6150-01-77. Let by Wisconsin DOT on September 15, 2026, Marquette. 3 bids received; low bid $1,873,180 by Hoffman Construction Company.
- Owner
- Wisconsin DOT
- Letting
- 15 SEP 2026
- Pay items
- 146
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Hoffman Construction Company | $1,873,180 | Low |
| 2 | A-1 Excavating LLC | $1,947,836 | +4.0% |
| 3 | James Peterson Sons, Inc. | $1,997,835 | +7.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Hoffman Construction Company | 2. A-1 Excavating LLC | 3. James Peterson Sons, Inc. |
|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 2 | $1,525.00 | $500.00 | $1,500.00 |
| 2 | Clearing (201.0120) | ID | 134 | $85.00 | $20.00 | $70.00 |
| 3 | Grubbing (201.0205) | STA | 2 | $545.00 | $1,500.00 | $400.00 |
| 4 | Grubbing (201.0220) | ID | 158 | $20.00 | $70.00 | $10.00 |
| 5 | Removing small pipe culverts (203.0100) | EACH | 2 | $1,000.00 | $900.00 | $1,000.00 |
| 6 | Removing concrete pavement (204.0100) | SY | 476 | $9.00 | $9.00 | $5.00 |
| 7 | Removing asphaltic surface (204.0110) | SY | 481 | $4.00 | $5.00 | $5.00 |
| 8 | Removing curb & gutter (204.0150) | LF | 1,519 | $4.00 | $4.00 | $2.75 |
| 9 | Removing concrete sidewalk (204.0155) | SY | 755 | $6.00 | $12.00 | $12.00 |
| 10 | Removing manholes (204.0210) | EACH | 4 | $500.00 | $600.00 | $500.00 |
| 11 | Removing inlets (204.0220) | EACH | 13 | $500.00 | $600.00 | $400.00 |
| 12 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 464 | $13.50 | $18.00 | $17.00 |
| 13 | Removing storm sewer (size) 02. 16-inch (204.0245) | LF | 496 | $13.50 | $19.00 | $20.00 |
| 14 | Removing storm sewer (size) 03. 24-inch (204.0245) | LF | 475 | $13.50 | $22.00 | $24.00 |
| 15 | Removing storm sewer (size) 04. 30-inch (204.0245) | LF | 8 | $13.50 | $24.00 | $50.00 |
| 16 | Excavation common (205.0100) | CY | 5,535 | $15.00 | $20.00 | $17.50 |
| 17 | Finishing roadway (project) 01. 6150-01-77 (213.0100) | EACH | 1 | $100.00 | $500.00 | $2,500.00 |
| 18 | Base aggregate dense 3/4-inch (305.0110) | TON | 23 | $100.00 | $55.00 | $100.00 |
| 19 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 5,001 | $24.00 | $25.00 | $24.93 |
| 20 | Tack coat (455.0605) | GAL | 379 | $4.75 | $2.50 | $4.75 |
| 21 | Incentive density HMA pavement (460.2000) | DOL | 1,160 | $1.00 | $1.00 | $1.00 |
| 22 | HMA pavement 3 LT 58-28 S (460.5223) | TON | 1,085 | $79.95 | $103.00 | $79.95 |
| 23 | HMA pavement 4 LT 58-28 H (460.5424) | TON | 723 | $99.95 | $111.00 | $99.95 |
| 24 | Asphaltic surface (465.0105) | TON | 12 | $295.00 | $402.00 | $295.00 |
| 25 | Asphaltic surface driveways and field entrances (465.0120) | TON | 59 | $225.00 | $267.00 | $225.00 |
| 26 | Concrete collars for pipe (520.8000) | EACH | 3 | $750.00 | $1,500.00 | $693.38 |
| 27 | Apron endwalls for culvert pipe steel 18-inch (521.1018) | EACH | 2 | $600.00 | $540.00 | $343.38 |
| 28 | Culvert pipe corrugated steel 18- inch (521.3118) | LF | 14 | $104.00 | $110.00 | $65.61 |
| 29 | Culvert pipe reinforced concrete class III 18-inch (522.0118) | LF | 105.50 | $74.00 | $90.00 | $86.25 |
| 30 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 3 | $1,200.00 | $2,100.00 | $1,419.37 |
| 31 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 3,097 | $23.88 | $25.00 | $24.12 |
| 32 | Concrete curb pedestrian (601.0600) | LF | 44 | $36.79 | $39.00 | $37.16 |
| 33 | Concrete sidewalk 4-inch (602.0405) | SF | 12,576 | $8.07 | $9.35 | $8.16 |
| 34 | Curb ramp detectable warning field yellow (602.0505) | SF | 150 | $62.41 | $66.00 | $63.04 |
| 35 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 18.50 | $67.84 | $72.00 | $68.52 |
| 36 | Concrete driveway 6-inch (602.0810) | SY | 355 | $83.38 | $98.00 | $84.22 |
| 37 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 106 | $70.00 | $74.00 | $118.30 |
| 38 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 149 | $80.00 | $77.00 | $135.66 |
| 39 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 173 | $100.00 | $105.00 | $132.85 |
| 40 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 258 | $70.00 | $73.00 | $108.03 |
| 41 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 237 | $84.00 | $82.00 | $123.41 |
| 42 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 607 | $100.00 | $113.00 | $127.66 |
| 43 | Storm sewer pipe reinforced concrete class IV 30-inch (608.0430) | LF | 298 | $130.00 | $159.00 | $173.56 |
| 44 | Storm sewer pipe reinforced concrete class IV 36-inch (608.0436) | LF | 8 | $214.00 | $274.00 | $281.19 |
| 45 | Manhole covers type J (611.0530) | EACH | 9 | $750.00 | $1,100.00 | $1,195.35 |
| 46 | Inlet covers type C (611.0612) | EACH | 1 | $750.00 | $1,300.00 | $1,230.35 |
| 47 | Inlet covers type H (611.0624) | EACH | 20 | $1,100.00 | $1,300.00 | $1,661.20 |
| 48 | Inlet covers type MS (611.0642) | EACH | 1 | $850.00 | $1,100.00 | $568.40 |
| 49 | Catch basins 4-FT diameter (611.1004) | EACH | 1 | $3,700.00 | $4,400.00 | $4,461.08 |
| 50 | Manholes 4-FT diameter (611.2004) | EACH | 4 | $2,600.00 | $3,400.00 | $2,635.09 |
| 51 | Manholes 5-FT diameter (611.2005) | EACH | 4 | $3,500.00 | $5,300.00 | $4,104.36 |
| 52 | Manholes 6-FT diameter (611.2006) | EACH | 2 | $7,000.00 | $8,300.00 | $7,564.16 |
| 53 | Manholes 7-FT diameter (611.2007) | EACH | 1 | $8,700.00 | $9,300.00 | $5,255.98 |
| 54 | Manholes 9-FT diameter (611.2009) | EACH | 1 | $16,000 | $19,300 | $15,676 |
| 55 | Inlets 4-FT diameter (611.3004) | EACH | 7 | $2,400.00 | $3,300.00 | $2,768.93 |
| 56 | Inlets 2X3-FT (611.3230) | EACH | 10 | $2,000.00 | $2,300.00 | $1,975.79 |
| 57 | Inlets median 2 grate (611.3902) | EACH | 1 | $4,500.00 | $3,300.00 | $2,102.79 |
| 58 | Maintenance and repair of haul roads (project) 01. 6150-01-77 (618.0100) | EACH | 1 | $100.00 | $100.00 | $550.00 |
| 59 | Mobilization (619.1000) | EACH | 1 | $205,150 | $120,000 | $156,788 |
| 60 | Water (624.0100) | MGAL | 46 | $130.00 | $40.00 | $70.00 |
| 61 | Topsoil (625.0100) | SY | 5,428 | $7.00 | $5.00 | $8.10 |
| 62 | Silt fence (628.1504) | LF | 426 | $2.50 | $2.60 | $2.50 |
| 63 | Silt fence maintenance (628.1520) | LF | 426 | $0.01 | $0.01 | $0.01 |
| 64 | Mobilizations erosion control (628.1905) | EACH | 10 | $150.00 | $158.00 | $150.00 |
| 65 | Mobilizations emergency erosion control (628.1910) | EACH | 5 | $50.00 | $53.00 | $50.00 |
| 66 | Erosion mat urban class I type A (628.2006) | SY | 5,428 | $1.65 | $1.80 | $1.65 |
| 67 | Inlet protection type A (628.7005) | EACH | 22 | $25.00 | $27.00 | $25.00 |
| 68 | Inlet protection type C (628.7015) | EACH | 22 | $70.00 | $74.00 | $70.00 |
| 69 | Inlet protection type D (628.7020) | EACH | 9 | $125.00 | $132.00 | $125.00 |
| 70 | Culvert pipe checks (628.7555) | EACH | 5 | $15.00 | $16.00 | $15.00 |
| 71 | Fertilizer type B (629.0210) | CWT | 3.42 | $90.00 | $95.00 | $90.00 |
| 72 | Seeding mixture no. 40 (630.0140) | LB | 245 | $7.75 | $8.00 | $7.75 |
| 73 | Seeding temporary (630.0200) | LB | 29 | $5.00 | $5.00 | $5.00 |
| 74 | Seed water (630.0500) | MGAL | 97.54 | $5.00 | $5.00 | $5.00 |
| 75 | Markers culvert end (633.5200) | EACH | 2 | $70.00 | $73.50 | $70.00 |
| 76 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 22 | $75.00 | $79.00 | $75.00 |
| 77 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 12 | $80.00 | $84.00 | $80.00 |
| 78 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 2 | $85.00 | $89.00 | $85.00 |
| 79 | Signs type II reflective H (637.2210) | SF | 39 | $25.95 | $27.00 | $25.95 |
| 80 | Signs type II reflective F (637.2230) | SF | 55 | $25.45 | $27.00 | $25.45 |
| 81 | Moving signs type II (638.2102) | EACH | 22 | $75.00 | $79.00 | $75.00 |
| 82 | Removing signs type II (638.2602) | EACH | 10 | $25.00 | $27.00 | $25.00 |
| 83 | Removing small sign supports (638.3000) | EACH | 27 | $25.00 | $27.00 | $25.00 |
| 84 | Field office type C (642.5201) | EACH | 1 | $25,000 | $10,000 | $15,000 |
| 85 | Traffic control drums (643.0300) | DAY | 5,845 | $0.25 | $0.30 | $0.25 |
| 86 | Traffic control barricades type III (643.0420) | DAY | 3,660 | $0.50 | $0.60 | $0.50 |
| 87 | Traffic control warning lights type A (643.0705) | DAY | 6,581 | $0.20 | $0.20 | $0.20 |
| 88 | Traffic control signs (643.0900) | DAY | 45,044 | $0.25 | $0.30 | $0.25 |
| 89 | Traffic control covering signs type II (643.0920) | EACH | 13 | $25.00 | $30.00 | $25.00 |
| 90 | Traffic control signs fixed message (643.1000) | SF | 54 | $25.00 | $30.00 | $25.00 |
| 91 | Temporary marking line epoxy 6- inch (643.3170) | LF | 862 | $1.25 | $1.30 | $1.40 |
| 92 | Temporary marking crosswalk epoxy 6-inch (643.3320) | LF | 58 | $20.00 | $21.00 | $11.00 |
| 93 | Traffic control (643.5000) | EACH | 1 | $5,500.00 | $10,000 | $5,500.00 |
| 94 | Temporary pedestrian curb ramp (644.1601) | DAY | 145 | $10.00 | $11.00 | $10.00 |
| 95 | Temporary pedestrian detectable warning field (644.1605) | SF | 20 | $10.00 | $11.00 | $10.00 |
| 96 | Temporary pedestrian barricade (644.1810) | LF | 214 | $8.00 | $9.00 | $8.00 |
| 97 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 6,052 | $1.48 | $1.60 | $2.00 |
| 98 | Marking stop line epoxy 18-inch (646.6120) | LF | 67 | $17.19 | $18.00 | $16.00 |
| 99 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 653 | $14.04 | $15.00 | $14.00 |
| 100 | Marking removal line 4-inch (646.9000) | LF | 710 | $2.75 | $1.30 | $1.60 |
| 101 | Marking removal line 6-inch (646.9002) | LF | 68 | $4.50 | $1.60 | $1.62 |
| 102 | Construction staking storm sewer (650.4000) | EACH | 30 | $125.00 | $170.00 | $162.00 |
| 103 | Construction staking subgrade (650.4500) | LF | 1,715 | $0.01 | $0.01 | $0.01 |
| 104 | Construction staking base (650.5000) | LF | 1,715 | $0.60 | $0.75 | $0.71 |
| 105 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 3,141 | $2.00 | $0.85 | $0.78 |
| 106 | Construction staking pipe culverts (650.6000) | EACH | 3 | $100.00 | $163.00 | $155.00 |
| 107 | Construction staking curb ramps (650.9000) | EACH | 16 | $100.00 | $158.00 | $150.00 |
| 108 | Construction staking sidewalk (project) 01. 6150-01-77 (650.9500) | EACH | 0.80 | $10,000 | $945.00 | $900.00 |
| 109 | Construction staking sidewalk (project) 02. 6150-01-77 (650.9500) | EACH | 0.20 | $10,000 | $1,050.00 | $1,000.00 |
| 110 | Construction staking supplemental control (project) 01. 6150-01-77 (650.9911) | EACH | 1 | $5,000.00 | $893.00 | $850.00 |
| 111 | Construction staking slope stakes (650.9920) | LF | 1,715 | $0.65 | $1.00 | $0.79 |
| 112 | Sawing asphalt (690.0150) | LF | 555 | $2.25 | $3.00 | $2.00 |
| 113 | Sawing concrete (690.0250) | LF | 407 | $2.95 | $4.00 | $2.55 |
| 114 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,000 | $5.00 | $5.00 | $5.00 |
| 115 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,260 | $5.00 | $5.00 | $5.00 |
| 116 | Special .01 imported granular backfill (for sanitary sewer) (SPV.0035) | CY | 400 | $5.00 | $1.00 | $43.46 |
| 117 | Special .02 imported granular backfill (for water main) (SPV.0035) | CY | 400 | $5.00 | $1.00 | $43.46 |
| 118 | Special .01 construction sanitary sewer staking (SPV.0060) | EACH | 1 | $2,000.00 | $1,785.00 | $1,700.00 |
| 119 | Special .02 construction water main staking (SPV.0060) | EACH | 1 | $1,500.00 | $1,785.00 | $1,700.00 |
| 120 | Special .03 ulo for sanitary sewer (SPV.0060) | EACH | 3 | $700.00 | $300.00 | $750.00 |
| 121 | Special .04 sanitary sewer manhole, 48-inch (SPV.0060) | EACH | 3 | $5,000.00 | $5,800.00 | $4,327.40 |
| 122 | Special .05 sanitary sewer wye, 8- inch X 6-inch (SPV.0060) | EACH | 15 | $240.00 | $270.00 | $235.92 |
| 123 | Special .06 connect to existing sanitary sewer (SPV.0060) | EACH | 5 | $600.00 | $1,700.00 | $1,960.50 |
| 124 | Special .07 remove sanitary sewer structure (SPV.0060) | EACH | 1 | $700.00 | $700.00 | $500.00 |
| 125 | Special .08 remove existing hydrant assembly (SPV.0060) | EACH | 2 | $500.00 | $500.00 | $650.00 |
| 126 | Special .09 remove existing valve box (SPV.0060) | EACH | 1 | $100.00 | $200.00 | $250.00 |
| 127 | Special .10 abandon existing water main (SPV.0060) | EACH | 3 | $1,400.00 | $600.00 | $1,000.00 |
| 128 | Special .11 hydrant (SPV.0060) | EACH | 3 | $7,700.00 | $6,700.00 | $6,848.80 |
| 129 | Special .12 valve and box 6-inch (SPV.0060) | EACH | 3 | $2,680.00 | $2,500.00 | $2,643.20 |
| 130 | Special .13 valve and box 8-inch (SPV.0060) | EACH | 9 | $3,410.00 | $3,500.00 | $3,697.40 |
| 131 | Special .14 tee 8-inch X 6-inch (SPV.0060) | EACH | 3 | $1,000.00 | $1,100.00 | $816.20 |
| 132 | Special .15 tee 8-inch X 8-inch (SPV.0060) | EACH | 1 | $1,180.00 | $1,200.00 | $939.40 |
| 133 | Special .16 cross 8-inch X 8-inch (SPV.0060) | EACH | 1 | $2,000.00 | $1,700.00 | $1,296.40 |
| 134 | Special .17 bend 8-inch (SPV.0060) | EACH | 8 | $980.00 | $800.00 | $519.40 |
| 135 | Special .18 corporation curb stop box & reconnect 1-inch (SPV.0060) | EACH | 14 | $1,000.00 | $1,200.00 | $865.40 |
| 136 | Special .19 connect to existing water main (SPV.0060) | EACH | 5 | $3,600.00 | $2,900.00 | $2,255.54 |
| 137 | Special .20 temporary water service (SPV.0060) | EACH | 14 | $1,200.00 | $300.00 | $1,000.00 |
| 138 | Special .21 transite pipe removal connection handling and disposal (SPV.0060) | EACH | 1 | $7,800.00 | $3,000.00 | $0.01 |
| 139 | Special .22 shuttle service (SPV.0060) | EACH | 1 | $100.00 | $9,000.00 | $1,000.00 |
| 140 | Special .23 storm sewer plug (SPV.0060) | EACH | 1 | $500.00 | $500.00 | $852.50 |
| 141 | Special .01 sanitary sewr PVC 8- inch (SPV.0090) | LF | 1,300 | $79.00 | $85.00 | $96.18 |
| 142 | Special .02 sanitary lateral PVC 6- inch (SPV.0090) | LF | 422 | $74.00 | $73.00 | $104.20 |
| 143 | Special .03 water main ductile iron 6-inch (SPV.0090) | LF | 74 | $90.00 | $118.00 | $132.79 |
| 144 | Special .04 water main ductile iron 8-inch (SPV.0090) | LF | 1,241 | $104.00 | $126.00 | $118.19 |
| 145 | Special .05 water service copper 1- inch (SPV.0090) | LF | 433 | $83.00 | $85.00 | $108.56 |
| 146 | Special .01 insulation 4-foot X 8- foot polystyrene board, 2-inch thick (SPV.0165) | SF | 352 | $5.00 | $5.00 | $4.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of September 15, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.