| 1 | Grubbing (201.0205) | STA | 2 | $850.00 | $500.00 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 8 | $500.00 | $750.00 |
| 3 | Removing structure (structure) 01. cattle pass (203.0220) | EACH | 1 | $3,600.00 | $2,500.00 |
| 4 | Removing concrete pavement (204.0100) | SY | 34 | $18.00 | $20.00 |
| 5 | Removing asphaltic surface (204.0110) | SY | 824 | $4.95 | $6.00 |
| 6 | Removing asphaltic surface butt joints (204.0115) | SY | 927 | $3.68 | $8.50 |
| 7 | Removing asphaltic surface milling (204.0120) | SY | 156,100 | $0.42 | $0.95 |
| 8 | Removing curb (204.0130) | LF | 104 | $6.50 | $6.00 |
| 9 | Removing curb & gutter (204.0150) | LF | 3,032 | $6.50 | $6.00 |
| 10 | Removing concrete sidewalk (204.0155) | SY | 147 | $18.00 | $10.00 |
| 11 | Removing guardrail (204.0165) | LF | 1,679 | $2.00 | $3.00 |
| 12 | Removing delineators and markers (204.0180) | EACH | 10 | $35.00 | $50.00 |
| 13 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 8 | $20.00 | $50.00 |
| 14 | Removing (item description) 01. apron endwalls for culvert pipe reinforced concrete (204.9060.S) | EACH | 1 | $750.00 | $350.00 |
| 15 | Excavation common (205.0100) | CY | 1,785 | $21.65 | $20.00 |
| 16 | Borrow (208.0100) | CY | 394 | $23.50 | $1.00 |
| 17 | Prepare foundation for asphaltic paving (project) 01. 6260-00-72 (211.0101) | EACH | 1 | $23,750 | $30,310 |
| 18 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 963 | $54.00 | $96.75 |
| 19 | Finishing roadway (project) 01. 6260-00-72 (213.0100) | EACH | 1 | $1,700.00 | $2,950.00 |
| 20 | Base aggregate dense 3/4-inch (305.0110) | TON | 3,592 | $28.25 | $28.00 |
| 21 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,560 | $28.05 | $27.50 |
| 22 | HMA cold weather paving (450.4000) | TON | 4,600 | $0.01 | $0.01 |
| 23 | Tack coat (455.0605) | GAL | 12,180 | $4.00 | $3.00 |
| 24 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $5,000.00 | $2,250.00 |
| 25 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 1 | $5,000.00 | $3,250.00 |
| 26 | Incentive density PWL HMA pavement (460.2005) | DOL | 14,750 | $1.00 | $1.00 |
| 27 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 11,490 | $1.00 | $1.00 |
| 28 | Incentive air voids HMA pavement (460.2010) | DOL | 18,400 | $1.00 | $1.00 |
| 29 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 18,320 | $75.76 | $71.10 |
| 30 | Asphaltic surface (465.0105) | TON | 828 | $104.56 | $103.90 |
| 31 | Asphaltic surface patching (465.0110) | TON | 2,330 | $83.40 | $78.50 |
| 32 | Asphaltic surface driveways and field entrances (465.0120) | TON | 4 | $234.88 | $495.00 |
| 33 | Asphaltic surface safety islands (465.0305) | TON | 45 | $120.68 | $109.90 |
| 34 | Asphaltic flumes (465.0315) | SY | 28 | $60.00 | $73.10 |
| 35 | Asphaltic rumble strips, centerline (465.0560) | LF | 47,480 | $0.46 | $0.30 |
| 36 | Apron endwalls for culvert pipe 24- inch (520.1024) | EACH | 2 | $750.00 | $685.50 |
| 37 | Culvert pipe class III-A non-metal 24-inch (520.3424) | LF | 48 | $119.65 | $125.50 |
| 38 | Concrete collars for pipe (520.8000) | EACH | 2 | $950.00 | $1,200.00 |
| 39 | Cleaning culvert pipes (520.8700) | EACH | 3 | $853.00 | $2,000.00 |
| 40 | Apron endwalls for culvert pipe steel 18-inch (521.1018) | EACH | 2 | $450.00 | $504.00 |
| 41 | Apron endwalls for culvert pipe steel 30-inch (521.1030) | EACH | 2 | $985.00 | $1,009.40 |
| 42 | Culvert pipe corrugated steel 18- inch (521.3118) | LF | 34 | $59.60 | $126.71 |
| 43 | Culvert pipe reinforced concrete class IV 24-inch (522.0424) | LF | 48 | $201.00 | $157.83 |
| 44 | Culvert pipe reinforced concrete class IV 30-inch (522.0430) | LF | 40 | $285.05 | $202.87 |
| 45 | Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012) | EACH | 1 | $1,500.00 | $1,450.00 |
| 46 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 3 | $1,460.00 | $1,750.00 |
| 47 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 2 | $1,720.00 | $1,987.50 |
| 48 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 19X30-inch (522.2419) | LF | 232 | $237.90 | $183.96 |
| 49 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 24X38-inch (522.2424) | LF | 120 | $246.00 | $247.39 |
| 50 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619) | EACH | 12 | $1,650.00 | $1,814.25 |
| 51 | Culvert pipe corrugated polyethylene 30-inch (530.0130) | LF | 49 | $212.55 | $138.67 |
| 52 | Concrete curb type D (601.0110) | LF | 89 | $54.85 | $54.28 |
| 53 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 3,032 | $37.69 | $37.30 |
| 54 | Concrete curb pedestrian (601.0600) | LF | 28 | $54.85 | $54.28 |
| 55 | Concrete sidewalk 4-inch (602.0405) | SF | 1,312 | $15.34 | $15.18 |
| 56 | Curb ramp detectable warning field yellow (602.0505) | SF | 48 | $60.98 | $60.34 |
| 57 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 95 | $68.56 | $67.84 |
| 58 | Concrete driveway 6-inch (602.0810) | SY | 38 | $90.49 | $89.54 |
| 59 | Riprap medium (606.0200) | CY | 63 | $175.00 | $180.00 |
| 60 | Riprap heavy (606.0300) | CY | 18 | $195.00 | $95.00 |
| 61 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 4 | $493.00 | $315.00 |
| 62 | Reconstructing manholes (611.0420) | EACH | 1 | $2,750.00 | $3,000.00 |
| 63 | Reconstructing inlets (611.0430) | EACH | 15 | $900.00 | $1,000.00 |
| 64 | Barrier system grading shaping finishing (614.0010) | EACH | 14 | $4,268.80 | $3,500.00 |
| 65 | Guardrail mow strip emulsified asphalt (614.0397) | SY | 632 | $18.53 | $15.10 |
| 66 | MGS guardrail 3 (614.2300) | LF | 966.25 | $26.93 | $28.00 |
| 67 | MGS guardrail 3 K (614.2330) | LF | 337.50 | $42.00 | $48.00 |
| 68 | MGS thrie beam transition (614.2500) | LF | 480 | $88.00 | $92.00 |
| 69 | MGS guardrail terminal eat (614.2610) | EACH | 16 | $3,333.00 | $4,800.00 |
| 70 | Maintenance and repair of haul roads (project) 01. 6260-00-72 (618.0100) | EACH | 1 | $100.00 | $1.00 |
| 71 | Mobilization (619.1000) | EACH | 1 | $38,875 | $229,500 |
| 72 | Concrete median sloped nose (620.0300) | SF | 39 | $13.99 | $13.85 |
| 73 | Water (624.0100) | MGAL | 78 | $10.00 | $1.00 |
| 74 | Topsoil (625.0100) | SY | 2,705 | $6.70 | $2.00 |
| 75 | Silt fence (628.1504) | LF | 8,900 | $1.63 | $1.50 |
| 76 | Silt fence maintenance (628.1520) | LF | 8,900 | $0.03 | $0.01 |
| 77 | Mobilizations erosion control (628.1905) | EACH | 6 | $193.00 | $1.00 |
| 78 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $303.00 | $1.00 |
| 79 | Erosion mat urban class I type B (628.2008) | SY | 2,705 | $1.90 | $3.00 |
| 80 | Inlet protection type A (628.7005) | EACH | 2 | $100.00 | $200.00 |
| 81 | Inlet protection type C (628.7015) | EACH | 15 | $75.00 | $100.00 |
| 82 | Temporary ditch checks (628.7504) | LF | 440 | $6.00 | $3.00 |
| 83 | Culvert pipe checks (628.7555) | EACH | 100 | $15.00 | $4.00 |
| 84 | Rock bags (628.7570) | EACH | 440 | $6.00 | $4.00 |
| 85 | Fertilizer type B (629.0210) | CWT | 2 | $100.00 | $150.00 |
| 86 | Seeding mixture no. 30 (630.0130) | LB | 75 | $12.00 | $10.00 |
| 87 | Seeding mixture no. 40 (630.0140) | LB | 57 | $12.00 | $10.00 |
| 88 | Seeding temporary (630.0200) | LB | 83 | $7.00 | $4.00 |
| 89 | Seed water (630.0500) | MGAL | 197 | $5.00 | $0.01 |
| 90 | Markers culvert end (633.5200) | EACH | 28 | $70.00 | $100.00 |
| 91 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 12 | $90.00 | $200.00 |
| 92 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 3 | $98.00 | $200.00 |
| 93 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 2 | $100.00 | $200.00 |
| 94 | Moving signs type II (638.2102) | EACH | 17 | $100.00 | $100.00 |
| 95 | Removing signs type II (638.2602) | EACH | 2 | $50.00 | $100.00 |
| 96 | Removing small sign supports (638.3000) | EACH | 2 | $50.00 | $100.00 |
| 97 | Field office type C (642.5201) | EACH | 1 | $7,390.00 | $12,965 |
| 98 | Traffic control drums (643.0300) | DAY | 6,245 | $0.25 | $0.25 |
| 99 | Traffic control barricades type III (643.0420) | DAY | 853 | $0.75 | $0.75 |
| 100 | Traffic control warning lights type A (643.0705) | DAY | 1,706 | $0.11 | $0.11 |
| 101 | Traffic control warning lights type C (643.0715) | DAY | 396 | $0.13 | $0.13 |
| 102 | Traffic control signs (643.0900) | DAY | 13,451 | $0.50 | $0.50 |
| 103 | Traffic control covering signs type II (643.0920) | EACH | 22 | $125.00 | $125.00 |
| 104 | Traffic control signs PCMS (643.1050) | DAY | 69 | $45.00 | $45.00 |
| 105 | Temporary marking line paint 6- inch (643.3165) | LF | 77,395 | $0.50 | $0.50 |
| 106 | Temporary marking line removable tape 6-inch (643.3180) | LF | 60 | $4.25 | $4.25 |
| 107 | Temporary marking line paint 10- inch (643.3265) | LF | 310 | $1.00 | $1.00 |
| 108 | Temporary marking crosswalk paint 6-inch (643.3305) | LF | 768 | $9.00 | $9.00 |
| 109 | Traffic control (643.5000) | EACH | 1 | $24,000 | $24,000 |
| 110 | Temporary pedestrian surface plate (644.1430) | SF | 290 | $10.00 | $10.00 |
| 111 | Temporary pedestrian surface matting (644.1440) | SF | 854 | $4.00 | $4.00 |
| 112 | Temporary pedestrian curb ramp (644.1601) | DAY | 220 | $8.00 | $8.00 |
| 113 | Temporary pedestrian detectable warning field (644.1605) | SF | 180 | $8.00 | $8.00 |
| 114 | Temporary pedestrian barricade (644.1810) | LF | 1,226 | $4.00 | $4.00 |
| 115 | Geotextile type HR (645.0120) | SY | 240 | $5.00 | $6.00 |
| 116 | Marking line epoxy 6-inch (646.2020) | LF | 573 | $0.70 | $0.70 |
| 117 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 172,537 | $1.07 | $1.07 |
| 118 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 1,132 | $2.00 | $2.00 |
| 119 | Marking arrow epoxy (646.5020) | EACH | 27 | $280.00 | $280.00 |
| 120 | Marking word epoxy (646.5120) | EACH | 2 | $350.00 | $350.00 |
| 121 | Cold weather marking epoxy 6-inch (646.6466) | LF | 173,110 | $0.31 | $0.31 |
| 122 | Cold weather marking epoxy 10- inch (646.6470) | LF | 1,132 | $0.47 | $0.47 |
| 123 | Marking diagonal epoxy 12-inch (646.7120) | LF | 112 | $17.00 | $17.00 |
| 124 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 132 | $15.00 | $15.00 |
| 125 | Marking curb epoxy (646.8120) | LF | 30 | $20.00 | $20.00 |
| 126 | Marking island nose epoxy (646.8220) | EACH | 3 | $340.00 | $340.00 |
| 127 | Marking removal line 6-inch (646.9002) | LF | 3,134 | $1.15 | $1.15 |
| 128 | Marking removal line 10-inch (646.9102) | LF | 106 | $2.70 | $2.70 |
| 129 | Marking removal line wide (646.9200) | LF | 120 | $4.00 | $4.00 |
| 130 | Marking removal special marking (646.9300) | EACH | 28 | $100.00 | $100.00 |
| 131 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 3,035 | $0.62 | $0.62 |
| 132 | Construction staking pipe culverts (650.6000) | EACH | 13 | $135.00 | $135.00 |
| 133 | Construction staking resurfacing reference (650.8000) | LF | 54,320 | $0.12 | $0.12 |
| 134 | Construction staking curb ramps (650.9000) | EACH | 9 | $135.00 | $135.00 |
| 135 | Construction staking sidewalk (project) 01. 6260-00-72 (650.9500) | EACH | 1 | $600.00 | $600.00 |
| 136 | Construction staking supplemental control (project) 01. 6260-00-72 (650.9911) | EACH | 1 | $850.00 | $850.00 |
| 137 | Public land survey monument verify and reset (680.0100) | EACH | 14 | $800.00 | $800.00 |
| 138 | Sawing asphalt (690.0150) | LF | 4,063 | $3.96 | $1.49 |
| 139 | Sawing concrete (690.0250) | LF | 193 | $6.09 | $2.24 |
| 140 | Incentive iri ride (740.0440) | DOL | 43,450 | $1.00 | $1.00 |
| 141 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,000 | $5.00 | $5.00 |
| 142 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,260 | $5.00 | $5.00 |
| 143 | Special 01. fertilizer for lawn type turf (SPV.0030) | CWT | 1 | $125.00 | $150.00 |
| 144 | Special 01. removing excess shoulder material (SPV.0035) | CY | 2,200 | $29.30 | $0.01 |
| 145 | Special 01. cleaning inlets (SPV.0060) | EACH | 2 | $800.00 | $750.00 |
| 146 | Special 02. inlet covers type H-D (SPV.0060) | EACH | 2 | $1,150.00 | $1,115.50 |
| 147 | Special 03. apron endwalls for culvert pipe sloped cross drains steel 24X38-inch 4:1 (SPV.0060) | EACH | 6 | $3,325.00 | $3,950.00 |
| 148 | Special 01. ditch cleaning (SPV.0090) | LF | 100 | $27.50 | $20.00 |
| 149 | Special 02. maintaining exclusion fence (SPV.0090) | LF | 5,300 | $1.00 | $0.50 |
| 150 | Special 03. remove, salvage and reinstall fence (SPV.0090) | LF | 142 | $15.00 | $15.00 |
| 151 | Special 01. removing distressed asphaltic surface milling (SPV.0180) | SY | 11,570 | $6.12 | $3.45 |
| 152 | Special 01. infill riprap (SPV.0195) | TON | 33 | $80.00 | $50.00 |