WisDOT contract 20260915031 bid tabulation

1180-00-81. Let by Wisconsin DOT on September 15, 2026, Douglas. 4 bids received; low bid $6,382,233 by Hoffman Construction Company.

Owner
Wisconsin DOT
Letting
15 SEP 2026
Pay items
135
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Hoffman Construction Company$6,382,233Low
2Northern Interstate Construction, Inc.$6,394,2190.0%
3James Peterson Sons, Inc.$6,565,657+3.0%
4A-1 Excavating LLC$6,596,682+3.0%
WisDOT contract 20260915031: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Hoffman Construction Company2. Northern Interstate Construction, Inc.3. James Peterson Sons, Inc.4. A-1 Excavating LLC
1Clearing (201.0115)ACRE1.55$17,450$10,000$17,450$18,497
2Grubbing (201.0215)ACRE1.55$4,250.00$10,000$4,250.00$4,505.00
3Removing structure (structure) 01. C-16-0099 (203.0220)EACH1$80,000$160,000$48,303$60,611
4Removing structure (structure) 02. C-16-0100 (203.0220)EACH1$40,000$130,000$28,657$21,550
5Removing asphaltic surface (204.0110)SY20$20.00$25.00$30.00$18.00
6Removing asphaltic surface butt joints (204.0115)SY2,070$9.53$9.53$9.53$10.00
7Removing asphaltic surface milling (204.0120)SY72,560$2.44$2.44$2.44$2.60
8Removing asphaltic longitudinal notched wedge joint milling (204.0126.S)LF37,765$2.11$2.11$2.11$2.25
9Removing curb & gutter (204.0150)LF69$20.00$15.00$22.50$12.00
10Removing (item description) 01. apron endwalls (204.9060.S)EACH4$400.00$5,000.00$750.00$600.00
11Excavation common (205.0100)CY36,267$15.00$22.00$26.83$25.50
12Backfill granular grade 2 (209.2500)TON1,830$20.00$40.00$21.88$27.00
13Prepare foundation for asphaltic paving (project) 01. 1180-01-72 (211.0101)EACH1$7,535.54$7,535.54$7,535.00$8,000.00
14Prepare foundation for asphaltic shoulders (211.0400)STA3$90.00$500.00$250.00$1,220.00
15Finishing roadway (project) 01. 1180-00-81 (213.0100)EACH1$500.00$2,500.00$3,379.90$650.00
16Finishing roadway (project) 02. 1180-05-74 (213.0100)EACH1$500.00$2,500.00$2,550.00$650.00
17Finishing roadway (project) 03. 1180-01-72 (213.0100)EACH1$500.00$2,500.00$2,550.00$650.00
18Base aggregate dense 3/4-inch (305.0110)TON3,200$40.00$21.00$29.84$27.00
19Base aggregate dense 1 1/4-inch (305.0120)TON3,570$30.00$19.00$21.83$24.00
20Select crushed material (312.0110)TON100$44.00$50.00$30.00$40.00
21Tack coat (455.0605)GAL12,462$2.50$2.50$2.50$2.70
22HMA pavement test strip volumetrics (460.0115.S)EACH1$9,800.00$9,800.00$9,800.00$10,380
23HMA test strip density (460.0120.S)EACH2$2,250.00$2,250.00$2,250.00$2,385.00
24Incentive density HMA pavement (460.2000)DOL10,710$1.00$1.00$1.00$1.00
25HMA pavement 4 MT 58-28 S (460.6224)TON7,997$89.84$89.84$89.84$96.00
26HMA pavement 4 SMA 58-34 V (460.8644)TON13,152$114.78$114.78$114.78$122.00
27Material transfer vehicle (460.9000.S)EACH1$28,400$28,400$28,400$30,100
28Asphaltic surface (465.0105)TON280$142.04$142.04$142.04$151.00
29Asphaltic surface patching (465.0110)TON85$173.92$173.92$173.92$216.00
30Asphaltic flumes (465.0315)SY18$87.51$87.51$87.51$169.00
31Asphaltic rumble strips, shoulder (465.0520)LF20,300$0.44$0.45$0.18$0.80
32Asphaltic rumble strips, centerline (465.0560)LF17,800$0.40$0.45$0.18$1.00
33Temporary shoring (511.1100)SF1,080$0.01$32.00$0.01$10.00
34Cleaning culvert pipes (520.8700)EACH5$1,166.00$1,166.00$1,033.00$1,300.00
35Apron endwalls for culvert pipe steel 21-inch (521.1021)EACH2$550.00$300.00$361.00$900.00
36Apron endwalls for culvert pipe steel 84-inch (521.1084)EACH2$6,800.00$7,500.00$6,886.00$12,000
37Culvert pipe corrugated steel polymer coated 84-inch (521.5184)LF188$1,100.00$610.00$755.00$600.00
38Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024)EACH2$1,900.00$1,950.00$2,841.00$1,900.00
39Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557)LF69$81.80$81.80$81.80$95.00
40Riprap light (606.0100)CY4$214.00$100.00$150.00$130.00
41Riprap medium (606.0200)CY970$112.00$72.00$96.33$130.00
42Riprap heavy (606.0300)CY305$130.00$72.00$115.77$130.00
43Inlet covers type B (611.0606)EACH1$1,200.00$1,200.00$1,039.00$1,500.00
44Adjusting inlet covers (611.8115)EACH2$1,300.00$750.00$761.00$600.00
45Barrier system grading shaping finishing (614.0010)EACH2$7,200.00$5,500.00$14,393$6,600.00
46Salvaged rail (614.0920)LF980$5.00$5.00$3.25$6.00
47Salvaged guardrail end treatments (614.0925)EACH4$600.00$600.00$400.00$650.00
48MGS guardrail 3 (614.2300)LF400$31.00$31.00$26.13$33.00
49MGS guardrail 3 K (614.2330)LF412.50$43.00$43.00$43.00$46.00
50MGS guardrail terminal eat (614.2610)EACH4$4,100.00$4,100.00$3,233.00$4,400.00
51Maintenance and repair of haul roads (project) 01. 1180-00-81 (618.0100)EACH1$0.01$1.00$100.00$650.00
52Maintenance and repair of haul roads (project) 02. 1180-05-74 (618.0100)EACH1$0.01$1.00$100.00$650.00
53Maintenance and repair of haul roads (project) 03. 1180-01-72 (618.0100)EACH1$0.01$1.00$100.00$650.00
54Mobilization (619.1000)EACH1$631,313$604,574$839,100$587,587
55Water (624.0100)MGAL85$130.00$50.00$75.00$36.00
56Topsoil (625.0100)SY20,120$1.80$2.60$4.62$3.50
57Erosion bales (628.1104)EACH185$13.60$13.60$12.00$15.00
58Silt fence (628.1504)LF5,360$2.20$2.20$1.70$2.20
59Silt fence maintenance (628.1520)LF5,360$0.01$0.01$0.03$0.01
60Mobilizations erosion control (628.1905)EACH13$550.00$550.00$203.00$580.00
61Mobilizations emergency erosion control (628.1910)EACH9$350.00$350.00$303.00$370.00
62Erosion mat class I type B (628.2004)SY6,010$1.22$1.22$1.50$1.50
63Erosion mat class II type C (628.2027)SY14,110$3.80$3.80$3.53$4.00
64Polyethylene sheeting (628.5505)SY265$8.00$15.00$9.00$11.00
65Soil stabilizer type B (628.6510)ACRE4$950.00$950.00$833.00$113.00
66Inlet protection type A (628.7005)EACH2$106.00$106.00$125.00$113.00
67Inlet protection type B (628.7010)EACH2$73.00$73.00$50.00$80.00
68Inlet protection type C (628.7015)EACH35$72.00$72.00$55.00$80.00
69Inlet protection type D (628.7020)EACH2$140.00$140.00$275.00$150.00
70Temporary ditch checks (628.7504)LF970$8.95$8.95$5.33$10.00
71Stone ditch checks (628.7515.S)CY20$120.00$120.00$122.00$130.00
72Culvert pipe checks (628.7555)EACH25$21.30$21.30$25.00$23.00
73Tracking pads (628.7560)EACH4$100.00$3,000.00$3,000.00$700.00
74Rock bags (628.7570)EACH100$14.00$14.00$6.00$15.00
75Fertilizer type B (629.0210)CWT13.50$110.00$110.00$100.00$120.00
76Seeding mixture no. 20 (630.0120)LB780$7.00$7.00$7.00$8.00
77Seeding mixture no. 30 (630.0130)LB135$8.00$8.00$9.00$9.00
78Seed water (630.0500)MGAL525$1.00$1.00$5.00$1.00
79Trees (species, root, size) 01. douglasfir, common, B&B, 4-FT (632.0101)EACH75$555.00$555.00$553.00$590.00
80Trees (species, root, size) 02. spruce, white, B&B, 4-FT (632.0101)EACH75$555.00$555.00$553.00$590.00
81Landscape planting surveillance and care cycles (632.9101)EACH20$1,800.00$1,800.00$653.00$1,910.00
82Markers culvert end (633.5200)EACH17$71.00$71.00$75.00$75.00
83Moving signs type II (638.2102)EACH7$119.00$119.00$175.00$125.00
84Removing signs type II (638.2602)EACH4$41.00$41.00$50.00$50.00
85Field office type B (642.5001)EACH1$25,000$7,500.00$18,000$11,000
86Traffic control drums (643.0300)DAY13,084$0.20$0.15$0.15$0.15
87Traffic control barricades type III (643.0420)DAY2,390$0.75$0.50$0.50$0.50
88Traffic control warning lights type A (643.0705)DAY3,160$0.11$0.15$0.15$0.15
89Traffic control signs (643.0900)DAY13,813$0.30$0.25$0.25$0.30
90Traffic control covering signs type I (643.0910)EACH11$180.00$310.00$310.00$330.00
91Traffic control covering signs type II (643.0920)EACH33$45.00$110.00$110.00$120.00
92Traffic control signs fixed message (643.1000)SF228.50$12.00$14.75$14.75$20.00
93Traffic control signs PCMS (643.1050)DAY49$60.00$30.00$30.00$32.00
94Traffic control cones 42-inch (643.1070)DAY2,550$0.15$0.15$0.15$0.15
95Temporary marking line paint 6- inch (643.3165)LF83,725$0.70$0.35$0.35$0.40
96Temporary marking line removable tape 6-inch (643.3180)LF2,780$2.25$2.25$2.25$2.40
97Temporary marking removable mask out tape 6-inch (643.3960)LF88$5.00$3.00$3.00$3.20
98Traffic control (643.5000)EACH1$69,350$120,000$120,000$155,000
99Geotextile type HR (645.0120)SY2,725$5.00$8.00$4.60$4.50
100Geotextile type R (645.0130)SY88$14.00$10.00$9.60$4.50
101Marking line paint 4-inch (646.1005)LF59,295$0.23$0.25$0.25$0.30
102Marking line grooved black epoxy 6-inch (646.2025)LF4,295$0.80$0.80$0.80$0.85
103Marking line grooved wet ref epoxy 6-inch (646.2040)LF93,445$1.30$1.30$1.30$1.40
104Marking line grooved wet ref epoxy 10-inch (646.4040)LF3,025$2.40$3.00$3.00$3.20
105Marking arrow epoxy (646.5020)EACH4$340.00$228.55$228.55$250.00
106Marking word epoxy (646.5120)EACH2$350.00$305.23$305.23$325.00
107Marking aerial enforcement bar epoxy (646.5420)EACH10$200.00$440.14$440.14$470.00
108Marking stop line epoxy 18-inch (646.6120)LF470$22.00$15.69$15.69$20.00
109Marking diagonal epoxy 12-inch (646.7120)LF600$9.00$15.22$15.22$20.00
110Marking curb epoxy (646.8120)LF130$16.00$8.89$8.89$10.00
111Marking island nose epoxy (646.8220)EACH13$340.00$332.52$332.52$360.00
112Construction staking storm sewer (650.4000)EACH1$500.00$3,500.00$500.00$530.00
113Construction staking subgrade (650.4500)LF525$0.01$0.01$0.01$0.01
114Construction staking base (650.5000)LF525$2.30$10.00$3.00$3.20
115Construction staking pipe culverts (650.6000)EACH3$300.00$1,000.00$300.00$320.00
116Construction staking resurfacing reference (650.8000)LF31,133$0.12$0.11$0.12$0.15
117Construction staking supplemental control (project) 01. 1180-00-81 (650.9911)EACH1$1,000.00$10.00$1,000.00$1,060.00
118Construction staking supplemental control (project) 02. 1180-05-74 (650.9911)EACH1$1,000.00$10.00$1,000.00$1,060.00
119Construction staking supplemental control (project) 03. 1180-01-72 (650.9911)EACH1$1,000.00$10.00$1,000.00$1,060.00
120Construction staking slope stakes (650.9920)LF13,144$0.25$1.22$1.00$1.00
121Public land survey monument verify and reset (680.0100)EACH2$1,000.00$1,000.00$1,000.00$1,060.00
122Sawing asphalt (690.0150)LF378$2.10$2.10$2.10$2.25
123Sawing concrete (690.0250)LF15$3.10$3.10$3.10$4.00
124Incentive iri ride (740.0440)DOL26,910$1.00$1.00$1.00$1.00
125On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS1,500$5.00$5.00$5.00$5.00
126On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS990$5.00$5.00$5.00$5.00
127Special 01. apron endwalls for culvert pipe steel 108-inch (SPV.0060)EACH2$18,200$22,500$23,225$25,000
128Special 02. manholes 12-FT diameter (SPV.0060)EACH1$80,000$92,400$69,537$85,000
129Special 03. cross drain repair grading shaping finishing (SPV.0060)EACH1$6,150.00$350.00$6,960.00$8,000.00
130Special 04. driveway removal grading shaping finishing (SPV.0060)EACH1$2,700.00$400.00$6,433.00$5,500.00
131Special 01. culvert pipe corrugated steel polymer coated 108-inch (SPV.0090)LF316$1,900.00$918.00$802.57$840.00
132Special 02. remove and install barbed wire fence (SPV.0090)LF95$9.00$9.00$15.00$10.00
133Special 03. ditch cleaning (SPV.0090)LF575$21.00$40.00$34.71$10.00
134Special 01. shredded hardwood bark mulch (SPV.0180)SY250$16.00$16.00$35.00$17.00
135Special 02. removing asphaltic surface profile milling (SPV.0180)SY57,230$3.45$3.45$3.45$3.60
WisDOT contract 20260915031: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of September 15, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy