WisDOT contract 20260915020 bid tabulation

6150-01-77. Let by Wisconsin DOT on September 15, 2026, Marquette. 3 bids received; low bid $1,873,180 by Hoffman Construction Company.

Owner
Wisconsin DOT
Letting
15 SEP 2026
Pay items
146
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Hoffman Construction Company$1,873,180Low
2A-1 Excavating LLC$1,947,836+4.0%
3James Peterson Sons, Inc.$1,997,835+7.0%
WisDOT contract 20260915020: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Hoffman Construction Company2. A-1 Excavating LLC3. James Peterson Sons, Inc.
1Clearing (201.0105)STA2$1,525.00$500.00$1,500.00
2Clearing (201.0120)ID134$85.00$20.00$70.00
3Grubbing (201.0205)STA2$545.00$1,500.00$400.00
4Grubbing (201.0220)ID158$20.00$70.00$10.00
5Removing small pipe culverts (203.0100)EACH2$1,000.00$900.00$1,000.00
6Removing concrete pavement (204.0100)SY476$9.00$9.00$5.00
7Removing asphaltic surface (204.0110)SY481$4.00$5.00$5.00
8Removing curb & gutter (204.0150)LF1,519$4.00$4.00$2.75
9Removing concrete sidewalk (204.0155)SY755$6.00$12.00$12.00
10Removing manholes (204.0210)EACH4$500.00$600.00$500.00
11Removing inlets (204.0220)EACH13$500.00$600.00$400.00
12Removing storm sewer (size) 01. 12-inch (204.0245)LF464$13.50$18.00$17.00
13Removing storm sewer (size) 02. 16-inch (204.0245)LF496$13.50$19.00$20.00
14Removing storm sewer (size) 03. 24-inch (204.0245)LF475$13.50$22.00$24.00
15Removing storm sewer (size) 04. 30-inch (204.0245)LF8$13.50$24.00$50.00
16Excavation common (205.0100)CY5,535$15.00$20.00$17.50
17Finishing roadway (project) 01. 6150-01-77 (213.0100)EACH1$100.00$500.00$2,500.00
18Base aggregate dense 3/4-inch (305.0110)TON23$100.00$55.00$100.00
19Base aggregate dense 1 1/4-inch (305.0120)TON5,001$24.00$25.00$24.93
20Tack coat (455.0605)GAL379$4.75$2.50$4.75
21Incentive density HMA pavement (460.2000)DOL1,160$1.00$1.00$1.00
22HMA pavement 3 LT 58-28 S (460.5223)TON1,085$79.95$103.00$79.95
23HMA pavement 4 LT 58-28 H (460.5424)TON723$99.95$111.00$99.95
24Asphaltic surface (465.0105)TON12$295.00$402.00$295.00
25Asphaltic surface driveways and field entrances (465.0120)TON59$225.00$267.00$225.00
26Concrete collars for pipe (520.8000)EACH3$750.00$1,500.00$693.38
27Apron endwalls for culvert pipe steel 18-inch (521.1018)EACH2$600.00$540.00$343.38
28Culvert pipe corrugated steel 18- inch (521.3118)LF14$104.00$110.00$65.61
29Culvert pipe reinforced concrete class III 18-inch (522.0118)LF105.50$74.00$90.00$86.25
30Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018)EACH3$1,200.00$2,100.00$1,419.37
31Concrete curb & gutter 30-inch type D (601.0411)LF3,097$23.88$25.00$24.12
32Concrete curb pedestrian (601.0600)LF44$36.79$39.00$37.16
33Concrete sidewalk 4-inch (602.0405)SF12,576$8.07$9.35$8.16
34Curb ramp detectable warning field yellow (602.0505)SF150$62.41$66.00$63.04
35Curb ramp detectable warning field radial yellow (602.0605)SF18.50$67.84$72.00$68.52
36Concrete driveway 6-inch (602.0810)SY355$83.38$98.00$84.22
37Storm sewer pipe reinforced concrete class III 12-inch (608.0312)LF106$70.00$74.00$118.30
38Storm sewer pipe reinforced concrete class III 18-inch (608.0318)LF149$80.00$77.00$135.66
39Storm sewer pipe reinforced concrete class III 24-inch (608.0324)LF173$100.00$105.00$132.85
40Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF258$70.00$73.00$108.03
41Storm sewer pipe reinforced concrete class IV 18-inch (608.0418)LF237$84.00$82.00$123.41
42Storm sewer pipe reinforced concrete class IV 24-inch (608.0424)LF607$100.00$113.00$127.66
43Storm sewer pipe reinforced concrete class IV 30-inch (608.0430)LF298$130.00$159.00$173.56
44Storm sewer pipe reinforced concrete class IV 36-inch (608.0436)LF8$214.00$274.00$281.19
45Manhole covers type J (611.0530)EACH9$750.00$1,100.00$1,195.35
46Inlet covers type C (611.0612)EACH1$750.00$1,300.00$1,230.35
47Inlet covers type H (611.0624)EACH20$1,100.00$1,300.00$1,661.20
48Inlet covers type MS (611.0642)EACH1$850.00$1,100.00$568.40
49Catch basins 4-FT diameter (611.1004)EACH1$3,700.00$4,400.00$4,461.08
50Manholes 4-FT diameter (611.2004)EACH4$2,600.00$3,400.00$2,635.09
51Manholes 5-FT diameter (611.2005)EACH4$3,500.00$5,300.00$4,104.36
52Manholes 6-FT diameter (611.2006)EACH2$7,000.00$8,300.00$7,564.16
53Manholes 7-FT diameter (611.2007)EACH1$8,700.00$9,300.00$5,255.98
54Manholes 9-FT diameter (611.2009)EACH1$16,000$19,300$15,676
55Inlets 4-FT diameter (611.3004)EACH7$2,400.00$3,300.00$2,768.93
56Inlets 2X3-FT (611.3230)EACH10$2,000.00$2,300.00$1,975.79
57Inlets median 2 grate (611.3902)EACH1$4,500.00$3,300.00$2,102.79
58Maintenance and repair of haul roads (project) 01. 6150-01-77 (618.0100)EACH1$100.00$100.00$550.00
59Mobilization (619.1000)EACH1$205,150$120,000$156,788
60Water (624.0100)MGAL46$130.00$40.00$70.00
61Topsoil (625.0100)SY5,428$7.00$5.00$8.10
62Silt fence (628.1504)LF426$2.50$2.60$2.50
63Silt fence maintenance (628.1520)LF426$0.01$0.01$0.01
64Mobilizations erosion control (628.1905)EACH10$150.00$158.00$150.00
65Mobilizations emergency erosion control (628.1910)EACH5$50.00$53.00$50.00
66Erosion mat urban class I type A (628.2006)SY5,428$1.65$1.80$1.65
67Inlet protection type A (628.7005)EACH22$25.00$27.00$25.00
68Inlet protection type C (628.7015)EACH22$70.00$74.00$70.00
69Inlet protection type D (628.7020)EACH9$125.00$132.00$125.00
70Culvert pipe checks (628.7555)EACH5$15.00$16.00$15.00
71Fertilizer type B (629.0210)CWT3.42$90.00$95.00$90.00
72Seeding mixture no. 40 (630.0140)LB245$7.75$8.00$7.75
73Seeding temporary (630.0200)LB29$5.00$5.00$5.00
74Seed water (630.0500)MGAL97.54$5.00$5.00$5.00
75Markers culvert end (633.5200)EACH2$70.00$73.50$70.00
76Posts wood 4X6-inch X 14-FT (634.0614)EACH22$75.00$79.00$75.00
77Posts wood 4X6-inch X 16-FT (634.0616)EACH12$80.00$84.00$80.00
78Posts wood 4X6-inch X 18-FT (634.0618)EACH2$85.00$89.00$85.00
79Signs type II reflective H (637.2210)SF39$25.95$27.00$25.95
80Signs type II reflective F (637.2230)SF55$25.45$27.00$25.45
81Moving signs type II (638.2102)EACH22$75.00$79.00$75.00
82Removing signs type II (638.2602)EACH10$25.00$27.00$25.00
83Removing small sign supports (638.3000)EACH27$25.00$27.00$25.00
84Field office type C (642.5201)EACH1$25,000$10,000$15,000
85Traffic control drums (643.0300)DAY5,845$0.25$0.30$0.25
86Traffic control barricades type III (643.0420)DAY3,660$0.50$0.60$0.50
87Traffic control warning lights type A (643.0705)DAY6,581$0.20$0.20$0.20
88Traffic control signs (643.0900)DAY45,044$0.25$0.30$0.25
89Traffic control covering signs type II (643.0920)EACH13$25.00$30.00$25.00
90Traffic control signs fixed message (643.1000)SF54$25.00$30.00$25.00
91Temporary marking line epoxy 6- inch (643.3170)LF862$1.25$1.30$1.40
92Temporary marking crosswalk epoxy 6-inch (643.3320)LF58$20.00$21.00$11.00
93Traffic control (643.5000)EACH1$5,500.00$10,000$5,500.00
94Temporary pedestrian curb ramp (644.1601)DAY145$10.00$11.00$10.00
95Temporary pedestrian detectable warning field (644.1605)SF20$10.00$11.00$10.00
96Temporary pedestrian barricade (644.1810)LF214$8.00$9.00$8.00
97Marking line grooved wet ref epoxy 6-inch (646.2040)LF6,052$1.48$1.60$2.00
98Marking stop line epoxy 18-inch (646.6120)LF67$17.19$18.00$16.00
99Marking crosswalk epoxy transverse line 6-inch (646.7420)LF653$14.04$15.00$14.00
100Marking removal line 4-inch (646.9000)LF710$2.75$1.30$1.60
101Marking removal line 6-inch (646.9002)LF68$4.50$1.60$1.62
102Construction staking storm sewer (650.4000)EACH30$125.00$170.00$162.00
103Construction staking subgrade (650.4500)LF1,715$0.01$0.01$0.01
104Construction staking base (650.5000)LF1,715$0.60$0.75$0.71
105Construction staking curb gutter and curb & gutter (650.5500)LF3,141$2.00$0.85$0.78
106Construction staking pipe culverts (650.6000)EACH3$100.00$163.00$155.00
107Construction staking curb ramps (650.9000)EACH16$100.00$158.00$150.00
108Construction staking sidewalk (project) 01. 6150-01-77 (650.9500)EACH0.80$10,000$945.00$900.00
109Construction staking sidewalk (project) 02. 6150-01-77 (650.9500)EACH0.20$10,000$1,050.00$1,000.00
110Construction staking supplemental control (project) 01. 6150-01-77 (650.9911)EACH1$5,000.00$893.00$850.00
111Construction staking slope stakes (650.9920)LF1,715$0.65$1.00$0.79
112Sawing asphalt (690.0150)LF555$2.25$3.00$2.00
113Sawing concrete (690.0250)LF407$2.95$4.00$2.55
114On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,000$5.00$5.00$5.00
115On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS1,260$5.00$5.00$5.00
116Special .01 imported granular backfill (for sanitary sewer) (SPV.0035)CY400$5.00$1.00$43.46
117Special .02 imported granular backfill (for water main) (SPV.0035)CY400$5.00$1.00$43.46
118Special .01 construction sanitary sewer staking (SPV.0060)EACH1$2,000.00$1,785.00$1,700.00
119Special .02 construction water main staking (SPV.0060)EACH1$1,500.00$1,785.00$1,700.00
120Special .03 ulo for sanitary sewer (SPV.0060)EACH3$700.00$300.00$750.00
121Special .04 sanitary sewer manhole, 48-inch (SPV.0060)EACH3$5,000.00$5,800.00$4,327.40
122Special .05 sanitary sewer wye, 8- inch X 6-inch (SPV.0060)EACH15$240.00$270.00$235.92
123Special .06 connect to existing sanitary sewer (SPV.0060)EACH5$600.00$1,700.00$1,960.50
124Special .07 remove sanitary sewer structure (SPV.0060)EACH1$700.00$700.00$500.00
125Special .08 remove existing hydrant assembly (SPV.0060)EACH2$500.00$500.00$650.00
126Special .09 remove existing valve box (SPV.0060)EACH1$100.00$200.00$250.00
127Special .10 abandon existing water main (SPV.0060)EACH3$1,400.00$600.00$1,000.00
128Special .11 hydrant (SPV.0060)EACH3$7,700.00$6,700.00$6,848.80
129Special .12 valve and box 6-inch (SPV.0060)EACH3$2,680.00$2,500.00$2,643.20
130Special .13 valve and box 8-inch (SPV.0060)EACH9$3,410.00$3,500.00$3,697.40
131Special .14 tee 8-inch X 6-inch (SPV.0060)EACH3$1,000.00$1,100.00$816.20
132Special .15 tee 8-inch X 8-inch (SPV.0060)EACH1$1,180.00$1,200.00$939.40
133Special .16 cross 8-inch X 8-inch (SPV.0060)EACH1$2,000.00$1,700.00$1,296.40
134Special .17 bend 8-inch (SPV.0060)EACH8$980.00$800.00$519.40
135Special .18 corporation curb stop box & reconnect 1-inch (SPV.0060)EACH14$1,000.00$1,200.00$865.40
136Special .19 connect to existing water main (SPV.0060)EACH5$3,600.00$2,900.00$2,255.54
137Special .20 temporary water service (SPV.0060)EACH14$1,200.00$300.00$1,000.00
138Special .21 transite pipe removal connection handling and disposal (SPV.0060)EACH1$7,800.00$3,000.00$0.01
139Special .22 shuttle service (SPV.0060)EACH1$100.00$9,000.00$1,000.00
140Special .23 storm sewer plug (SPV.0060)EACH1$500.00$500.00$852.50
141Special .01 sanitary sewr PVC 8- inch (SPV.0090)LF1,300$79.00$85.00$96.18
142Special .02 sanitary lateral PVC 6- inch (SPV.0090)LF422$74.00$73.00$104.20
143Special .03 water main ductile iron 6-inch (SPV.0090)LF74$90.00$118.00$132.79
144Special .04 water main ductile iron 8-inch (SPV.0090)LF1,241$104.00$126.00$118.19
145Special .05 water service copper 1- inch (SPV.0090)LF433$83.00$85.00$108.56
146Special .01 insulation 4-foot X 8- foot polystyrene board, 2-inch thick (SPV.0165)SF352$5.00$5.00$4.00
WisDOT contract 20260915020: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of September 15, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy