ALDOT contract 20250425022 bid tabulation

ADVANCED CORRIDOR MANAGEMENT (TSM&O) ON VARIOUS ROUTES AT VARIOUS LOCATIONS AS INDICATED IN THE PLANS. Let by Alabama DOT on April 25, 2025, Cullman, Blount, Morgan, 0104. 3 bids received; low bid $7,590,357 by Williams Power & Signal, LLC.

Owner
Alabama DOT
Letting
25 APR 2025
Pay items
59
Data through
28 AUG 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Williams Power & Signal, LLC$7,590,357Low
2Stansell Electric Co., Inc.$9,596,957+26%
3Inline, LLC$9,695,832+28%
ALDOT contract 20250425022: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Williams Power & Signal, LLC2. Stansell Electric Co., Inc.3. Inline, LLC
0010Removing guardrail end anchor (all type) (206E008)EACH5$731.33$700.00$422.92
0020Mobilization (600A000)LS1$88,857$1,097,650$651,918
0030Minor structure concrete (620A000)CY32$762.79$1,250.00$6,803.74
0040Steel beam guardrail, class A, type 2 (steel post) (630A021)LF2,050$49.37$30.00$28.35
0050Guardrail end anchor, type 8 (MASH) (630C077)EACH9$2,340.26$1,950.00$1,693.97
0060Guardrail end anchor, type 20 series (MASH) (630C080)EACH16$4,826.78$4,000.00$5,061.35
0070Seeding (652A100)ACRE1$1,462.66$2,000.00$2,109.63
0080Mulching (656A010)ACRE1$1,535.79$2,000.00$1,989.16
0090Silt fence (665J002)LF2,000$5.85$3.00$4.37
0100Silt fence removal (665O001)LF2,000$0.73$1.30$2.51
0110Wattle (665Q002)LF20$11.70$11.00$13.29
0120Overhead roadway sign structure no. 1 (715A000)LS1$272,855$365,500$310,711
0130Overhead roadway sign structure no. 2 (715A001)LS1$107,531$124,550$100,340
0140Overhead roadway sign structure no. 3 (715A002)LS1$107,531$124,550$99,426
0150Overhead roadway sign structure no. 4 (715A003)LS1$105,653$125,500$97,981
0160Overhead roadway sign structure no. 5 (715A004)LS1$105,653$125,500$97,981
0170Overhead roadway sign structure no. 6 (715A005)LS1$105,653$125,500$97,981
0180Overhead roadway sign structure no. 7 (715A006)LS1$105,653$125,500$97,981
0190Overhead roadway sign structure no. 8 (715A007)LS1$105,653$125,500$98,347
0200Fiber optic drop cable, 12F (729A101)LF6,755$2.78$4.00$7.54
0210Fiber distribution unit, secondary (729B010)EACH6$1,096.99$1,140.00$685.63
0220Fan-out kit (729B020)EACH8$1,512.24$680.00$28.16
0230Network device, type C (fmes) (729C020)EACH79$4,219.18$3,560.00$2,852.33
0240Network device, unlicensed wmes (729C110)EACH131$3,007.86$3,265.00$6,065.77
0250Network device, cellular modem (729C200)EACH9$2,372.75$7,095.00$5,468.38
0260Network device, C-V2X (729C300)EACH78$12,974$12,250$10,897
0270Camera, fixed (729D000)EACH40$2,544.79$4,210.00$5,924.55
0280Camera, positioner (729D102)EACH63$3,765.27$6,440.00$6,455.60
0290Vehicle detection system, radar (type B) (729E111)EACH11$17,823$16,350$14,702
0300Vehicle detection system, bluetooth (BDCS) (729E301)EACH12$11,622$10,400$10,558
0310Dynamic message sign, walk-in (size W-2) (729F050)EACH8$121,261$141,000$103,189
0320Environmental sensor, combined weather package (729G060)EACH1$38,345$33,800$29,684
0330Environmental sensor, data processing unit (dpu)/controller package (729G200)EACH1$25,330$23,550$21,455
0340Conduit, underground, non-metallic, 2 inch (729I101)LF20,500$9.95$16.00$63.13
0350Conductor, 6 AWG (729I701)LF20,355$1.85$3.60$7.47
0360Conductor, 4 AWG (729I702)LF25,410$2.72$4.60$7.68
0370Conductor, 2 AWG (729I703)LF18,360$4.18$6.70$9.69
0380Conductor, 1 AWG (729I704)LF6,040$4.66$7.60$10.14
0390Conductor, 2/0 AWG (729I706)LF1,880$7.27$10.50$13.56
0400Locate tone wire (729I800)LF5,815$1.02$2.00$5.09
0410Warning tape (729I810)LF1,910$0.13$2.00$1.90
0420ITS cabinet, pole mount, type 336S (729J024)EACH39$11,241$12,900$7,513.68
0430Electrical power service (ITS cabinet) (729K050)EACH22$4,474.66$7,460.00$5,100.91
0440Electrical power service (DMS cabinet) (729K051)EACH7$4,715.43$5,995.00$6,219.73
0450Electrical power service (disconnect only) (729K080)EACH3$2,410.70$3,410.00$1,574.54
0460Transformer (5 kva) (729K100)EACH14$1,852.15$3,715.00$2,839.02
0465Transformer (10 kva) (729K102)EACH2$2,680.00$7,175.00$3,409.68
0470Electrical power service (solar) (729K200)EACH5$7,373.14$6,205.00$6,751.60
0480Pole, concrete (50 FT agl) (729L005)EACH13$19,154$18,550$17,388
0490Pole, concrete (70 FT agl) (729L007)EACH6$29,438$27,100$23,267
0500Pole, concrete (100 FT agl) (729L010)EACH13$48,298$51,150$36,679
0510Miscellaneous infrastructure, commbox, type F1 (729N301)EACH18$2,123.03$2,665.00$1,040.97
0520Miscellaneous infrastructure, commbox, type E1 (729N311)EACH89$699.85$876.00$413.39
0530Miscellaneous infrastructure, processor unit (729N900)EACH5$71,060$66,500$54,929
0540Construction signs (740B000)SF1,016$13.49$8.00$9.68
0550Channelizing drums (740D000)EACH300$77.04$28.00$25.34
0560Portable sequential arrow and chevron sign unit (741C010)EACH2$5,479.39$2,750.00$2,410.83
0570Uniformed police officer (745A000)HR160$109.70$100.00$91.61
05806" electrical conduit, 1 line, type 5 installation (756A028)LF975$81.68$125.00$189.83
ALDOT contract 20250425022: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.

Every contract let that day: ALDOT letting of April 25, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy