WisDOT contract 20261013016 bid tabulation

Adams - Wisconsin Rapids; STH 13/Apache Avenue Intersection (STH 013, Adams County Adams - Wisconsin Rapids; STH 13/Apache Avenue Intersection). Let by Wisconsin DOT on October 13, 2026, Adams. 4 bids received; low bid $382,740 by Hoffman Construction Company.

Owner
Wisconsin DOT
Letting
13 OCT 2026
Pay items
50
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Hoffman Construction Company$382,740Low
2S & N Incorporated$391,743+2.0%
3Earth, Inc.$428,361+12%
4James Peterson Sons, Inc.$444,717+16%
WisDOT contract 20261013016: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Hoffman Construction Company2. S & N Incorporated3. Earth, Inc.4. James Peterson Sons, Inc.
1Removing curb & gutter (204.0150)LF67$20.00$10.00$20.00$25.00
2Removing (item description) 01. asphaltic flume (204.9060.S)EACH1$500.00$250.00$1,000.00$750.00
3Excavation common (205.0100)CY2,208$30.00$32.25$25.00$39.56
4Finishing roadway (project) 01. 6140-02-72 (213.0100)EACH1$500.00$750.00$2,500.00$2,500.00
5Base aggregate dense 3/4-inch (305.0110)TON81$80.00$38.50$38.00$55.12
6Base aggregate dense 1 1/4-inch (305.0120)TON2,210$35.00$27.21$24.70$29.63
7Tack coat (455.0605)GAL144$10.40$10.40$12.00$10.40
8Incentive density HMA pavement (460.2000)DOL450$1.00$1.00$1.00$1.00
9HMA pavement 4 MT 58-28 S (460.6224)TON672$138.90$138.90$158.00$138.90
10Asphaltic surface temporary (465.0125)TON29$230.82$230.82$300.00$230.82
11Asphaltic flumes (465.0315)SY20$84.80$84.80$100.00$84.80
12Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557)LF154$76.89$76.89$65.00$76.89
13Maintenance and repair of haul roads (project) 01. 6140-02-72 (618.0100)EACH1$500.00$100.00$500.00$150.00
14Mobilization (619.1000)EACH1$44,790$58,490$60,000$75,000
15Water (624.0100)MGAL34$150.00$60.00$50.00$100.00
16Topsoil (625.0100)SY2,652$2.00$4.95$5.00$8.33
17Mulching (627.0200)SY2,076$0.75$0.75$1.00$0.75
18Silt fence (628.1504)LF420$4.00$4.00$3.25$4.00
19Silt fence maintenance (628.1520)LF420$0.01$0.01$0.10$0.01
20Mobilizations erosion control (628.1905)EACH3$350.00$350.00$380.00$350.00
21Mobilizations emergency erosion control (628.1910)EACH3$250.00$250.00$300.00$250.00
22Erosion mat urban class I type B (628.2008)SY570$4.00$4.00$5.00$4.00
23Temporary ditch checks (628.7504)LF30$9.50$9.50$15.00$9.50
24Fertilizer type A (629.0205)CWT0.16$500.00$500.00$280.00$500.00
25Seeding mixture no. 40 (630.0140)LB117$8.50$8.50$12.00$8.50
26Seed water (630.0500)MGAL45$5.00$5.00$50.00$5.00
27Field office type B (642.5001)EACH1$500.00$5,000.00$12,000$5,000.00
28Traffic control drums (643.0300)DAY1,748$1.00$1.00$1.10$1.00
29Traffic control barricades type III (643.0420)DAY288$2.00$2.00$2.25$2.00
30Traffic control warning lights type A (643.0705)DAY144$0.25$0.25$0.35$0.25
31Traffic control warning lights type C (643.0715)DAY240$0.35$0.35$0.45$0.35
32Traffic control signs (643.0900)DAY442$3.50$3.50$3.60$3.50
33Traffic control signs fixed message (643.1000)SF36$10.60$10.60$20.00$10.60
34Temporary marking line removable tape 6-inch (643.3180)LF6,580$1.90$1.90$2.10$1.90
35Temporary marking stop line removable tape 18-inch (643.3850)LF59$5.25$5.25$6.00$5.25
36Traffic control (643.5000)EACH1$4,150.00$4,150.00$22,000$4,150.00
37Marking line grooved wet ref epoxy 6-inch (646.2040)LF5,521$1.75$1.75$1.80$1.75
38Marking line grooved wet ref epoxy 10-inch (646.4040)LF1,455$3.30$3.30$3.35$3.30
39Marking stop line epoxy 18-inch (646.6120)LF50$15.00$15.00$20.00$15.00
40Marking chevron epoxy 12-inch (646.7320)LF271$11.00$11.00$12.00$11.00
41Marking removal line 4-inch (646.9000)LF4,898$0.40$0.40$0.45$0.40
42Construction staking subgrade (650.4500)LF857$0.01$0.01$1.50$0.01
43Construction staking base (650.5000)LF857$0.01$1.00$1.50$1.00
44Construction staking curb gutter and curb & gutter (650.5500)LF154$5.00$2.50$3.00$2.50
45Construction staking supplemental control (project) 01. 6140-02-72 (650.9911)EACH1$750.00$1,200.00$5,000.00$1,200.00
46Construction staking slope stakes (650.9920)LF857$0.01$1.30$1.50$1.30
47Public land survey monument verify and reset (680.0100)EACH1$750.00$1,000.00$1,000.00$1,000.00
48Sawing asphalt (690.0150)LF958$1.49$1.96$4.50$1.96
49On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS300$5.00$5.00$5.00$5.00
50On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS600$5.00$5.00$5.00$5.00
WisDOT contract 20261013016: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of October 13, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy