WisDOT contract 20261110021 bid tabulation

Iola - STH 22/110; STH 49 SB to STH 110 (STH 161, Waupaca County Iola - STH 22/110). Let by Wisconsin DOT on November 10, 2026, Waupaca. 2 bids received; low bid $3,479,915 by American Asphalt of Wisconsin.

Owner
Wisconsin DOT
Letting
10 NOV 2026
Pay items
152
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1American Asphalt of Wisconsin$3,479,915Low
2Northeast Asphalt, Inc$3,558,262+2.0%
WisDOT contract 20261110021: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. American Asphalt of Wisconsin2. Northeast Asphalt, Inc
1Grubbing (201.0205)STA2$850.00$500.00
2Removing small pipe culverts (203.0100)EACH8$500.00$750.00
3Removing structure (structure) 01. cattle pass (203.0220)EACH1$3,600.00$2,500.00
4Removing concrete pavement (204.0100)SY34$18.00$20.00
5Removing asphaltic surface (204.0110)SY824$4.95$6.00
6Removing asphaltic surface butt joints (204.0115)SY927$3.68$8.50
7Removing asphaltic surface milling (204.0120)SY156,100$0.42$0.95
8Removing curb (204.0130)LF104$6.50$6.00
9Removing curb & gutter (204.0150)LF3,032$6.50$6.00
10Removing concrete sidewalk (204.0155)SY147$18.00$10.00
11Removing guardrail (204.0165)LF1,679$2.00$3.00
12Removing delineators and markers (204.0180)EACH10$35.00$50.00
13Removing storm sewer (size) 01. 12-inch (204.0245)LF8$20.00$50.00
14Removing (item description) 01. apron endwalls for culvert pipe reinforced concrete (204.9060.S)EACH1$750.00$350.00
15Excavation common (205.0100)CY1,785$21.65$20.00
16Borrow (208.0100)CY394$23.50$1.00
17Prepare foundation for asphaltic paving (project) 01. 6260-00-72 (211.0101)EACH1$23,750$30,310
18Prepare foundation for asphaltic shoulders (211.0400)STA963$54.00$96.75
19Finishing roadway (project) 01. 6260-00-72 (213.0100)EACH1$1,700.00$2,950.00
20Base aggregate dense 3/4-inch (305.0110)TON3,592$28.25$28.00
21Base aggregate dense 1 1/4-inch (305.0120)TON1,560$28.05$27.50
22HMA cold weather paving (450.4000)TON4,600$0.01$0.01
23Tack coat (455.0605)GAL12,180$4.00$3.00
24HMA percent within limits (PWL) test strip volumetrics (460.0105.S)EACH1$5,000.00$2,250.00
25HMA percent within limits (PWL) test strip density (460.0110.S)EACH1$5,000.00$3,250.00
26Incentive density PWL HMA pavement (460.2005)DOL14,750$1.00$1.00
27Incentive density HMA pavement longitudinal joints (460.2007)DOL11,490$1.00$1.00
28Incentive air voids HMA pavement (460.2010)DOL18,400$1.00$1.00
29HMA pavement 4 LT 58-28 S (460.5224)TON18,320$75.76$71.10
30Asphaltic surface (465.0105)TON828$104.56$103.90
31Asphaltic surface patching (465.0110)TON2,330$83.40$78.50
32Asphaltic surface driveways and field entrances (465.0120)TON4$234.88$495.00
33Asphaltic surface safety islands (465.0305)TON45$120.68$109.90
34Asphaltic flumes (465.0315)SY28$60.00$73.10
35Asphaltic rumble strips, centerline (465.0560)LF47,480$0.46$0.30
36Apron endwalls for culvert pipe 24- inch (520.1024)EACH2$750.00$685.50
37Culvert pipe class III-A non-metal 24-inch (520.3424)LF48$119.65$125.50
38Concrete collars for pipe (520.8000)EACH2$950.00$1,200.00
39Cleaning culvert pipes (520.8700)EACH3$853.00$2,000.00
40Apron endwalls for culvert pipe steel 18-inch (521.1018)EACH2$450.00$504.00
41Apron endwalls for culvert pipe steel 30-inch (521.1030)EACH2$985.00$1,009.40
42Culvert pipe corrugated steel 18- inch (521.3118)LF34$59.60$126.71
43Culvert pipe reinforced concrete class IV 24-inch (522.0424)LF48$201.00$157.83
44Culvert pipe reinforced concrete class IV 30-inch (522.0430)LF40$285.05$202.87
45Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012)EACH1$1,500.00$1,450.00
46Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024)EACH3$1,460.00$1,750.00
47Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030)EACH2$1,720.00$1,987.50
48Culvert pipe reinforced concrete horizontal elliptical class HE-IV 19X30-inch (522.2419)LF232$237.90$183.96
49Culvert pipe reinforced concrete horizontal elliptical class HE-IV 24X38-inch (522.2424)LF120$246.00$247.39
50Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619)EACH12$1,650.00$1,814.25
51Culvert pipe corrugated polyethylene 30-inch (530.0130)LF49$212.55$138.67
52Concrete curb type D (601.0110)LF89$54.85$54.28
53Concrete curb & gutter 30-inch type D (601.0411)LF3,032$37.69$37.30
54Concrete curb pedestrian (601.0600)LF28$54.85$54.28
55Concrete sidewalk 4-inch (602.0405)SF1,312$15.34$15.18
56Curb ramp detectable warning field yellow (602.0505)SF48$60.98$60.34
57Curb ramp detectable warning field radial yellow (602.0605)SF95$68.56$67.84
58Concrete driveway 6-inch (602.0810)SY38$90.49$89.54
59Riprap medium (606.0200)CY63$175.00$180.00
60Riprap heavy (606.0300)CY18$195.00$95.00
61Storm sewer pipe reinforced concrete class III 12-inch (608.0312)LF4$493.00$315.00
62Reconstructing manholes (611.0420)EACH1$2,750.00$3,000.00
63Reconstructing inlets (611.0430)EACH15$900.00$1,000.00
64Barrier system grading shaping finishing (614.0010)EACH14$4,268.80$3,500.00
65Guardrail mow strip emulsified asphalt (614.0397)SY632$18.53$15.10
66MGS guardrail 3 (614.2300)LF966.25$26.93$28.00
67MGS guardrail 3 K (614.2330)LF337.50$42.00$48.00
68MGS thrie beam transition (614.2500)LF480$88.00$92.00
69MGS guardrail terminal eat (614.2610)EACH16$3,333.00$4,800.00
70Maintenance and repair of haul roads (project) 01. 6260-00-72 (618.0100)EACH1$100.00$1.00
71Mobilization (619.1000)EACH1$38,875$229,500
72Concrete median sloped nose (620.0300)SF39$13.99$13.85
73Water (624.0100)MGAL78$10.00$1.00
74Topsoil (625.0100)SY2,705$6.70$2.00
75Silt fence (628.1504)LF8,900$1.63$1.50
76Silt fence maintenance (628.1520)LF8,900$0.03$0.01
77Mobilizations erosion control (628.1905)EACH6$193.00$1.00
78Mobilizations emergency erosion control (628.1910)EACH3$303.00$1.00
79Erosion mat urban class I type B (628.2008)SY2,705$1.90$3.00
80Inlet protection type A (628.7005)EACH2$100.00$200.00
81Inlet protection type C (628.7015)EACH15$75.00$100.00
82Temporary ditch checks (628.7504)LF440$6.00$3.00
83Culvert pipe checks (628.7555)EACH100$15.00$4.00
84Rock bags (628.7570)EACH440$6.00$4.00
85Fertilizer type B (629.0210)CWT2$100.00$150.00
86Seeding mixture no. 30 (630.0130)LB75$12.00$10.00
87Seeding mixture no. 40 (630.0140)LB57$12.00$10.00
88Seeding temporary (630.0200)LB83$7.00$4.00
89Seed water (630.0500)MGAL197$5.00$0.01
90Markers culvert end (633.5200)EACH28$70.00$100.00
91Posts wood 4X6-inch X 12-FT (634.0612)EACH12$90.00$200.00
92Posts wood 4X6-inch X 16-FT (634.0616)EACH3$98.00$200.00
93Posts wood 4X6-inch X 18-FT (634.0618)EACH2$100.00$200.00
94Moving signs type II (638.2102)EACH17$100.00$100.00
95Removing signs type II (638.2602)EACH2$50.00$100.00
96Removing small sign supports (638.3000)EACH2$50.00$100.00
97Field office type C (642.5201)EACH1$7,390.00$12,965
98Traffic control drums (643.0300)DAY6,245$0.25$0.25
99Traffic control barricades type III (643.0420)DAY853$0.75$0.75
100Traffic control warning lights type A (643.0705)DAY1,706$0.11$0.11
101Traffic control warning lights type C (643.0715)DAY396$0.13$0.13
102Traffic control signs (643.0900)DAY13,451$0.50$0.50
103Traffic control covering signs type II (643.0920)EACH22$125.00$125.00
104Traffic control signs PCMS (643.1050)DAY69$45.00$45.00
105Temporary marking line paint 6- inch (643.3165)LF77,395$0.50$0.50
106Temporary marking line removable tape 6-inch (643.3180)LF60$4.25$4.25
107Temporary marking line paint 10- inch (643.3265)LF310$1.00$1.00
108Temporary marking crosswalk paint 6-inch (643.3305)LF768$9.00$9.00
109Traffic control (643.5000)EACH1$24,000$24,000
110Temporary pedestrian surface plate (644.1430)SF290$10.00$10.00
111Temporary pedestrian surface matting (644.1440)SF854$4.00$4.00
112Temporary pedestrian curb ramp (644.1601)DAY220$8.00$8.00
113Temporary pedestrian detectable warning field (644.1605)SF180$8.00$8.00
114Temporary pedestrian barricade (644.1810)LF1,226$4.00$4.00
115Geotextile type HR (645.0120)SY240$5.00$6.00
116Marking line epoxy 6-inch (646.2020)LF573$0.70$0.70
117Marking line grooved wet ref epoxy 6-inch (646.2040)LF172,537$1.07$1.07
118Marking line grooved wet ref epoxy 10-inch (646.4040)LF1,132$2.00$2.00
119Marking arrow epoxy (646.5020)EACH27$280.00$280.00
120Marking word epoxy (646.5120)EACH2$350.00$350.00
121Cold weather marking epoxy 6-inch (646.6466)LF173,110$0.31$0.31
122Cold weather marking epoxy 10- inch (646.6470)LF1,132$0.47$0.47
123Marking diagonal epoxy 12-inch (646.7120)LF112$17.00$17.00
124Marking crosswalk epoxy transverse line 6-inch (646.7420)LF132$15.00$15.00
125Marking curb epoxy (646.8120)LF30$20.00$20.00
126Marking island nose epoxy (646.8220)EACH3$340.00$340.00
127Marking removal line 6-inch (646.9002)LF3,134$1.15$1.15
128Marking removal line 10-inch (646.9102)LF106$2.70$2.70
129Marking removal line wide (646.9200)LF120$4.00$4.00
130Marking removal special marking (646.9300)EACH28$100.00$100.00
131Construction staking curb gutter and curb & gutter (650.5500)LF3,035$0.62$0.62
132Construction staking pipe culverts (650.6000)EACH13$135.00$135.00
133Construction staking resurfacing reference (650.8000)LF54,320$0.12$0.12
134Construction staking curb ramps (650.9000)EACH9$135.00$135.00
135Construction staking sidewalk (project) 01. 6260-00-72 (650.9500)EACH1$600.00$600.00
136Construction staking supplemental control (project) 01. 6260-00-72 (650.9911)EACH1$850.00$850.00
137Public land survey monument verify and reset (680.0100)EACH14$800.00$800.00
138Sawing asphalt (690.0150)LF4,063$3.96$1.49
139Sawing concrete (690.0250)LF193$6.09$2.24
140Incentive iri ride (740.0440)DOL43,450$1.00$1.00
141On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,000$5.00$5.00
142On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS1,260$5.00$5.00
143Special 01. fertilizer for lawn type turf (SPV.0030)CWT1$125.00$150.00
144Special 01. removing excess shoulder material (SPV.0035)CY2,200$29.30$0.01
145Special 01. cleaning inlets (SPV.0060)EACH2$800.00$750.00
146Special 02. inlet covers type H-D (SPV.0060)EACH2$1,150.00$1,115.50
147Special 03. apron endwalls for culvert pipe sloped cross drains steel 24X38-inch 4:1 (SPV.0060)EACH6$3,325.00$3,950.00
148Special 01. ditch cleaning (SPV.0090)LF100$27.50$20.00
149Special 02. maintaining exclusion fence (SPV.0090)LF5,300$1.00$0.50
150Special 03. remove, salvage and reinstall fence (SPV.0090)LF142$15.00$15.00
151Special 01. removing distressed asphaltic surface milling (SPV.0180)SY11,570$6.12$3.45
152Special 01. infill riprap (SPV.0195)TON33$80.00$50.00
WisDOT contract 20261110021: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of November 10, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy