Antczak Construction, Inc.: WisDOT bid record

Antczak Construction, Inc. submitted 10 bids on Wisconsin DOT contracts in the data, from 08 MAR 2022 to 10 NOV 2026, and was the low bidder on 7 of them (70%). When it was not low, its total sat a median +10% above the low bid.

Owner
Wisconsin DOT
Low bid volume
$15,914,986
Latest bid
10 NOV 2026
Data through
10 NOV 2026
10Bids
7Low bids
70Win rate, percent
+10%Median gap to the low bid when not low, 3 bids

By year

YearBidsLow bidsWin rate
20223133%
202333100%
202422100%
202511100%
2026100%
Antczak Construction, Inc., WisDOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
Barron44100%
St Croix100%
Dunn100%
Rusk11100%
Pierce11100%
Douglas11100%
Sawyer100%
Antczak Construction, Inc., WisDOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
On-the-job training graduate at $5.00/HRASP.1T0GHRS99 (100%)$5.00$5.00
On-the-job training apprentice at $5.00/HRASP.1T0AHRS99 (100%)$5.00$5.00
Traffic control signs643.0900DAY108 (80%)$0.90$0.40
Traffic control barricades type III643.0420DAY108 (80%)$1.25$0.60
Silt fence maintenance628.1520LF108 (80%)$0.01$0.02
Tack coat455.0605GAL107 (70%)$3.80$3.85
Mobilizations emergency erosion control628.1910EACH87 (88%)$150.00$150.00
Construction staking subgrade650.4500LF87 (88%)$0.01$0.01
Markers culvert end633.5200EACH87 (88%)$50.00$68.00
Incentive density HMA pavement460.2000DOL77 (100%)$1.00$1.00
Silt fence628.1504LF106 (60%)$1.95$2.35
Mobilizations erosion control628.1905EACH96 (67%)$555.00$233.00
Antczak Construction, Inc., WisDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Antczak Construction, Inc., WisDOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
10 NOV 202620261110038SawyerBruce - Radisson; 1.0 Mi to 0.08 Mi S of Elm Creek Rd (STH 040, Sawyer County Bruce - Radisson)7 of 7$2,942,943+27%
14 OCT 202520251014026BarronUSH 53 - CTH Ss; Wisconsin Avenue Intersection (CTH O, Barron County USH 53 - CTH SS)1 of 4$1,101,101Low, 6.0% under the second
14 MAY 202420240514034PierceC River Falls, S Wasson Lane; 830th Ave to E Cascade Ave (LOC STR, Pierce County C River Falls, S Wasson Lane)1 of 4$4,047,405Low, 3.0% under the second
14 MAY 202420240514037DouglasMn State Line - STH 35; Mn State Line to Barnes Road (CTH C, Douglas County MN State Line - STH 35)1 of 6$5,095,095Low, 8.0% under the second
14 NOV 202320231114044BarronDallas - Rice Lake; Decker Drive Intersection (CTH O, Barron County Dallas - Rice Lake)1 of 5$337,337Low, 2.0% under the second
10 JAN 202320230110033RuskLadysmith - Prentice; E 16th St N/Old 8 Rd To Price Co Ln (USH 008, Rusk County Ladysmith - Prentice)1 of 6$1,731,732Low, 12% under the second
10 JAN 202320230110037BarronC Rice Lake, Hammond Avenue; Drainage Way Culvert C-03-0063 (STH 048, Barron County City of Rice Lake, Hammond Avenue)1 of 5$1,061,062Low, 1.0% under the second
08 NOV 202220221108058BarronPrairie Farm - Almena; Cth A North To 7th Ave (CTH P, Barron County Prairie Farm - Almena)1 of 5$2,541,254Low, 8.0% under the second
10 MAY 202220220510034DunnCaryville - Cth M; Cth Hh To Cth M (CTH H, Dunn County Caryville - CTH M)2 of 4$2,312,546+10%
08 MAR 202220220308048St CroixHoulton - Sth 65; 14th Street To Cth V (CTH E, St. Croix County Houlton - STH 65)2 of 5$2,272,269+2.0%
Antczak Construction, Inc.: latest WisDOT bids in the data

How this record was read

WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

  • Every bid counted here matched its published total to within one dollar; WisDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy