Owners, scope and amount

FieldValueSource
Owner or sponsorU.S. Army Corps of Engineers
CategoryNavigation locks
Chamber length1,200 ftU.S. Army Corps of Engineers, Detroit District (via DVIDS)
Chamber width110 ftU.S. Army Corps of Engineers, Detroit District (via DVIDS)
Chamber depth32 ftU.S. Army Corps of Engineers, Detroit District (via DVIDS)
AmountNot collected yet
Threshold evidenceA comparable project-wide cost is still needed
Sourced facts in the research record

Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.

AmountWhat it isScopeAs ofSource
US$3.22 bnAuthorized amountWhole projectDec 2022U.S. Army Corps of Engineers, Detroit District (via DVIDS)
Financial records, each with its kind and scope

Contracts and teams

Contracts and teams: Not found in the sources consulted.

Milestones

DateMilestoneScopeSource
2030Planned construction completionWhole projectU.S. Army Corps of Engineers, Detroit District (via DVIDS)
Dated milestones, at the precision of their source

About the project

Second lock the size of the Poe Lock, built in the footprint of the decommissioned Sabin Lock.

Scope notes

  • WRDA 2022 reauthorization amount. Authorization is a distinct measure from an approved cost baseline or amount spent. U.S. Army Corps of Engineers

Sources

  • New Lock at the Soo, U.S. Army Corps of Engineers. Chamber dimensions and programme outlook. Consulted 9 Nov 2026.
  • New Lock at the Soo reauthorization, U.S. Army Corps of Engineers, Dec 2022. WRDA project authorization amount. Consulted 9 Nov 2026.
  • New Lock at the Soo reauthorized in WRDA 2022 at $3.219 billion, U.S. Army Corps of Engineers, Detroit District (via DVIDS), 27 Dec 2022. '$3.219 billion' authorized 'on Dec 23, 2022' in the Water Resources Development Act (WRDA) 2022; previous authorized cost '$922 million'; 'a second Poe-sized lock (110' by 1,200')' on 'the existing decommissioned Davis and Sabin locks site'. Consulted 19 Nov 2026.
  • Chamber Lock Operational Option 3 awarded for New Lock at the Soo, U.S. Army Corps of Engineers, Detroit District (via DVIDS), 12 Sep 2024. '1,200 feet long, 110 feet wide and 32 feet deep'; 'will be the same size as the Poe Lock'; 'constructed in the footprint of the Sabin Lock'; 'on track for completion in 2030'. Consulted 19 Nov 2026.
  • New Lock at the Soo Phase 3 reaches 50% complete milestone, U.S. Army Corps of Engineers, Detroit District (via DVIDS), 29 Sep 2026. 'The U.S. Army Corps of Engineers, Detroit District announced a major milestone in the construction of the New Lock at the Soo, with Phase 3 of the project reaching 50% complete.'; 'Despite the harsh conditions of Michigan's Upper Peninsula, the project remains on schedule for its 2030 target completion.'. Consulted 19 Nov 2026.