12$1.25
155Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF4,281$10.94$10.94$10.94$10.94$11.25
156Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF108$12.23$12.23$12.23$12.23$15.25
157Pull boxes non-conductive 24X42- inch (653.0164)EACH37$2,542.00$2,542.00$2,542.00$2,542.00$2,562.00
158Concrete bases type 5 (654.0105)EACH27$1,400.00$1,400.00$1,400.00$1,400.00$1,420.00
159Concrete control cabinet bases type L30 (654.0230)EACH2$3,355.00$3,355.00$3,355.00$3,355.00$3,555.00
160Electrical wire lighting 12 AWG (655.0610)LF3,645$1.37$1.37$1.37$1.37$1.60
161Electrical wire lighting 10 AWG (655.0615)LF20,823$1.54$1.54$1.54$1.54$1.60
162Electrical service meter breaker pedestal (location) 01. sta. 11+93.85 'rab', 56.4' RT (656.0201)EACH1$3,395.00$3,395.00$3,395.00$3,395.00$3,895.00
163Electrical service meter breaker pedestal (location) 02. sta. 50+17.65 'rab', 51.0' RT (656.0201)EACH1$3,395.00$3,395.00$3,395.00$3,395.00$3,895.00
164Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH27$792.00$792.00$792.00$792.00$892.00
165Poles type 5-aluminum (657.0322)EACH27$2,657.00$2,657.00$2,657.00$2,657.00$3,157.00
166Luminaire arms truss type 4 1/2- inch clamp 12-FT (657.0710)EACH27$901.00$901.00$901.00$901.00$1,001.00
167Luminaires utility LED A (659.1115)EACH27$323.00$323.00$323.00$323.00$373.00
168Lighting control cabinets 120/240 30-inch (659.2130)EACH2$11,152$11,152$11,152$11,152$12,152
169Public land survey monument verify and reset (680.0100)EACH1$500.00$500.00$500.00$500.00$800.00
170Sawing asphalt (690.0150)LF8,116$3.00$1.60$1.60$1.60$3.00
171Sawing concrete (690.0250)LF60$10.00$2.35$2.35$2.35$6.00
172Incentive compressive strength concrete pavement (715.0720)DOL1,000$1.00$1.00$1.00$1.00$1.00
173Incentive iri ride (740.0440)DOL7,828$1.00$1.00$1.00$1.00$1.00
174On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,400$5.00$5.00$5.00$5.00$5.00
175On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS1,980$5.00$5.00$5.00$5.00$5.00
176Special 01. removing flashing beacon assembly, ush 8 & CTH L intersection (SPV.0060)EACH1$500.00$500.00$500.00$500.00$700.00
177Special 02. removing flashing beacon assembly, ush 8 & CTH A intersection (SPV.0060)EACH1$500.00$500.00$500.00$500.00$700.00
178Special 03. construction staking roundabout CTH L intersection (SPV.0060)EACH1$8,000.00$8,000.00$8,000.00$8,000.00$9,000.00
179Special 04. construction staking roundabout CTH A intersection (SPV.0060)EACH1$8,000.00$8,000.00$8,000.00$8,000.00$9,000.00
180Special 05. temporary lighting CTH L intersection (SPV.0060)EACH1$27,513$27,513$27,513$27,513$29,013
181Special 06. temporary lighting CTH A intersection (SPV.0060)EACH1$29,031$29,031$29,031$29,031$30,531
182Special 07. research and locate existing land parcel monuments (SPV.0060)EACH3$269.00$269.00$269.00$269.00$368.00
183Special 08. verify and replace existing land parcel monuments (SPV.0060)EACH3$269.00$269.00$269.00$269.00$369.00
184Special 01. seeding low maintenance fescue (SPV.0085)LB55$15.00$15.00$15.00$15.00$20.00
185Special 01. protective thermoplastic coating at snowmobile trail crossing (SPV.0180)SY200$135.00$160.00$160.00$160.00$165.00
186Special 02. removing distressed asphaltic surface milling (SPV.0180)SY930$4.00$4.00$7.00$4.00$5.00
WisDOT contract 20260915018: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of September 15, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy