WisDOT contract 20261013014 bid tabulation
Oshkosh-New London; IH 41-USH 10 (USH 045, Winnebago County Oshkosh - New London). Let by Wisconsin DOT on October 13, 2026, Winnebago. 3 bids received; low bid $7,709,210 by Vinton Construction Company.
- Owner
- Wisconsin DOT
- Letting
- 13 OCT 2026
- Pay items
- 149
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Vinton Construction Company | $7,709,210 | Low |
| 2 | Zignego Company, Inc. | $8,087,926 | +5.0% |
| 3 | Michels Road & Stone, Inc. | $8,969,408 | +16% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Vinton Construction Company | 2. Zignego Company, Inc. | 3. Michels Road & Stone, Inc. |
|---|---|---|---|---|---|---|
| 1 | Removing structure (structure) 01. B-70-212 (203.0220) | EACH | 1 | $12,146 | $62,000 | $62,000 |
| 2 | Removing structure (structure) 02. B-70-219 (203.0220) | EACH | 1 | $5,464.00 | $31,000 | $31,000 |
| 3 | Removing concrete pavement (204.0100) | SY | 520 | $37.26 | $30.00 | $50.00 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 15 | $47.90 | $47.90 | $47.90 |
| 5 | Removing asphaltic surface milling (204.0120) | SY | 21,016 | $5.10 | $5.10 | $5.10 |
| 6 | Removing curb & gutter (204.0150) | LF | 83 | $10.00 | $30.00 | $25.00 |
| 7 | Removing concrete sidewalk (204.0155) | SY | 140 | $10.00 | $30.00 | $25.00 |
| 8 | Removing guardrail (204.0165) | LF | 12,549 | $2.00 | $2.00 | $2.00 |
| 9 | Removing concrete slope paving (204.0175) | SY | 954 | $12.76 | $30.00 | $27.00 |
| 10 | Removing surface drains (204.0190) | EACH | 3 | $250.00 | $1,000.00 | $500.00 |
| 11 | Excavation for structures bridges (structure) 01. B-70-212 (206.1001) | EACH | 1 | $4,442.00 | $10,000 | $10,000 |
| 12 | Excavation for structures bridges (structure) 02. B-70-219 (206.1001) | EACH | 1 | $2,140.00 | $10,000 | $10,000 |
| 13 | Backfill structure type A (210.1500) | TON | 57 | $28.00 | $100.00 | $25.00 |
| 14 | Finishing roadway (project) 01. 6200-18-70 (213.0100) | EACH | 1 | $5,000.00 | $1,000.00 | $5,000.00 |
| 15 | Base aggregate dense 3/4-inch (305.0110) | TON | 7,543 | $9.75 | $28.50 | $34.43 |
| 16 | Concrete pavement 9-inch (415.0090) | SY | 5 | $150.00 | $255.00 | $124.93 |
| 17 | Concrete pavement approach slab (415.0410) | SY | 503 | $230.00 | $255.00 | $255.00 |
| 18 | Drilled tie bars (416.0610) | EACH | 4,957 | $9.00 | $14.00 | $13.51 |
| 19 | Drilled dowel bars (416.0620) | EACH | 10,295 | $16.50 | $22.00 | $15.85 |
| 20 | Concrete pavement repair (416.1710) | SY | 3,620 | $96.67 | $97.16 | $114.99 |
| 21 | Concrete pavement replacement (416.1720) | SY | 22,139 | $99.67 | $97.16 | $121.03 |
| 22 | Concrete pavement replacement shes (416.1725) | SY | 117 | $178.00 | $250.00 | $364.04 |
| 23 | Continuous diamond grinding concrete pavement (420.1000) | SY | 80,978 | $4.45 | $4.49 | $4.40 |
| 24 | Tack coat (455.0605) | GAL | 1,468 | $4.25 | $4.25 | $4.25 |
| 25 | Incentive density HMA pavement (460.2000) | DOL | 1,510 | $1.00 | $1.00 | $1.00 |
| 26 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 2,345 | $124.95 | $124.95 | $124.95 |
| 27 | Asphaltic surface (465.0105) | TON | 19 | $395.00 | $395.00 | $395.00 |
| 28 | Asphaltic rumble strips, shoulder divided roadway (465.0510) | LF | 32,778 | $0.57 | $0.57 | $0.57 |
| 29 | Concrete masonry bridges (502.0100) | CY | 9 | $3,404.00 | $1,250.00 | $1,250.00 |
| 30 | Pigmented surface sealer reseal (502.3205) | SY | 3,435 | $9.98 | $25.00 | $25.00 |
| 31 | Pigmented surface sealer (502.3210) | SY | 13 | $7.80 | $5.00 | $5.00 |
| 32 | Adhesive anchors no. 5 bar (502.4205) | EACH | 22 | $26.00 | $25.00 | $25.00 |
| 33 | Bar steel reinforcement HS coated structures (505.0600) | LB | 1,180 | $2.85 | $2.50 | $2.50 |
| 34 | Concrete surface repair (509.1500) | SF | 117 | $400.00 | $300.00 | $300.00 |
| 35 | Epoxy crack sealing (509.9020.S) | LF | 50 | $44.00 | $5.00 | $5.00 |
| 36 | Epoxy injection crack repair (509.9025.S) | LF | 10 | $89.00 | $10.00 | $10.00 |
| 37 | Cored holes 2-inch diameter (509.9026.S) | EACH | 4 | $460.00 | $125.00 | $125.00 |
| 38 | Temporary shoring (structure) 01. B-70-212 (511.1200) | SF | 141 | $110.00 | $50.00 | $50.00 |
| 39 | Cleaning culvert pipes (520.8700) | EACH | 11 | $1,400.00 | $650.00 | $1,000.00 |
| 40 | Concrete masonry ancillary structures type NS (531.1100) | CY | 33.60 | $900.00 | $900.00 | $900.00 |
| 41 | Steel reinforcement HS ancillary structures type NS (531.1140) | LB | 4,776 | $4.00 | $4.00 | $4.00 |
| 42 | Drilling shaft 24-inch (531.2024) | LF | 280 | $70.00 | $70.00 | $70.00 |
| 43 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 28 | $85.00 | $120.00 | $88.00 |
| 44 | Concrete curb & gutter 6-inch sloped 30-inch type G (601.0413) | LF | 67 | $85.00 | $120.00 | $88.00 |
| 45 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 59 | $85.00 | $120.00 | $88.00 |
| 46 | Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588) | LF | 495 | $75.00 | $120.00 | $72.00 |
| 47 | Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590) | LF | 122 | $85.00 | $120.00 | $72.00 |
| 48 | Concrete sidewalk 4-inch (602.0405) | SF | 1,620 | $12.50 | $19.00 | $12.00 |
| 49 | Curb ramp detectable warning field yellow (602.0505) | SF | 80 | $45.00 | $100.00 | $40.00 |
| 50 | Concrete surface drains (602.3010) | CY | 11 | $1,000.00 | $1,000.00 | $1,800.00 |
| 51 | Slope paving concrete (604.0400) | SY | 986 | $89.00 | $132.00 | $110.00 |
| 52 | Adjusting inlet covers (611.8115) | EACH | 6 | $600.00 | $850.00 | $1,500.00 |
| 53 | Pipe underdrain 6-inch (612.0106) | LF | 185 | $33.42 | $30.00 | $14.00 |
| 54 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 580 | $34.16 | $30.00 | $16.00 |
| 55 | Apron endwalls for underdrain reinforced concrete 6-inch (612.0806) | EACH | 2 | $2,233.63 | $550.00 | $1,000.00 |
| 56 | Barrier system grading shaping finishing (614.0010) | EACH | 57 | $4,100.00 | $5,900.00 | $4,600.00 |
| 57 | Anchor assemblies for steel plate beam guard (614.0150) | EACH | 3 | $275.00 | $250.00 | $250.00 |
| 58 | Steel thrie beam structure approach (614.0200) | LF | 207 | $88.00 | $88.00 | $88.00 |
| 59 | Steel thrie beam bullnose terminal (614.0220) | EACH | 14 | $14,500 | $14,500 | $14,500 |
| 60 | Steel thrie beam (614.0230) | LF | 1,425 | $38.00 | $38.00 | $38.00 |
| 61 | Steel plate beam guard energy absorbing terminal (614.0370) | EACH | 10 | $3,700.00 | $3,700.00 | $3,700.00 |
| 62 | MGS guardrail 3 (614.2300) | LF | 5,662.50 | $27.00 | $27.00 | $27.00 |
| 63 | MGS guardrail 3 K (614.2330) | LF | 187.50 | $42.00 | $42.00 | $42.00 |
| 64 | MGS guardrail short radius (614.2350) | LF | 76 | $37.00 | $37.00 | $37.00 |
| 65 | MGS thrie beam transition (614.2500) | LF | 1,536.60 | $89.00 | $89.00 | $89.00 |
| 66 | MGS guardrail terminal eat (614.2610) | EACH | 37 | $3,700.00 | $3,700.00 | $3,700.00 |
| 67 | MGS guardrail terminal type 2 (614.2620) | EACH | 3 | $2,500.00 | $2,500.00 | $2,500.00 |
| 68 | MGS guardrail short radius terminal (614.2630) | EACH | 1 | $2,500.00 | $2,500.00 | $2,500.00 |
| 69 | Maintenance and repair of haul roads (project) 01. 6200-18-70 (618.0100) | EACH | 1 | $0.01 | $1.00 | $1.00 |
| 70 | Mobilization (619.1000) | EACH | 1 | $526,000 | $496,000 | $920,577 |
| 71 | Concrete median sloped nose (620.0300) | SF | 21 | $15.00 | $100.00 | $19.00 |
| 72 | Water (624.0100) | MGAL | 152 | $0.01 | $50.00 | $50.00 |
| 73 | Silt fence (628.1504) | LF | 2,060 | $2.00 | $2.00 | $2.00 |
| 74 | Silt fence maintenance (628.1520) | LF | 4,120 | $0.01 | $0.01 | $0.01 |
| 75 | Mobilizations erosion control (628.1905) | EACH | 8 | $100.00 | $100.00 | $100.00 |
| 76 | Mobilizations emergency erosion control (628.1910) | EACH | 6 | $100.00 | $100.00 | $100.00 |
| 77 | Erosion mat class I type A (628.2002) | SY | 516 | $1.50 | $1.50 | $1.50 |
| 78 | Inlet protection type A (628.7005) | EACH | 9 | $100.00 | $100.00 | $100.00 |
| 79 | Inlet protection type B (628.7010) | EACH | 5 | $60.00 | $60.00 | $60.00 |
| 80 | Inlet protection type C (628.7015) | EACH | 17 | $65.00 | $65.00 | $65.00 |
| 81 | Temporary ditch checks (628.7504) | LF | 720 | $8.50 | $8.50 | $8.50 |
| 82 | Sign supports structural steel HS (635.0200) | LB | 19,032 | $4.75 | $4.75 | $4.75 |
| 83 | Signs type I reflective SH (637.1220) | SF | 2,745.50 | $28.00 | $28.00 | $28.00 |
| 84 | Removing signs type I (638.2601) | EACH | 20 | $400.00 | $400.00 | $400.00 |
| 85 | Removing signs type II (638.2602) | EACH | 1 | $50.00 | $50.00 | $50.00 |
| 86 | Removing small sign supports (638.3000) | EACH | 3 | $50.00 | $50.00 | $50.00 |
| 87 | Removing structural steel sign supports (638.3100) | EACH | 28 | $400.00 | $400.00 | $400.00 |
| 88 | Field office type D (642.5401) | EACH | 1 | $13,000 | $20,000 | $22,000 |
| 89 | Traffic control drums (643.0300) | DAY | 82,728 | $0.15 | $0.15 | $0.15 |
| 90 | Digital speed reduction system (DSRS) (643.0370.S) | DAY | 191 | $280.00 | $280.00 | $280.00 |
| 91 | Traffic control barricades type III (643.0420) | DAY | 1,687 | $0.75 | $0.75 | $0.75 |
| 92 | Traffic control warning lights type A (643.0705) | DAY | 3,254 | $0.11 | $0.11 | $0.11 |
| 93 | Traffic control warning lights type C (643.0715) | DAY | 3,223 | $0.13 | $0.13 | $0.13 |
| 94 | Traffic control connected arrow boards (643.0810) | DAY | 382 | $20.00 | $20.00 | $20.00 |
| 95 | Traffic control signs (643.0900) | DAY | 14,087 | $0.30 | $0.30 | $0.30 |
| 96 | Traffic control covering signs type I (643.0910) | EACH | 1 | $200.00 | $200.00 | $200.00 |
| 97 | Traffic control covering signs type II (643.0920) | EACH | 22 | $90.00 | $90.00 | $90.00 |
| 98 | Traffic control signs fixed message (643.1000) | SF | 360 | $15.00 | $15.00 | $15.00 |
| 99 | Traffic control signs PCMS (643.1050) | DAY | 172 | $60.00 | $60.00 | $60.00 |
| 100 | Truck or trailer mounted attenuator (643.1055.S) | DAY | 105 | $2,500.00 | $275.00 | $1,275.00 |
| 101 | Basic traffic queue warning system (643.1205.S) | DAY | 573 | $39.00 | $39.00 | $39.00 |
| 102 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 382 | $13.00 | $13.00 | $13.00 |
| 103 | Traffic control (643.5000) | EACH | 1 | $128,000 | $128,000 | $128,000 |
| 104 | Temporary pedestrian barricade (644.1810) | LF | 132 | $4.00 | $4.00 | $4.00 |
| 105 | Geotextile type DF schedule A (645.0111) | SY | 50 | $5.50 | $10.00 | $5.00 |
| 106 | Marking line epoxy 4-inch (646.1020) | LF | 12,002 | $0.35 | $0.50 | $0.50 |
| 107 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 30,470 | $0.77 | $0.80 | $0.80 |
| 108 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 264,020 | $1.18 | $1.20 | $1.20 |
| 109 | Marking line grooved permanent tape 6-inch (646.2050) | LF | 30,791 | $6.79 | $6.70 | $6.70 |
| 110 | Marking line epoxy 8-inch (646.3020) | LF | 760 | $0.94 | $1.00 | $1.00 |
| 111 | Marking line grooved permanent tape 10-inch (646.4050) | LF | 11,984 | $11.40 | $11.50 | $11.50 |
| 112 | Marking symbol epoxy (646.5220) | EACH | 4 | $383.24 | $260.00 | $260.00 |
| 113 | Marking stop line epoxy 18-inch (646.6120) | LF | 64 | $16.50 | $17.00 | $17.00 |
| 114 | Cold weather marking epoxy 6-inch (646.6466) | LF | 30,791 | $0.01 | $0.33 | $0.33 |
| 115 | Marking curb epoxy (646.8120) | LF | 16 | $7.91 | $22.00 | $22.00 |
| 116 | Marking island nose epoxy (646.8220) | EACH | 1 | $295.74 | $350.00 | $350.00 |
| 117 | Marking parking stall epoxy (646.8320) | LF | 2,495 | $3.90 | $4.50 | $4.50 |
| 118 | Marking removal plowable raised pavement markers (646.9400) | EACH | 889 | $30.00 | $25.00 | $64.00 |
| 119 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 771 | $0.25 | $0.25 | $0.25 |
| 120 | Construction staking resurfacing reference (650.8000) | LF | 129,602 | $0.09 | $0.09 | $0.09 |
| 121 | Construction staking curb ramps (650.9000) | EACH | 4 | $250.00 | $250.00 | $250.00 |
| 122 | Construction staking sidewalk (project) 01. 6200-18-70 (650.9500) | EACH | 1 | $100.00 | $100.00 | $100.00 |
| 123 | Construction staking supplemental control (project) 01. 6200-18-70 (650.9911) | EACH | 1 | $10.00 | $10.00 | $10.00 |
| 124 | Construction staking slope stakes (650.9920) | LF | 8,827 | $0.90 | $0.90 | $0.90 |
| 125 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 45 | $12.00 | $12.00 | $12.00 |
| 126 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 20 | $14.00 | $14.00 | $14.00 |
| 127 | Concrete bases type 1 (654.0101) | EACH | 4 | $1,750.00 | $1,750.00 | $1,750.00 |
| 128 | Cable traffic signal 5-14 AWG (655.0230) | LF | 2,166 | $3.75 | $3.75 | $3.75 |
| 129 | Electrical wire lighting 10 AWG (655.0615) | LF | 2,450 | $1.20 | $1.20 | $1.20 |
| 130 | Electrical service meter breaker pedestal (location) 01. F70-0431 (45 & II) (656.0201) | EACH | 1 | $1,950.00 | $1,950.00 | $1,950.00 |
| 131 | Electrical service meter breaker pedestal (location) 02. ush 45 & STH 116 park & ride (656.0201) | EACH | 1 | $1,950.00 | $1,950.00 | $1,950.00 |
| 132 | Pedestal bases (657.0100) | EACH | 4 | $345.00 | $345.00 | $345.00 |
| 133 | Traffic signal standards aluminum 13-FT (657.0420) | EACH | 4 | $675.00 | $675.00 | $675.00 |
| 134 | Traffic signal face 1S 12-inch (658.0171) | EACH | 4 | $450.00 | $450.00 | $450.00 |
| 135 | Signal mounting hardware (location) 01. F70-0431 (45 & II) (658.5070) | EACH | 1 | $1,000.00 | $1,000.00 | $1,000.00 |
| 136 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 4 | $75.00 | $75.00 | $75.00 |
| 137 | Sawing asphalt (690.0150) | LF | 1,330 | $2.00 | $1.75 | $1.75 |
| 138 | Sawing concrete (690.0250) | LF | 65,828 | $2.25 | $4.05 | $2.05 |
| 139 | Incentive strength concrete structures (715.0502) | DOL | 1,000 | $1.00 | $1.00 | $1.00 |
| 140 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 | $1.00 | $1.00 |
| 141 | Incentive iri ride (740.0440) | DOL | 19,705 | $1.00 | $1.00 | $1.00 |
| 142 | Special 01. steel cast-in-place pile spot cleaning and painting B-70- 212 (SPV.0060) | EACH | 40 | $2,500.00 | $2,500.00 | $2,500.00 |
| 143 | Special 02. steel cast-in-place pile spot cleaning and painting B-70- 213 (SPV.0060) | EACH | 32 | $2,500.00 | $2,500.00 | $2,500.00 |
| 144 | Special 03. concrete control cabinet bases type 10 NE region special (SPV.0060) | EACH | 2 | $2,400.00 | $2,400.00 | $2,400.00 |
| 145 | Special 04. removing electrical service (ush 45 & STH 116) (SPV.0060) | EACH | 1 | $1,000.00 | $1,000.00 | $1,000.00 |
| 146 | Special 05. remove traffic signal F70-0431 (45 & II) (SPV.0060) | EACH | 1 | $2,500.00 | $2,500.00 | $2,500.00 |
| 147 | Special 01. joint sealing (SPV.0090) | LF | 3,523 | $3.00 | $3.00 | $6.50 |
| 148 | Special 01. fiber wrap reinforcing non-structural (SPV.0165) | SF | 14 | $285.00 | $350.00 | $350.00 |
| 149 | Special 01. traffic bond limestone 3/8-inch (SPV.0195) | TON | 35 | $50.00 | $200.00 | $45.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of October 13, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.