| 1 | Clearing (201.0105) | STA | 11 | $0.01 | $1,285.00 |
| 2 | Grubbing (201.0205) | STA | 11 | $0.01 | $395.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 28 | $1,697.14 | $1,697.14 |
| 4 | Removing asphaltic surface (204.0110) | SY | 1,351 | $8.23 | $8.23 |
| 5 | Removing asphaltic surface butt joints (204.0115) | SY | 1,446 | $18.10 | $4.55 |
| 6 | Removing asphaltic surface milling (204.0120) | SY | 33,772 | $1.60 | $0.60 |
| 7 | Removing curb & gutter (204.0150) | LF | 2,185 | $10.00 | $10.00 |
| 8 | Removing concrete sidewalk (204.0155) | SY | 507 | $27.00 | $27.00 |
| 9 | Removing guardrail (204.0165) | LF | 2,806 | $1.93 | $1.93 |
| 10 | Removing (item description) 01. concrete curb head (204.9090.S) | LF | 42 | $10.00 | $25.00 |
| 11 | Excavation common (205.0100) | CY | 6,288 | $0.01 | $0.01 |
| 12 | Backfill granular grade 1 (209.1100) | CY | 2,348 | $0.01 | $0.01 |
| 13 | Prepare foundation for asphaltic paving (project) 01. 4322-10-71 (211.0101) | EACH | 1 | $101,350 | $22,684 |
| 14 | Prepare foundation for cir base layer (project) 01. 4322-10-71 (211.0700.S) | EACH | 1 | $8,975.00 | $14,300 |
| 15 | Base repair for cir layer (211.0800.S) | CY | 270 | $85.00 | $83.20 |
| 16 | Base aggregate dense 3/4-inch (305.0110) | TON | 4,923 | $26.15 | $25.80 |
| 17 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 5,685 | $18.64 | $18.64 |
| 18 | Shaping shoulders (305.0500) | STA | 706 | $5.90 | $33.00 |
| 19 | Cir asphaltic base layer (327.1000.S) | SY | 121,157 | $5.71 | $5.64 |
| 20 | Drilled tie bars (416.0610) | EACH | 100 | $8.00 | $18.51 |
| 21 | Tack coat (455.0605) | GAL | 20,627 | $3.00 | $1.05 |
| 22 | Asphalt stabilizing agent (455.0770.S) | TON | 573 | $169.00 | $169.00 |
| 23 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $2,840.00 | $2,437.00 |
| 24 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 1 | $3,860.00 | $3,118.00 |
| 25 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 27,922 | $71.35 | $82.20 |
| 26 | HMA pavement 4 MT 58-28 H (460.6424) | TON | 1,011 | $94.30 | $93.35 |
| 27 | Asphaltic surface (465.0105) | TON | 1,013 | $162.45 | $188.00 |
| 28 | Asphaltic surface patching (465.0110) | TON | 88 | $248.00 | $433.00 |
| 29 | Asphaltic surface driveways and field entrances (465.0120) | TON | 211 | $180.00 | $188.00 |
| 30 | Asphaltic flumes (465.0315) | SY | 77 | $78.20 | $63.50 |
| 31 | Asphaltic rumble strips, shoulder (465.0520) | LF | 14,371 | $0.32 | $0.17 |
| 32 | Asphaltic rumble strips, centerline (465.0560) | LF | 35,060 | $0.32 | $0.17 |
| 33 | Asphaltic rumble strips, transverse (465.0580) | SY | 79 | $53.00 | $40.00 |
| 34 | Culvert pipe reinforced concrete class III 24-inch (522.0124) | LF | 1,490 | $121.79 | $121.79 |
| 35 | Culvert pipe reinforced concrete class III 30-inch (522.0130) | LF | 57 | $167.10 | $167.10 |
| 36 | Culvert pipe reinforced concrete class III 36-inch (522.0136) | LF | 172 | $191.55 | $191.55 |
| 37 | Culvert pipe reinforced concrete class IV 24-inch (522.0424) | LF | 212 | $130.41 | $130.41 |
| 38 | Culvert pipe reinforced concrete class IV 30-inch (522.0430) | LF | 60 | $174.10 | $174.10 |
| 39 | Culvert pipe reinforced concrete class IV 36-inch (522.0436) | LF | 111 | $212.65 | $212.65 |
| 40 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 46 | $2,557.15 | $2,557.15 |
| 41 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 4 | $3,296.88 | $3,296.88 |
| 42 | Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036) | EACH | 6 | $4,057.43 | $4,057.43 |
| 43 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 591 | $68.00 | $88.00 |
| 44 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 1,571 | $31.00 | $25.85 |
| 45 | Concrete curb & gutter 4-inch sloped 30-inch type TBT (601.0584) | LF | 23 | $80.00 | $75.00 |
| 46 | Concrete curb pedestrian (601.0600) | LF | 9 | $55.00 | $99.00 |
| 47 | Concrete sidewalk 5-inch (602.0410) | SF | 4,758 | $14.20 | $9.30 |
| 48 | Curb ramp detectable warning field yellow (602.0505) | SF | 336 | $36.00 | $38.00 |
| 49 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 42 | $60.00 | $68.00 |
| 50 | Riprap medium (606.0200) | CY | 7 | $250.00 | $250.00 |
| 51 | Inlet covers type V (611.0654) | EACH | 1 | $805.75 | $805.75 |
| 52 | Adjusting inlet covers (611.8115) | EACH | 1 | $300.00 | $300.00 |
| 53 | MGS guardrail 3 (614.2300) | LF | 2,741 | $26.53 | $26.53 |
| 54 | MGS guardrail short radius (614.2350) | LF | 81 | $30.00 | $30.00 |
| 55 | MGS thrie beam transition (614.2500) | LF | 320 | $88.00 | $88.00 |
| 56 | MGS guardrail terminal eat (614.2610) | EACH | 10 | $3,333.00 | $3,333.00 |
| 57 | MGS guardrail short radius terminal (614.2630) | EACH | 4 | $1,903.00 | $1,903.00 |
| 58 | Fence safety (616.0700.S) | LF | 1,000 | $4.73 | $4.73 |
| 59 | Maintenance and repair of haul roads (project) 01. 4322-10-71 (618.0100) | EACH | 1 | $1.00 | $0.01 |
| 60 | Mobilization (619.1000) | EACH | 1 | $389,225 | $289,266 |
| 61 | Dust control surface treatment (623.0200) | SY | 33,836 | $0.01 | $0.15 |
| 62 | Water (624.0100) | MGAL | 43 | $105.00 | $82.00 |
| 63 | Salvaged topsoil (625.0500) | SY | 11,200 | $2.19 | $2.19 |
| 64 | Silt fence (628.1504) | LF | 7,817 | $1.65 | $1.65 |
| 65 | Silt fence maintenance (628.1520) | LF | 7,817 | $0.03 | $0.03 |
| 66 | Mobilizations erosion control (628.1905) | EACH | 6 | $293.00 | $293.00 |
| 67 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $403.00 | $403.00 |
| 68 | Erosion mat urban class I type A (628.2006) | SY | 12,700 | $1.70 | $1.70 |
| 69 | Inlet protection type C (628.7015) | EACH | 34 | $60.00 | $60.00 |
| 70 | Inlet protection type D (628.7020) | EACH | 16 | $200.00 | $200.00 |
| 71 | Culvert pipe checks (628.7555) | EACH | 160 | $15.00 | $15.00 |
| 72 | Fertilizer type B (629.0210) | CWT | 19 | $95.00 | $95.00 |
| 73 | Seeding mixture no. 30 (630.0130) | LB | 380 | $6.73 | $6.73 |
| 74 | Seeding mixture no. 40 (630.0140) | LB | 140 | $7.03 | $7.03 |
| 75 | Seeding temporary (630.0200) | LB | 110 | $5.03 | $5.03 |
| 76 | Seeding nurse crop (630.0400) | LB | 37 | $25.00 | $25.00 |
| 77 | Seed water (630.0500) | MGAL | 210 | $5.00 | $5.00 |
| 78 | Markers culvert end (633.5200) | EACH | 56 | $70.00 | $70.00 |
| 79 | Posts tubular steel 2X2-inch X 8-FT (634.0808) | EACH | 1 | $285.00 | $285.00 |
| 80 | Signs type II reflective H (637.2210) | SF | 5.50 | $30.00 | $30.00 |
| 81 | Field office type C (642.5201) | EACH | 1 | $13,460 | $16,663 |
| 82 | Traffic control drums (643.0300) | DAY | 14,050 | $0.15 | $0.22 |
| 83 | Traffic control barricades type III (643.0420) | DAY | 3,580 | $0.45 | $0.60 |
| 84 | Traffic control warning lights type A (643.0705) | DAY | 6,816 | $0.10 | $0.15 |
| 85 | Traffic control warning lights type C (643.0715) | DAY | 819 | $0.10 | $0.15 |
| 86 | Traffic control signs (643.0900) | DAY | 16,294 | $0.25 | $0.55 |
| 87 | Traffic control covering signs type II (643.0920) | EACH | 32 | $45.00 | $52.00 |
| 88 | Traffic control signs fixed message (643.1000) | SF | 78 | $15.00 | $30.00 |
| 89 | Traffic control signs PCMS (643.1050) | DAY | 47 | $45.00 | $55.00 |
| 90 | Traffic control cones 42-inch (643.1070) | DAY | 1,194 | $0.50 | $0.40 |
| 91 | Temporary marking line paint 6- inch (643.3165) | LF | 107,550 | $0.43 | $0.51 |
| 92 | Temporary marking crosswalk removable tape 6-inch (643.3350) | LF | 441 | $1.40 | $2.10 |
| 93 | Traffic control (643.5000) | EACH | 1 | $49,950 | $40,000 |
| 94 | Temporary pedestrian surface plate (644.1430) | SF | 600 | $8.00 | $10.00 |
| 95 | Temporary pedestrian surface matting (644.1440) | SF | 1,380 | $5.00 | $5.00 |
| 96 | Temporary pedestrian curb ramp (644.1601) | DAY | 336 | $5.00 | $5.00 |
| 97 | Temporary pedestrian detectable warning field (644.1605) | SF | 240 | $8.00 | $6.00 |
| 98 | Temporary pedestrian barricade (644.1810) | LF | 2,430 | $4.50 | $4.00 |
| 99 | Temporary audible message devices (644.1900.S) | DAY | 742 | $3.25 | $3.00 |
| 100 | Geotextile type HR (645.0120) | SY | 19 | $10.00 | $10.00 |
| 101 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 109,058 | $1.16 | $1.24 |
| 102 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 459 | $2.20 | $2.75 |
| 103 | Marking arrow epoxy (646.5020) | EACH | 12 | $250.00 | $225.00 |
| 104 | Marking stop line epoxy 18-inch (646.6120) | LF | 100 | $16.00 | $13.81 |
| 105 | Marking dotted extension epoxy 18-inch (646.6320) | LF | 86 | $16.00 | $20.00 |
| 106 | Marking diagonal epoxy 12-inch (646.7120) | LF | 147 | $9.00 | $9.21 |
| 107 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 1,090 | $14.00 | $11.64 |
| 108 | Marking crosswalk epoxy block style 24-inch (646.7520) | LF | 80 | $35.00 | $18.41 |
| 109 | Marking curb epoxy (646.8120) | LF | 40 | $25.00 | $7.68 |
| 110 | Marking island nose epoxy (646.8220) | EACH | 4 | $340.00 | $304.00 |
| 111 | Construction staking subgrade (650.4500) | LF | 280 | $0.01 | $2.00 |
| 112 | Construction staking base (650.5000) | LF | 280 | $0.55 | $0.55 |
| 113 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 2,194 | $1.25 | $1.25 |
| 114 | Construction staking pipe culverts (650.6000) | EACH | 28 | $100.00 | $100.00 |
| 115 | Construction staking resurfacing reference (650.8000) | LF | 41,365 | $0.10 | $0.10 |
| 116 | Construction staking curb ramps (650.9000) | EACH | 24 | $170.00 | $170.00 |
| 117 | Construction staking sidewalk (project) 01. 4322-10-71 (650.9500) | EACH | 1 | $100.00 | $100.00 |
| 118 | Construction staking supplemental control (project) 01. 4322-10-71 (650.9911) | EACH | 1 | $10.00 | $10.00 |
| 119 | Construction staking slope stakes (650.9920) | LF | 1,903 | $1.00 | $1.00 |
| 120 | Sawing asphalt (690.0150) | LF | 2,625 | $1.89 | $2.05 |
| 121 | Sawing concrete (690.0250) | LF | 181 | $2.50 | $2.75 |
| 122 | Incentive iri ride (740.0440) | DOL | 62,682 | $1.00 | $1.00 |
| 123 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,000 | $5.00 | $5.00 |
| 124 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 2,400 | $5.00 | $5.00 |
| 125 | Special 01. foundation backfill (SPV.0035) | CY | 1,406 | $40.31 | $40.31 |
| 126 | Special 01. incentive density PWL HMA pavement (SPV.0055) | DOL | 12,921 | $1.00 | $1.00 |
| 127 | Special 02. incentive air voids HMA pavement (SPV.0055) | DOL | 28,933 | $1.00 | $1.00 |
| 128 | Special 03. incentive density HMA pavement longitudinal joints (SPV.0055) | DOL | 8,250 | $1.00 | $1.00 |
| 129 | Special 01. removing distressed asphaltic surface milling (SPV.0180) | SY | 1,000 | $5.75 | $6.45 |