WisDOT contract 20261110035 bid tabulation
Osseo - Eau Claire; USH 10 W to Old Town Hall Road (USH 053, Eau Claire County Osseo - Eau Claire). Let by Wisconsin DOT on November 10, 2026, Eau Claire. 1 bid received; low bid $13,878,691 by Monarch Paving Company.
- Owner
- Wisconsin DOT
- Letting
- 10 NOV 2026
- Pay items
- 178
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Monarch Paving Company | $13,878,691 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Monarch Paving Company |
|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 43 | $1,260.00 |
| 2 | Grubbing (201.0205) | STA | 43 | $565.00 |
| 3 | Roadside clearing (202.0105) | STA | 372 | $495.00 |
| 4 | Removing small pipe culverts (203.0100) | EACH | 18 | $480.00 |
| 5 | Removing structure (structure) 01. B-18-70 (203.0220) | EACH | 1 | $9,600.00 |
| 6 | Removing structure (structure) 02. B-18-71 (203.0220) | EACH | 1 | $10,700 |
| 7 | Removing structure (structure) 03. sta 55+00 (203.0220) | EACH | 1 | $1,445.00 |
| 8 | Removing structure (structure) 04. sta 179+11 (203.0220) | EACH | 1 | $1,920.00 |
| 9 | Removing structure (structure) 05. sta 213+04 (203.0220) | EACH | 1 | $960.00 |
| 10 | Removing structure (structure) 06. sta 239+47 (203.0220) | EACH | 1 | $960.00 |
| 11 | Removing structure (structure) 07. sta 248+60 (203.0220) | EACH | 1 | $1,920.00 |
| 12 | Removing structure (structure) 08. sta 280+58 (203.0220) | EACH | 1 | $1,200.00 |
| 13 | Removing structure (structure) 09. sta 370+36 (203.0220) | EACH | 1 | $1,920.00 |
| 14 | Removing structure (structure) 10. sta 414+78 (203.0220) | EACH | 1 | $1,920.00 |
| 15 | Removing structure (structure) 11. sta 482+95 (203.0220) | EACH | 1 | $1,920.00 |
| 16 | Removing structure (structure) 12. sta 707+72 (203.0220) | EACH | 1 | $1,445.00 |
| 17 | Removing structure (structure) 13. sta 739+96 (203.0220) | EACH | 1 | $1,445.00 |
| 18 | Removing structure (structure) 14. C-18-3189 (203.0220) | EACH | 1 | $2,400.00 |
| 19 | Removing structure (structure) 15. sta. 306+30 (203.0220) | EACH | 1 | $3,200.00 |
| 20 | Removing structure (structure) 16. sta. 306+45 (203.0220) | EACH | 1 | $3,200.00 |
| 21 | Removing concrete pavement (204.0100) | SY | 9,735 | $1.85 |
| 22 | Removing asphaltic surface butt joints (204.0115) | SY | 1,844 | $13.75 |
| 23 | Removing asphaltic surface milling (204.0120) | SY | 264,296 | $4.56 |
| 24 | Removing guardrail (204.0165) | LF | 11,062 | $2.45 |
| 25 | Removing masonry (204.0185) | CY | 6 | $320.00 |
| 26 | Removing (item description) 01. removing apron endwalls (204.9060.S) | EACH | 13 | $176.00 |
| 27 | Excavation common (205.0100) | CY | 13,724 | $9.60 |
| 28 | Excavation for structures bridges (structure) 01. B-18-243 (206.1001) | EACH | 1 | $9,600.00 |
| 29 | Excavation for structures bridges (structure) 02. B-18-244 (206.1001) | EACH | 1 | $9,600.00 |
| 30 | Borrow (208.0100) | CY | 5,989 | $10.35 |
| 31 | Backfill granular grade 2 (209.2500) | TON | 19,800 | $11.90 |
| 32 | Backfill structure type A (210.1500) | TON | 655 | $15.65 |
| 33 | Prepare foundation for asphaltic paving (project) 01. 7905-00-71 (211.0101) | EACH | 1 | $61,768 |
| 34 | Finishing roadway (project) 01. 7905-00-71 (213.0100) | EACH | 1 | $8,179.90 |
| 35 | Base aggregate dense 3/4-inch (305.0110) | TON | 14,475 | $31.21 |
| 36 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 13,480 | $27.45 |
| 37 | Concrete pavement 6-inch (415.0060) | SY | 80 | $154.07 |
| 38 | Concrete pavement approach slab (415.0410) | SY | 180 | $357.07 |
| 39 | Tack coat (455.0605) | GAL | 29,132 | $2.80 |
| 40 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $11,100 |
| 41 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 3 | $2,250.00 |
| 42 | Incentive density PWL HMA pavement (460.2005) | DOL | 48,500 | $1.00 |
| 43 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 16,470 | $1.00 |
| 44 | Incentive air voids HMA pavement (460.2010) | DOL | 61,155 | $1.00 |
| 45 | HMA pavement 4 MT 58-34 S (460.6244) | TON | 61,155 | $95.29 |
| 46 | Material transfer vehicle (460.9000.S) | EACH | 1 | $29,540 |
| 47 | Asphaltic surface (465.0105) | TON | 3,251 | $133.75 |
| 48 | Asphaltic surface patching (465.0110) | TON | 100 | $196.37 |
| 49 | Asphaltic flumes (465.0315) | SY | 10 | $58.78 |
| 50 | Asphaltic rumble strips, centerline (465.0560) | LF | 65,718 | $0.32 |
| 51 | Concrete masonry bridges (502.0100) | CY | 810 | $600.00 |
| 52 | Protective surface treatment (502.3200) | SY | 770 | $4.00 |
| 53 | Pigmented surface sealer (502.3210) | SY | 182 | $6.00 |
| 54 | Precast concrete box culvert (FT X FT) 01. 3.5 FT X 5 FT (504.2000.S) | LF | 12 | $1,175.00 |
| 55 | Bar steel reinforcement HS structures (505.0400) | LB | 12,890 | $1.86 |
| 56 | Bar steel reinforcement HS coated structures (505.0600) | LB | 115,900 | $1.72 |
| 57 | Bar steel reinforcement HS stainless structures (505.0800.S) | LB | 700 | $5.00 |
| 58 | Rubberized membrane waterproofing (516.0500) | SY | 46 | $57.00 |
| 59 | Concrete collars for pipe (520.8000) | EACH | 3 | $1,380.00 |
| 60 | Cleaning culvert pipes (520.8700) | EACH | 13 | $740.00 |
| 61 | Apron endwalls for culvert pipe steel 24-inch (521.1024) | EACH | 14 | $521.00 |
| 62 | Apron endwalls for culvert pipe steel 30-inch (521.1030) | EACH | 8 | $960.00 |
| 63 | Apron endwalls for culvert pipe steel 36-inch (521.1036) | EACH | 11 | $1,160.00 |
| 64 | Apron endwalls for culvert pipe steel 42-inch (521.1042) | EACH | 2 | $1,645.00 |
| 65 | Apron endwalls for pipe arch steel 83X57-inch (521.1283) | EACH | 4 | $7,596.00 |
| 66 | Culvert pipe corrugated steel 24- inch (521.3124) | LF | 12 | $104.30 |
| 67 | Culvert pipe corrugated steel polymer coated 24-inch (521.5124) | LF | 399 | $107.40 |
| 68 | Culvert pipe corrugated steel polymer coated 30-inch (521.5130) | LF | 199 | $141.15 |
| 69 | Culvert pipe corrugated steel polymer coated 36-inch (521.5136) | LF | 299 | $162.75 |
| 70 | Culvert pipe corrugated steel polymer coated 42-inch (521.5142) | LF | 60 | $233.20 |
| 71 | Pipe arch polymer coated corrugated steel 83X57-inch (521.5783) | LF | 124 | $524.55 |
| 72 | Culvert pipe reinforced concrete class IV 24-inch (522.0424) | LF | 56 | $149.00 |
| 73 | Culvert pipe reinforced concrete class IV 30-inch (522.0430) | LF | 112 | $181.00 |
| 74 | Culvert pipe reinforced concrete class IV 36-inch (522.0436) | LF | 32 | $258.85 |
| 75 | Culvert pipe reinforced concrete class IV 42-inch (522.0442) | LF | 104 | $314.00 |
| 76 | Culvert pipe reinforced concrete class IV 54-inch (522.0454) | LF | 64 | $475.00 |
| 77 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 2 | $1,714.00 |
| 78 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 4 | $2,070.00 |
| 79 | Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036) | EACH | 4 | $2,980.00 |
| 80 | Apron endwalls for culvert pipe reinforced concrete 42-inch (522.1042) | EACH | 6 | $3,600.00 |
| 81 | Apron endwalls for culvert pipe reinforced concrete 54-inch (522.1054) | EACH | 2 | $4,765.00 |
| 82 | Culvert pipe reinforced concrete horizontal elliptical class HE-III 19X30-inch (522.2319) | LF | 172 | $188.00 |
| 83 | Culvert pipe reinforced concrete horizontal elliptical class HE-III 24X38-inch (522.2324) | LF | 48 | $222.25 |
| 84 | Culvert pipe reinforced concrete horizontal elliptical class HE-III 38X60-inch (522.2338) | LF | 56 | $379.95 |
| 85 | Culvert pipe reinforced concrete horizontal elliptical class HE-III 43X68-inch (522.2343) | LF | 240 | $435.25 |
| 86 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 34X53-inch (522.2434) | LF | 112 | $367.15 |
| 87 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619) | EACH | 8 | $1,838.50 |
| 88 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 24X38-inch (522.2624) | EACH | 2 | $2,467.00 |
| 89 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 34X53-inch (522.2634) | EACH | 4 | $3,591.00 |
| 90 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 38X60-inch (522.2638) | EACH | 2 | $4,269.00 |
| 91 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 43X68-inch (522.2643) | EACH | 8 | $5,294.00 |
| 92 | Piling cip concrete 12 3/4 X 0.375- inch (550.2126) | LF | 2,215 | $100.00 |
| 93 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 213 | $61.59 |
| 94 | Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588) | LF | 352 | $61.59 |
| 95 | Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590) | LF | 108 | $61.59 |
| 96 | Concrete sidewalk 4-inch (602.0405) | SF | 236 | $17.90 |
| 97 | Curb ramp detectable warning field yellow (602.0505) | SF | 20 | $60.34 |
| 98 | Concrete surface drains (602.3010) | CY | 9 | $2,017.53 |
| 99 | Concrete rumble strips, transverse (602.3280) | SY | 99 | $231.21 |
| 100 | Riprap medium (606.0200) | CY | 24 | $132.10 |
| 101 | Riprap heavy (606.0300) | CY | 1,271 | $66.75 |
| 102 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 480 | $6.90 |
| 103 | Anchor assemblies for steel plate beam guard (614.0150) | EACH | 8 | $250.00 |
| 104 | Adjusting steel plate beam guard (614.0400) | LF | 536 | $8.00 |
| 105 | Replacing guardrail posts and blocks (614.0950) | EACH | 16 | $163.00 |
| 106 | Replacing guardrail rail and hardware (614.0951) | LF | 44 | $27.15 |
| 107 | MGS guardrail 3 (614.2300) | LF | 2,950 | $27.85 |
| 108 | MGS guardrail 3 K (614.2330) | LF | 987.50 | $44.90 |
| 109 | MGS guardrail 3 L (614.2340) | LF | 400 | $30.35 |
| 110 | MGS guardrail short radius (614.2350) | LF | 40 | $40.95 |
| 111 | MGS thrie beam transition (614.2500) | LF | 315.20 | $110.75 |
| 112 | MGS guardrail terminal eat (614.2610) | EACH | 40 | $3,755.00 |
| 113 | MGS guardrail terminal type 2 (614.2620) | EACH | 3 | $3,110.00 |
| 114 | MGS guardrail short radius terminal (614.2630) | EACH | 2 | $2,660.00 |
| 115 | Mobilization (619.1000) | EACH | 1 | $1,211,248 |
| 116 | Water (624.0100) | MGAL | 132 | $59.10 |
| 117 | Salvaged topsoil (625.0500) | SY | 41,630 | $1.05 |
| 118 | Mulching (627.0200) | SY | 26,553 | $0.40 |
| 119 | Silt fence (628.1504) | LF | 31,370 | $1.75 |
| 120 | Silt fence maintenance (628.1520) | LF | 31,370 | $0.01 |
| 121 | Mobilizations erosion control (628.1905) | EACH | 22 | $240.00 |
| 122 | Mobilizations emergency erosion control (628.1910) | EACH | 11 | $120.00 |
| 123 | Erosion mat urban class I type B (628.2008) | SY | 14,075 | $1.65 |
| 124 | Erosion mat class III type D (628.2039) | SY | 799 | $24.10 |
| 125 | Turbidity barriers (628.6005) | SY | 450 | $34.00 |
| 126 | Soil stabilizer type A (628.6505) | ACRE | 0.18 | $6,100.00 |
| 127 | Culvert pipe checks (628.7555) | EACH | 363 | $15.50 |
| 128 | Fertilizer type B (629.0210) | CWT | 26 | $89.50 |
| 129 | Seeding mixture no. 20 (630.0120) | LB | 1,876 | $7.20 |
| 130 | Seeding temporary (630.0200) | LB | 1,123 | $2.40 |
| 131 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 8 | $86.00 |
| 132 | Signs type II reflective F (637.2230) | SF | 24 | $28.50 |
| 133 | Moving signs type II (638.2102) | EACH | 14 | $88.00 |
| 134 | Removing signs type II (638.2602) | EACH | 4 | $35.00 |
| 135 | Removing small sign supports (638.3000) | EACH | 4 | $35.00 |
| 136 | Moving small sign supports (638.4000) | EACH | 14 | $50.20 |
| 137 | Field office type B (642.5001) | EACH | 1 | $18,900 |
| 138 | Traffic control drums (643.0300) | DAY | 602 | $0.15 |
| 139 | Traffic control barricades type III (643.0420) | DAY | 6,183 | $0.75 |
| 140 | Traffic control warning lights type A (643.0705) | DAY | 12,366 | $0.10 |
| 141 | Traffic control signs (643.0900) | DAY | 90,109 | $0.20 |
| 142 | Traffic control covering signs type II (643.0920) | EACH | 24 | $50.00 |
| 143 | Traffic control signs PCMS (643.1050) | DAY | 14 | $45.00 |
| 144 | Temporary marking line removable tape 6-inch (643.3180) | LF | 54 | $2.00 |
| 145 | Traffic control (643.5000) | EACH | 1 | $145,336 |
| 146 | Temporary pedestrian surface plate (644.1430) | SF | 72 | $17.00 |
| 147 | Temporary pedestrian curb ramp (644.1601) | DAY | 28 | $13.00 |
| 148 | Temporary pedestrian detectable warning field (644.1605) | SF | 20 | $10.00 |
| 149 | Temporary pedestrian barricade (644.1810) | LF | 96 | $6.00 |
| 150 | Geotextile type DF schedule A (645.0111) | SY | 164 | $3.65 |
| 151 | Geotextile type HR (645.0120) | SY | 2,159 | $3.85 |
| 152 | Marking line epoxy 6-inch (646.2020) | LF | 42 | $0.60 |
| 153 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 268,464 | $1.10 |
| 154 | Marking line epoxy 10-inch (646.4020) | LF | 790 | $1.00 |
| 155 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 1,368 | $2.00 |
| 156 | Marking arrow epoxy (646.5020) | EACH | 10 | $170.00 |
| 157 | Marking word epoxy (646.5120) | EACH | 4 | $190.00 |
| 158 | Marking stop line epoxy 18-inch (646.6120) | LF | 183 | $10.00 |
| 159 | Marking diagonal epoxy 12-inch (646.7120) | LF | 477 | $6.00 |
| 160 | Locating no-passing zones (648.0100) | MI | 15.40 | $165.00 |
| 161 | Construction staking base (650.5000) | LF | 1,163 | $0.01 |
| 162 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 673 | $1.58 |
| 163 | Construction staking pipe culverts (650.6000) | EACH | 42 | $240.00 |
| 164 | Construction staking structure layout (structure) 01. B-18-243 (650.6501) | EACH | 1 | $1,654.00 |
| 165 | Construction staking structure layout (structure) 02. B-18-244 (650.6501) | EACH | 1 | $1,720.00 |
| 166 | Construction staking resurfacing reference (650.8000) | LF | 81,359 | $0.05 |
| 167 | Construction staking curb ramps (650.9000) | EACH | 2 | $205.14 |
| 168 | Construction staking supplemental control (project) 01. 7905-00-71 (650.9911) | EACH | 1 | $975.00 |
| 169 | Construction staking slope stakes (650.9920) | LF | 10,454 | $0.70 |
| 170 | Geodetic survey monument (682.0200) | EACH | 1 | $1,100.00 |
| 171 | Sawing asphalt (690.0150) | LF | 3,875 | $2.25 |
| 172 | Sawing concrete (690.0250) | LF | 479 | $2.75 |
| 173 | Incentive strength concrete structures (715.0502) | DOL | 4,860 | $1.00 |
| 174 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 |
| 175 | Incentive iri ride (740.0440) | DOL | 61,504 | $1.00 |
| 176 | Special 01. precast concrete box culvert end section, 3.5 FT X 5 FT (SPV.0060) | EACH | 2 | $13,785 |
| 177 | Special 01. ditch cleaning (SPV.0090) | LF | 200 | $4.80 |
| 178 | Special 01. removing distressed asphaltic surface milling (SPV.0180) | SY | 1,176 | $17.77 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of November 10, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.