WisDOT contract 20261110038 bid tabulation
Bruce - Radisson; 1.0 Mi to 0.08 Mi S of Elm Creek Rd (STH 040, Sawyer County Bruce - Radisson). Let by Wisconsin DOT on November 10, 2026, Sawyer. 7 bids received; low bid $2,311,700 by McCabe Construction, Inc..
- Owner
- Wisconsin DOT
- Letting
- 10 NOV 2026
- Pay items
- 84
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | McCabe Construction, Inc. | $2,311,700 | Low |
| 2 | Musson Bros., Inc. | $2,348,686 | +2.0% |
| 3 | Stout Construction, Inc. | $2,483,828 | +7.0% |
| 4 | James Peterson Sons, Inc. | $2,539,531 | +10% |
| 5 | Haas Sons, Inc. | $2,622,985 | +13% |
| 6 | A-1 Excavating LLC | $2,754,285 | +19% |
| 7 | Antczak Construction, Inc. | $2,942,943 | +27% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. McCabe Construction, Inc. | 2. Musson Bros., Inc. | 3. Stout Construction, Inc. | 4. James Peterson Sons, Inc. | 5. Haas Sons, Inc. | 6. A-1 Excavating LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 73 | $1,852.00 | $1,798.00 | $1,900.00 | $1,798.00 | $1,250.00 | $1,808.00 |
| 2 | Grubbing (201.0205) | STA | 44 | $438.00 | $425.00 | $650.00 | $425.00 | $850.00 | $435.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 7 | $433.00 | $444.43 | $1,525.00 | $800.00 | $850.00 | $685.00 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 58 | $20.56 | $11.52 | $21.00 | $19.96 | $19.96 | $25.00 |
| 5 | Removing asphaltic surface milling (204.0120) | SY | 470 | $19.06 | $18.51 | $19.50 | $18.51 | $18.51 | $22.00 |
| 6 | Excavation common (205.0100) | CY | 14,615 | $14.15 | $13.18 | $14.15 | $12.32 | $15.00 | $20.00 |
| 7 | Borrow (208.0100) | CY | 5,325 | $21.10 | $0.01 | $15.45 | $0.01 | $15.11 | $26.00 |
| 8 | Select borrow (208.1100) | CY | 9,940 | $25.00 | $17.99 | $19.00 | $25.65 | $23.25 | $40.00 |
| 9 | Prepare foundation for asphaltic paving (project) 01. 8590-00-71 (211.0101) | EACH | 1 | $11,000 | $1,780.00 | $33,000 | $16,471 | $21,000 | $2,300.00 |
| 10 | Finishing roadway (project) 01. 8590-00-71 (213.0100) | EACH | 1 | $2,225.00 | $500.00 | $24,000 | $5,000.00 | $1.00 | $500.00 |
| 11 | Obliterating old road (214.0100) | STA | 17 | $1,035.00 | $1,199.86 | $3,000.00 | $900.00 | $750.00 | $1,000.00 |
| 12 | Base aggregate dense 3/4-inch (305.0110) | TON | 1,300 | $25.15 | $29.71 | $11.45 | $26.40 | $24.00 | $27.00 |
| 13 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 14,800 | $14.90 | $18.94 | $15.00 | $17.59 | $16.00 | $21.00 |
| 14 | Shaping shoulders (305.0500) | STA | 10 | $220.00 | $127.98 | $1,550.00 | $100.00 | $400.00 | $55.00 |
| 15 | HMA cold weather paving (450.4000) | TON | 1,000 | $3.51 | $3.41 | $3.60 | $3.41 | $3.41 | $3.50 |
| 16 | Tack coat (455.0605) | GAL | 2,030 | $3.91 | $3.80 | $4.00 | $3.80 | $3.80 | $4.00 |
| 17 | Incentive density HMA pavement (460.2000) | DOL | 3,310 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 18 | HMA pavement 4 LT 58-34 S (460.5244) | TON | 5,150 | $99.33 | $96.45 | $101.25 | $96.45 | $96.45 | $97.00 |
| 19 | Material transfer vehicle (460.9000.S) | EACH | 1 | $12,750 | $12,380 | $13,000 | $12,380 | $12,380 | $12,900 |
| 20 | Asphaltic surface driveways and field entrances (465.0120) | TON | 4 | $302.24 | $293.47 | $308.25 | $293.47 | $293.47 | $374.00 |
| 21 | Asphaltic rumble strips, shoulder (465.0520) | LF | 8,630 | $0.30 | $0.80 | $1.30 | $0.29 | $0.75 | $0.60 |
| 22 | Asphaltic rumble strips, centerline (465.0560) | LF | 4,550 | $0.30 | $1.35 | $1.65 | $0.29 | $0.80 | $0.60 |
| 23 | Resin binder high friction surface treatment (490.0100.S) | SY | 3,100 | $27.59 | $26.79 | $37.60 | $30.58 | $26.79 | $28.00 |
| 24 | Concrete masonry endwalls (504.0900) | CY | 15 | $1,895.00 | $1,840.00 | $2,150.00 | $2,669.00 | $1,840.00 | $1,940.00 |
| 25 | Apron endwalls for culvert pipe 18- inch (520.1018) | EACH | 10 | $331.00 | $501.65 | $675.00 | $363.00 | $700.00 | $570.00 |
| 26 | Apron endwalls for culvert pipe 24- inch (520.1024) | EACH | 2 | $607.00 | $695.90 | $775.00 | $522.00 | $895.00 | $850.00 |
| 27 | Apron endwalls for culvert pipe 30- inch (520.1030) | EACH | 2 | $852.00 | $1,113.20 | $1,250.00 | $885.00 | $1,350.00 | $1,375.00 |
| 28 | Culvert pipe class III-A non-metal 18-inch (520.3418) | LF | 220 | $54.00 | $93.92 | $72.00 | $76.00 | $84.50 | $98.00 |
| 29 | Culvert pipe class III-A non-metal 24-inch (520.3424) | LF | 66 | $65.00 | $125.28 | $101.00 | $139.00 | $107.50 | $176.00 |
| 30 | Culvert pipe class III-A non-metal 30-inch (520.3430) | LF | 70 | $84.50 | $159.49 | $121.00 | $158.00 | $126.00 | $190.00 |
| 31 | Culvert pipe reinforced concrete horizontal elliptical class HE-III 24X38-inch (522.2324) | LF | 106 | $178.00 | $247.63 | $206.50 | $306.00 | $247.00 | $278.00 |
| 32 | Culvert pipe reinforced concrete horizontal elliptical class HE-III 48X76-inch (522.2348) | LF | 126 | $466.00 | $586.02 | $475.00 | $593.00 | $619.00 | $658.00 |
| 33 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 24X38-inch (522.2624) | EACH | 4 | $2,645.00 | $3,587.61 | $2,450.00 | $2,013.00 | $2,765.00 | $4,000.00 |
| 34 | Riprap light (606.0100) | CY | 640 | $86.40 | $86.04 | $73.00 | $80.00 | $70.00 | $80.00 |
| 35 | Riprap medium (606.0200) | CY | 38 | $100.00 | $110.44 | $120.00 | $88.00 | $124.00 | $100.00 |
| 36 | Maintenance and repair of haul roads (project) 01. 8590-00-71 (618.0100) | EACH | 1 | $1.00 | $1.00 | $24,000 | $150.00 | $1.00 | $500.00 |
| 37 | Mobilization (619.1000) | EACH | 1 | $174,007 | $428,544 | $157,000 | $393,395 | $243,500 | $227,245 |
| 38 | Water (624.0100) | MGAL | 260 | $37.00 | $1.00 | $85.50 | $55.00 | $25.00 | $1.00 |
| 39 | Salvaged topsoil (625.0500) | SY | 33,745 | $1.90 | $0.01 | $4.85 | $1.90 | $3.00 | $2.50 |
| 40 | Mulching (627.0200) | SY | 33,745 | $0.29 | $0.28 | $0.25 | $0.23 | $0.28 | $0.40 |
| 41 | Erosion bales (628.1104) | EACH | 151 | $16.48 | $16.00 | $12.60 | $12.00 | $16.00 | $19.00 |
| 42 | Silt fence (628.1504) | LF | 5,440 | $1.96 | $1.90 | $1.75 | $1.63 | $1.90 | $2.00 |
| 43 | Silt fence maintenance (628.1520) | LF | 5,440 | $0.01 | $0.01 | $0.05 | $0.03 | $0.01 | $0.05 |
| 44 | Mobilizations erosion control (628.1905) | EACH | 2 | $1,029.88 | $1,000.00 | $205.00 | $193.00 | $1,000.00 | $1,050.00 |
| 45 | Mobilizations emergency erosion control (628.1910) | EACH | 1 | $10.30 | $10.00 | $310.00 | $293.00 | $10.00 | $60.00 |
| 46 | Erosion mat urban class I type B (628.2008) | SY | 660 | $1.96 | $1.90 | $2.10 | $2.00 | $1.90 | $4.00 |
| 47 | Temporary ditch checks (628.7504) | LF | 320 | $7.21 | $7.00 | $7.35 | $7.00 | $7.00 | $9.00 |
| 48 | Culvert pipe checks (628.7555) | EACH | 40 | $19.93 | $19.35 | $25.00 | $20.00 | $19.35 | $25.00 |
| 49 | Fertilizer type B (629.0210) | CWT | 27 | $87.54 | $85.00 | $105.00 | $100.00 | $85.00 | $88.00 |
| 50 | Seeding mixture no. 10 (630.0110) | LB | 880 | $8.19 | $7.95 | $7.35 | $7.00 | $7.95 | $8.50 |
| 51 | Seeding temporary (630.0200) | LB | 810 | $2.21 | $2.15 | $5.25 | $5.00 | $2.15 | $2.50 |
| 52 | Seed water (630.0500) | MGAL | 767 | $1.03 | $1.00 | $5.25 | $5.00 | $1.00 | $1.00 |
| 53 | Markers culvert end (633.5200) | EACH | 12 | $77.24 | $75.00 | $75.00 | $70.00 | $75.00 | $85.00 |
| 54 | Moving signs type II (638.2102) | EACH | 12 | $98.87 | $96.00 | $105.00 | $100.00 | $96.00 | $106.00 |
| 55 | Removing signs type II (638.2602) | EACH | 16 | $24.72 | $24.00 | $30.00 | $25.00 | $24.00 | $34.00 |
| 56 | Removing small sign supports (638.3000) | EACH | 9 | $24.72 | $24.00 | $30.00 | $25.00 | $24.00 | $34.00 |
| 57 | Moving small sign supports (638.4000) | EACH | 11 | $39.65 | $38.50 | $105.00 | $100.00 | $38.50 | $49.00 |
| 58 | Field office type B (642.5001) | EACH | 1 | $7,500.00 | $11,000 | $5,500.00 | $10,000 | $10,000 | $10,000 |
| 59 | Traffic control drums (643.0300) | DAY | 1,677 | $0.51 | $0.50 | $0.55 | $0.50 | $0.50 | $0.60 |
| 60 | Traffic control barricades type III (643.0420) | DAY | 2,760 | $0.51 | $0.50 | $0.55 | $0.50 | $0.50 | $0.60 |
| 61 | Traffic control warning lights type A (643.0705) | DAY | 6,900 | $0.10 | $0.10 | $0.15 | $0.10 | $0.10 | $0.15 |
| 62 | Traffic control warning lights type C (643.0715) | DAY | 175 | $0.10 | $0.10 | $0.15 | $0.10 | $0.10 | $2.10 |
| 63 | Traffic control signs (643.0900) | DAY | 30,054 | $0.93 | $0.90 | $0.95 | $0.90 | $0.90 | $0.95 |
| 64 | Traffic control covering signs type II (643.0920) | EACH | 13 | $30.90 | $30.00 | $35.00 | $30.00 | $30.00 | $40.00 |
| 65 | Temporary marking line paint 6- inch (643.3165) | LF | 17,160 | $0.51 | $0.39 | $0.45 | $0.39 | $0.50 | $0.40 |
| 66 | Traffic control (643.5000) | EACH | 1 | $3,015.00 | $2,927.00 | $3,100.00 | $2,927.00 | $2,927.00 | $7,927.00 |
| 67 | Geotextile type HR (645.0120) | SY | 102 | $3.00 | $11.79 | $4.75 | $10.00 | $4.00 | $5.00 |
| 68 | Geotextile type R (645.0130) | SY | 1,280 | $2.30 | $2.80 | $3.65 | $4.57 | $3.00 | $3.00 |
| 69 | Marking line epoxy 6-inch (646.2020) | LF | 9,100 | $0.62 | $1.00 | $1.05 | $1.00 | $0.60 | $1.05 |
| 70 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 9,100 | $1.62 | $2.20 | $2.35 | $2.20 | $1.57 | $2.25 |
| 71 | Cold weather marking epoxy 6-inch (646.6466) | LF | 1,820 | $1.03 | $0.32 | $0.35 | $0.32 | $1.00 | $0.40 |
| 72 | Locating no-passing zones (648.0100) | MI | 0.82 | $710.62 | $3,000.00 | $3,150.00 | $3,000.00 | $690.00 | $3,200.00 |
| 73 | Construction staking subgrade (650.4500) | LF | 4,310 | $0.01 | $0.01 | $0.55 | $0.01 | $0.59 | $0.05 |
| 74 | Construction staking base (650.5000) | LF | 4,310 | $1.03 | $1.00 | $1.05 | $1.00 | $1.00 | $1.10 |
| 75 | Construction staking pipe culverts (650.6000) | EACH | 8 | $308.96 | $300.00 | $315.00 | $300.00 | $300.00 | $320.00 |
| 76 | Construction staking resurfacing reference (650.8000) | LF | 240 | $2.06 | $2.00 | $2.10 | $2.00 | $2.00 | $4.00 |
| 77 | Construction staking supplemental control (project) 01. 8590-00-71 (650.9911) | EACH | 1 | $2,059.76 | $2,000.00 | $2,100.00 | $2,000.00 | $2,000.00 | $2,500.00 |
| 78 | Construction staking slope stakes (650.9920) | LF | 3,390 | $1.80 | $1.75 | $1.85 | $1.75 | $1.75 | $1.80 |
| 79 | Sawing asphalt (690.0150) | LF | 52 | $6.60 | $6.00 | $6.25 | $2.95 | $2.95 | $6.00 |
| 80 | Incentive iri ride (740.0440) | DOL | 3,610 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 81 | Installing and maintaining climbing turtle exclusion fence (999.2100.S) | LF | 1,005 | $2.73 | $2.65 | $3.50 | $3.23 | $2.65 | $3.00 |
| 82 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 800 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 83 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 84 | Special 01. bentonite clay anti- seepage core (SPV.0090) | LF | 772 | $75.00 | $15.28 | $25.00 | $124.11 | $365.01 | $10.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of November 10, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.