WisDOT contract 20251014026 bid tabulation
USH 53 - CTH Ss; Wisconsin Avenue Intersection (CTH O, Barron County USH 53 - CTH SS). Let by Wisconsin DOT on October 14, 2025, Barron. 4 bids received; low bid $1,101,101 by Antczak Construction, Inc..
- Owner
- Wisconsin DOT
- Letting
- 14 OCT 2025
- Pay items
- 143
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Antczak Construction, Inc. | $1,101,101 | Low |
| 2 | McCabe Construction, Inc. | $1,162,700 | +6.0% |
| 3 | Haas Sons, Inc. | $1,220,510 | +11% |
| 4 | Pember Companies, Inc. | $1,268,269 | +15% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Antczak Construction, Inc. | 2. McCabe Construction, Inc. | 3. Haas Sons, Inc. | 4. Pember Companies, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Removing asphaltic surface (204.0110) | SY | 480 | $6.00 | $10.00 | $12.00 | $9.75 |
| 2 | Removing asphaltic surface butt joints (204.0115) | SY | 51 | $33.00 | $28.00 | $36.78 | $28.10 |
| 3 | Removing asphaltic surface milling (204.0120) | SY | 380 | $25.00 | $24.00 | $27.82 | $23.95 |
| 4 | Removing curb & gutter (204.0150) | LF | 1,900 | $8.00 | $13.00 | $9.00 | $7.35 |
| 5 | Removing concrete sidewalk (204.0155) | SY | 140 | $10.00 | $18.50 | $15.00 | $15.10 |
| 6 | Removing concrete bases (204.0195) | EACH | 15 | $400.00 | $430.00 | $650.00 | $875.00 |
| 7 | Removing inlets (204.0220) | EACH | 4 | $500.00 | $975.00 | $650.00 | $820.00 |
| 8 | Removing (item description) 01. removing traffic signal wire, loop detector wire & lead-in cable (204.9060.S) | EACH | 1 | $2,500.00 | $2,625.00 | $2,500.00 | $2,650.00 |
| 9 | Excavation common (205.0100) | CY | 2,503 | $19.00 | $23.25 | $23.98 | $44.00 |
| 10 | Finishing roadway (project) 01. 8829-00-72 (213.0100) | EACH | 1 | $1,000.00 | $1,254.00 | $1.00 | $500.00 |
| 11 | Base aggregate dense 3/4-inch (305.0110) | TON | 68 | $45.00 | $46.65 | $51.54 | $41.90 |
| 12 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,650 | $20.00 | $30.00 | $19.54 | $39.70 |
| 13 | Select crushed material (312.0110) | TON | 1,070 | $25.00 | $30.00 | $35.07 | $35.75 |
| 14 | Drilled tie bars (416.0610) | EACH | 16 | $20.00 | $21.00 | $20.00 | $5.80 |
| 15 | Tack coat (455.0605) | GAL | 120 | $10.00 | $9.90 | $9.41 | $9.90 |
| 16 | Incentive density HMA pavement (460.2000) | DOL | 380 | $1.00 | $1.00 | $1.00 | $1.00 |
| 17 | HMA pavement 3 LT 58-34 S (460.5243) | TON | 145 | $170.00 | $172.00 | $180.61 | $172.10 |
| 18 | HMA pavement 4 LT 58-34 S (460.5244) | TON | 105 | $183.00 | $185.50 | $193.40 | $185.50 |
| 19 | HMA pavement 3 MT 58-34 S (460.6243) | TON | 160 | $170.00 | $173.00 | $181.28 | $172.75 |
| 20 | HMA pavement 4 MT 58-34 S (460.6244) | TON | 170 | $180.00 | $181.20 | $189.33 | $181.20 |
| 21 | Asphaltic surface (465.0105) | TON | 18 | $275.00 | $268.50 | $272.49 | $268.55 |
| 22 | Concrete collars for pipe (520.8000) | EACH | 8 | $1,000.00 | $1,540.00 | $1,500.00 | $1,370.00 |
| 23 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 1,640 | $22.00 | $23.10 | $26.00 | $27.40 |
| 24 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 140 | $36.00 | $37.80 | $36.00 | $49.30 |
| 25 | Concrete sidewalk 4-inch (602.0405) | SF | 4,280 | $8.00 | $8.40 | $8.00 | $6.30 |
| 26 | Concrete sidewalk 6-inch (602.0415) | SF | 212 | $12.00 | $12.60 | $12.00 | $8.80 |
| 27 | Curb ramp detectable warning field natural patina (602.0515) | SF | 60 | $60.00 | $63.00 | $60.00 | $59.00 |
| 28 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 28 | $145.00 | $175.00 | $287.00 | $126.60 |
| 29 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 74 | $112.00 | $179.00 | $113.00 | $107.15 |
| 30 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 24 | $200.00 | $182.00 | $290.00 | $191.00 |
| 31 | Manhole covers type J (611.0530) | EACH | 1 | $700.00 | $910.00 | $1,375.00 | $1,020.00 |
| 32 | Manhole covers type J-special (611.0535) | EACH | 2 | $700.00 | $910.00 | $1,600.00 | $1,020.00 |
| 33 | Inlet covers type H (611.0624) | EACH | 5 | $950.00 | $960.00 | $1,300.00 | $1,020.00 |
| 34 | Manholes 4-FT diameter (611.2004) | EACH | 1 | $5,000.00 | $3,626.00 | $5,600.00 | $3,680.00 |
| 35 | Manholes 5-FT diameter (611.2005) | EACH | 2 | $7,500.00 | $6,302.00 | $7,400.00 | $5,965.00 |
| 36 | Inlets 2X3-FT (611.3230) | EACH | 4 | $3,600.00 | $3,215.00 | $4,100.00 | $2,795.00 |
| 37 | Adjusting inlet covers (611.8115) | EACH | 2 | $300.00 | $600.00 | $1,000.00 | $630.00 |
| 38 | Pipe underdrain 6-inch (612.0106) | LF | 80 | $65.00 | $34.00 | $36.00 | $72.00 |
| 39 | Mobilization (619.1000) | EACH | 1 | $92,331 | $77,903 | $140,700 | $88,700 |
| 40 | Concrete corrugated median (620.0100) | SF | 152 | $14.00 | $14.70 | $14.00 | $9.90 |
| 41 | Concrete median sloped nose (620.0300) | SF | 92 | $16.00 | $16.80 | $16.00 | $10.00 |
| 42 | Water (624.0100) | MGAL | 190 | $0.01 | $33.00 | $20.00 | $79.30 |
| 43 | Topsoil (625.0100) | SY | 2,100 | $14.00 | $13.40 | $10.20 | $15.40 |
| 44 | Silt fence (628.1504) | LF | 160 | $2.50 | $2.40 | $2.30 | $2.45 |
| 45 | Silt fence maintenance (628.1520) | LF | 320 | $0.01 | $0.08 | $0.08 | $0.08 |
| 46 | Erosion mat urban class I type A (628.2006) | SY | 2,100 | $2.20 | $2.30 | $2.19 | $2.30 |
| 47 | Inlet protection type A (628.7005) | EACH | 6 | $120.00 | $111.30 | $106.00 | $112.40 |
| 48 | Inlet protection type B (628.7010) | EACH | 2 | $80.00 | $76.65 | $73.00 | $77.40 |
| 49 | Inlet protection type C (628.7015) | EACH | 10 | $80.00 | $75.60 | $72.00 | $76.40 |
| 50 | Temporary ditch checks (628.7504) | LF | 60 | $10.00 | $9.40 | $8.95 | $9.50 |
| 51 | Fertilizer type B (629.0210) | CWT | 1 | $200.00 | $115.50 | $110.00 | $116.65 |
| 52 | Seeding mixture no. 40 (630.0140) | LB | 100 | $20.00 | $14.50 | $13.80 | $14.65 |
| 53 | Seed water (630.0500) | MGAL | 50 | $25.00 | $26.25 | $25.00 | $26.50 |
| 54 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 5 | $115.00 | $113.40 | $108.00 | $114.55 |
| 55 | Signs type II reflective H (637.2210) | SF | 44.75 | $29.00 | $29.95 | $28.50 | $30.25 |
| 56 | Signs type II reflective H folding (637.2215) | SF | 20.72 | $32.00 | $32.90 | $31.30 | $33.20 |
| 57 | Moving signs type II (638.2102) | EACH | 7 | $120.00 | $124.95 | $119.00 | $126.15 |
| 58 | Removing signs type II (638.2602) | EACH | 2 | $45.00 | $43.05 | $41.00 | $43.50 |
| 59 | Removing small sign supports (638.3000) | EACH | 2 | $40.00 | $36.00 | $34.30 | $36.40 |
| 60 | Moving small sign supports (638.4000) | EACH | 5 | $250.00 | $210.00 | $200.00 | $212.00 |
| 61 | Field office type C (642.5201) | EACH | 1 | $4,000.00 | $8,000.00 | $15,000 | $9,500.00 |
| 62 | Traffic control drums (643.0300) | DAY | 3,800 | $0.31 | $0.29 | $1.00 | $0.30 |
| 63 | Traffic control barricades type III (643.0420) | DAY | 120 | $1.00 | $0.95 | $1.00 | $0.95 |
| 64 | Traffic control warning lights type A (643.0705) | DAY | 240 | $0.35 | $0.33 | $0.10 | $0.35 |
| 65 | Traffic control warning lights type C (643.0715) | DAY | 550 | $0.20 | $0.15 | $0.10 | $0.15 |
| 66 | Traffic control signs (643.0900) | DAY | 1,100 | $1.10 | $1.05 | $1.00 | $1.05 |
| 67 | Traffic control signs PCMS (643.1050) | DAY | 14 | $70.00 | $63.00 | $100.00 | $63.65 |
| 68 | Traffic control cones 42-inch (643.1070) | DAY | 1,000 | $0.40 | $0.38 | $0.75 | $0.40 |
| 69 | Temporary marking line paint 4- inch (643.3105) | LF | 1,000 | $3.00 | $2.94 | $0.45 | $3.00 |
| 70 | Temporary marking line paint 8- inch (643.3205) | LF | 500 | $5.25 | $5.25 | $0.90 | $5.30 |
| 71 | Temporary marking crosswalk paint 6-inch (643.3305) | LF | 160 | $13.00 | $12.60 | $0.55 | $12.75 |
| 72 | Temporary marking stop line paint 18-inch (643.3805) | LF | 20 | $40.00 | $34.65 | $2.50 | $35.00 |
| 73 | Traffic control (643.5000) | EACH | 1 | $15,000 | $6,524.00 | $19,340 | $16,000 |
| 74 | Temporary pedestrian surface matting (644.1440) | SF | 1,400 | $1.50 | $1.45 | $7.50 | $1.45 |
| 75 | Temporary pedestrian curb ramp (644.1601) | DAY | 10 | $20.00 | $13.50 | $5.00 | $13.60 |
| 76 | Temporary pedestrian detectable warning field (644.1605) | SF | 16 | $15.00 | $10.65 | $5.00 | $10.75 |
| 77 | Temporary pedestrian barricade (644.1810) | LF | 150 | $8.00 | $6.85 | $5.00 | $6.90 |
| 78 | Geotextile type DF schedule A (645.0111) | SY | 40 | $15.00 | $11.50 | $25.00 | $10.30 |
| 79 | Marking line epoxy 6-inch (646.2020) | LF | 1,300 | $1.65 | $1.60 | $1.50 | $1.60 |
| 80 | Marking line epoxy 10-inch (646.4020) | LF | 1,770 | $2.90 | $2.95 | $2.80 | $3.00 |
| 81 | Marking arrow epoxy (646.5020) | EACH | 20 | $270.00 | $262.50 | $250.00 | $265.10 |
| 82 | Marking stop line epoxy 18-inch (646.6120) | LF | 100 | $20.00 | $19.95 | $19.00 | $20.20 |
| 83 | Marking diagonal epoxy 12-inch (646.7120) | LF | 56 | $15.00 | $12.60 | $12.00 | $12.75 |
| 84 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 360 | $17.00 | $16.80 | $16.00 | $17.00 |
| 85 | Marking corrugated median epoxy (646.8020) | SF | 62 | $8.00 | $7.35 | $7.00 | $7.40 |
| 86 | Marking island nose epoxy (646.8220) | EACH | 2 | $350.00 | $346.50 | $330.00 | $350.00 |
| 87 | Marking removal line water blasting 4-inch (646.9010) | LF | 1,530 | $2.00 | $1.90 | $1.10 | $1.90 |
| 88 | Marking removal line water blasting 8-inch (646.9110) | LF | 790 | $4.00 | $3.95 | $2.10 | $4.00 |
| 89 | Marking removal special marking water blasting (646.9310) | EACH | 16 | $30.00 | $24.65 | $170.00 | $24.90 |
| 90 | Construction staking storm sewer (650.4000) | EACH | 7 | $350.00 | $315.00 | $300.00 | $320.00 |
| 91 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 1,780 | $2.20 | $2.10 | $2.00 | $2.10 |
| 92 | Construction staking electrical installations (project) 01. 8829-00- 72 (650.8501) | EACH | 1 | $2,000.00 | $1,890.00 | $1,800.00 | $1,910.00 |
| 93 | Construction staking curb ramps (650.9000) | EACH | 5 | $200.00 | $157.50 | $150.00 | $159.10 |
| 94 | Construction staking sidewalk (project) 01. 8829-00-72 (650.9500) | EACH | 1 | $1,250.00 | $1,050.00 | $1,000.00 | $1,060.00 |
| 95 | Construction staking supplemental control (project) 01. 8829-00-72 (650.9911) | EACH | 1 | $1,250.00 | $1,050.00 | $1,000.00 | $1,060.00 |
| 96 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 150 | $10.00 | $10.50 | $10.00 | $10.60 |
| 97 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 232 | $12.00 | $12.60 | $12.00 | $12.75 |
| 98 | Conduit special 3-inch (652.0615) | LF | 894 | $20.00 | $21.00 | $20.00 | $21.20 |
| 99 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 8 | $2,450.00 | $2,573.00 | $2,450.00 | $2,600.00 |
| 100 | Removing pull boxes (653.0905) | EACH | 10 | $150.00 | $157.50 | $150.00 | $159.10 |
| 101 | Concrete bases type 1 (654.0101) | EACH | 5 | $1,200.00 | $1,260.00 | $1,200.00 | $1,272.50 |
| 102 | Concrete bases type 2 (654.0102) | EACH | 3 | $1,650.00 | $1,733.00 | $1,650.00 | $1,750.00 |
| 103 | Concrete bases type 10 (654.0110) | EACH | 2 | $10,325 | $10,841 | $10,325 | $10,950 |
| 104 | Concrete bases type 13 (654.0113) | EACH | 2 | $11,650 | $12,233 | $11,650 | $12,355 |
| 105 | Concrete control cabinet bases type 9 special (654.0217) | EACH | 1 | $2,100.00 | $2,205.00 | $2,100.00 | $2,225.00 |
| 106 | Cable traffic signal 5-14 AWG (655.0230) | LF | 545 | $2.00 | $2.10 | $2.00 | $2.10 |
| 107 | Cable traffic signal 7-14 AWG (655.0240) | LF | 1,590 | $3.25 | $3.40 | $3.25 | $3.50 |
| 108 | Cable traffic signal 12-14 AWG (655.0260) | LF | 1,429 | $3.75 | $3.95 | $3.75 | $4.00 |
| 109 | Cable traffic signal 15-14 AWG (655.0270) | LF | 333 | $4.50 | $4.75 | $4.50 | $4.80 |
| 110 | Cable type UF 2-10 AWG grounded (655.0320) | LF | 1,010 | $2.99 | $3.15 | $2.99 | $3.20 |
| 111 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 4,225 | $1.40 | $1.45 | $1.40 | $1.50 |
| 112 | Electrical wire lighting 12 AWG (655.0610) | LF | 1,005 | $1.30 | $1.35 | $1.30 | $1.40 |
| 113 | Pedestal bases (657.0100) | EACH | 5 | $375.00 | $394.00 | $375.00 | $400.00 |
| 114 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 3 | $735.00 | $772.00 | $735.00 | $780.00 |
| 115 | Poles type 4 (657.0315) | EACH | 3 | $2,150.00 | $2,258.00 | $2,150.00 | $2,280.00 |
| 116 | Poles type 10 (657.0350) | EACH | 2 | $9,800.00 | $10,290 | $9,800.00 | $10,390 |
| 117 | Poles type 13 (657.0360) | EACH | 2 | $16,500 | $17,325 | $16,500 | $17,500 |
| 118 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 3 | $975.00 | $1,025.00 | $975.00 | $1,035.00 |
| 119 | Traffic signal standards aluminum 10-FT (657.0430) | EACH | 2 | $885.00 | $930.00 | $885.00 | $940.00 |
| 120 | Monotube arms 30-FT (657.0530) | EACH | 2 | $5,650.00 | $5,933.00 | $5,650.00 | $5,990.00 |
| 121 | Monotube arms 55-FT (657.0555) | EACH | 2 | $14,100 | $14,805 | $14,100 | $14,955 |
| 122 | Luminaire arms single member 4- inch clamp 8-FT (657.0614) | EACH | 3 | $350.00 | $367.50 | $350.00 | $370.00 |
| 123 | Luminaire arms steel 15-FT (657.0815) | EACH | 2 | $1,100.00 | $1,155.00 | $1,100.00 | $1,165.00 |
| 124 | Luminaire arms steel type 13 pole clamp 15-FT (657.0825) | EACH | 2 | $1,175.00 | $1,235.00 | $1,175.00 | $1,245.00 |
| 125 | Traffic signal face 3S 12-inch (658.0173) | EACH | 10 | $800.00 | $840.00 | $800.00 | $850.00 |
| 126 | Traffic signal face 4S 12-inch (658.0174) | EACH | 8 | $1,125.00 | $1,181.00 | $1,125.00 | $1,195.00 |
| 127 | Traffic signal face 5S 12-inch (658.0175) | EACH | 2 | $1,300.00 | $1,365.00 | $1,300.00 | $1,380.00 |
| 128 | Pedestrian signal face 16-inch (658.0416) | EACH | 4 | $675.00 | $709.00 | $675.00 | $715.00 |
| 129 | Signal mounting hardware (location) 01. CTH O & wisconsin avenue (658.5070) | EACH | 1 | $5,050.00 | $5,303.00 | $5,050.00 | $5,355.00 |
| 130 | Luminaires utility LED B (659.1120) | EACH | 7 | $375.00 | $394.00 | $375.00 | $400.00 |
| 131 | Temporary traffic signals for intersections (location) 01. CTH O & wisconsin avenue (661.0201) | EACH | 1 | $87,000 | $91,350 | $87,000 | $92,265 |
| 132 | Sawing asphalt (690.0150) | LF | 2,040 | $2.00 | $2.05 | $1.95 | $3.40 |
| 133 | Sawing concrete (690.0250) | LF | 30 | $4.00 | $4.20 | $2.95 | $6.30 |
| 134 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 300 | $5.00 | $5.00 | $5.00 | $5.00 |
| 135 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 300 | $5.00 | $5.00 | $5.00 | $5.00 |
| 136 | Special 01. remove and salvage traffic signals (SPV.0060) | EACH | 1 | $2,500.00 | $2,625.00 | $2,500.00 | $6,400.00 |
| 137 | Special 02. traffic signal controller and cabinet (SPV.0060) | EACH | 1 | $41,000 | $43,050 | $41,000 | $43,500 |
| 138 | Special 03. video detection system (SPV.0060) | EACH | 1 | $50,500 | $53,025 | $50,500 | $53,550 |
| 139 | Special 04. APS push button system (SPV.0060) | EACH | 1 | $7,225.00 | $7,586.00 | $7,225.00 | $7,660.00 |
| 140 | Special 05. salvage and reinstall meter breaker service (SPV.0060) | EACH | 1 | $900.00 | $945.00 | $900.00 | $955.00 |
| 141 | Special 06. retroreflective backplate 3S (SPV.0060) | EACH | 10 | $225.00 | $237.00 | $225.00 | $239.00 |
| 142 | Special 07. retroreflective backplate 4S (SPV.0060) | EACH | 8 | $300.00 | $315.00 | $300.00 | $320.00 |
| 143 | Special 08. retroreflective backplate 5S (SPV.0060) | EACH | 2 | $325.00 | $341.00 | $325.00 | $345.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of October 14, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way