Inline, LLC submitted 13 bids on Alabama DOT contracts in the data, from 29 APR 2022 to 28 AUG 2026, and was the low bidder on 6 of them (46%). When it was not low, its total sat a median +23% above the low bid.
- Owner
- Alabama DOT
- Low bid volume
- $12,632,886
- Latest bid
- 28 AUG 2026
- Data through
- 28 AUG 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 4 | 2 | 50% |
| 2023 | 1 | 1 | 100% |
| 2024 | 3 | 1 | 33% |
| 2025 | 3 | 0 | 0% |
| 2026 | 2 | 2 | 100% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| 0504 | 2 | 1 | 50% |
| Mobile Area | 1 | 0 | 0% |
| 0301, 0305 | 1 | 1 | 100% |
| 0102 | 1 | 0 | 0% |
| 0606 | 1 | 1 | 100% |
| 0301 | 1 | 0 | 0% |
| 0204 | 1 | 0 | 0% |
| 0901 | 1 | 1 | 100% |
| 0104 | 1 | 0 | 0% |
| 0105 | 1 | 0 | 0% |
| 08, 0802, | 1 | 1 | 100% |
| 0502 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Miscellaneous infrastructure, commbox, type F1 | 729N301 | EACH | 7 | 6 (86%) | $1,616.17 | $2,385.39 |
| Fiber optic drop cable, 12F | 729A101 | LF | 7 | 5 (71%) | $1.77 | $3.09 |
| ITS cabinet, pole mount, type 336S | 729J024 | EACH | 7 | 5 (71%) | $7,417.08 | $8,608.74 |
| Miscellaneous infrastructure, fiber marker post | 729N500 | EACH | 6 | 5 (83%) | $85.56 | $156.00 |
| Miscellaneous infrastructure, fusion splicing | 729N000 | EACH | 6 | 5 (83%) | $38.36 | $61.00 |
| Portable sequential arrow and chevron sign unit | 741C010 | EACH | 11 | 4 (36%) | $3,478.09 | $1,597.10 |
| Conduit, underground, non-metallic, 2 inch | 729I101 | LF | 7 | 4 (57%) | $8.61 | $13.50 |
| Network device, type C (fmes) | 729C020 | EACH | 7 | 4 (57%) | $3,816.50 | $3,878.37 |
| Locate tone wire | 729I800 | LF | 7 | 4 (57%) | $0.78 | $1.01 |
| Miscellaneous infrastructure, commbox, type E1 | 729N311 | EACH | 7 | 4 (57%) | $789.31 | $986.63 |
| Miscellaneous infrastructure, commbox, type F2 | 729N302 | EACH | 6 | 4 (67%) | $2,678.46 | $3,490.50 |
| Fiber optic trunk cable, 144F | 729A006 | LF | 6 | 4 (67%) | $3.40 | $3.80 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Stansell Electric Co., Inc. | 7 | 5 of 7 |
| Williams Power & Signal, LLC | 5 | 1 of 5 |
| Temple J Electric, LLC | 3 | 0 of 3 |
| Ozark Safety Services, LLC | 2 | 1 of 2 |
| Webster Electric Company of Mississippi, LLC | 1 | 0 of 1 |
| Bill Smith Electric, Inc. | 1 | 1 of 1 |
| Superior Traffic Control, LLC | 1 | 1 of 1 |
| Stone Electric Company, Inc. | 1 | 0 of 1 |
| Stone & Sons Electrical Contractors, Inc. | 1 | 0 of 1 |
| J. Ranck Electric, Inc. | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 AUG 2026 | 20260828008 | 0502 | ROADWAY SAFETY IMPROVEMENTS (HIGHWAY LIGHTING UPGRADES) ON I-20/I-59 RAMPS AT THE INTERCHANGE OF MERCEDES DRIVE AND ACCESS ROAD (EXIT 89) IN | 1 of 6 | $449,978 | Low, 14% under the second |
| 30 JAN 2026 | 20260130010 | 08, 0802, | TRAFFIC SIGNAL UPGRADES (TRAFFIC SIGNAL BACKPLATE INSTALL) ON VARIOUS ROUTES AT VARIOUS LOCATIONS IN THE SOUTHWEST REGION (GROVE HILL AREA) | 1 of 2 | $256,045 | Low, 6.0% under the second |
| 07 NOV 2025 | 20251107009 | 0504 | INSTALATION OF ITS DEVICES AND NETWORK INFRASTRUCTURE ON I-65 FROM THE CR-42 INTERCHANGE TO THE SHELBY COUNTY LINE | 2 of 3 | $1,987,957 | +3.0% |
| 25 JUL 2025 | 20250725020 | 0105 | TRAFFIC SIGNAL AND OPERATIONS EQUIPMENT INSTALLATION ON SR-1, SR-25, SR-77, SR-291, SR-759, I-59, AND I-759 | 2 of 2 | $12,479,898 | +3.0% |
| 25 APR 2025 | 20250425022 | 0104 | ADVANCED CORRIDOR MANAGEMENT (TSM&O) ON VARIOUS ROUTES AT VARIOUS LOCATIONS AS INDICATED IN THE PLANS | 3 of 3 | $9,695,832 | +28% |
| 08 NOV 2024 | 20241108010 | 0901 | ROADWAY SAFETY IMPROVEMENTS (TRAFFIC SIGNAL UPGRADES) ON VARIOUS ROUTES AT VARIOUS LOCATIONS IN THE SOUTHWEST REGION (MOBILE AREA) AS INDICA | 1 of 4 | $525,263 | Low, 20% under the second |
| 27 SEP 2024 | 20240927028 | 0204 | ADVANCED CORRIDOR MANAGEMENT (TSMO) ON I-65 FROM THE SR-67 INTERCHANGE (MP 332.721) IN PRICEVILLE TO THE SR-3 (US- 31) INTERCHANGE (MP 354.7 | 3 of 4 | $3,348,576 | +32% |
| 23 FEB 2024 | 20240223005 | 0301 | TRAFFIC SIGN REPLACEMENTS ON I-459 FROM THE I-20/I-59 INTERCHANGE (EXIT 0) IN MCCALLA TO THE I-59 INTERCHANGE | 2 of 2 | $4,783,993 | +86% |
| 28 APR 2023 | 20230428033 | 0606 | DYNAMIC MESSAGE SIGNS (DMS) ON I-85 (NORTHBOUND AND SOUTHBOUND LANES) AT MP 49.000 SOUTHWEST OF THE EXIT 50 INTERCHANGE | 1 of 1 | $1,253,562 | Low |
| 02 DEC 2022 | 20221202004 | 0102 | INSTALLATION OF ITS TO SUPPORT ADVANCED CORRIDOR MANAGEMENT ON I-565 FROM THE MOORESVILLE ROAD INTERCHANGE (MP 1.100) TO THE SR-2 (US-72) (M | 2 of 2 | $6,405,271 | +23% |
| 30 SEP 2022 | 20220930004 | Mobile Area | UPGRADE ROADWAY LIGHTING LUMINAIRES ON SR-42 (US-98) IN THE BANKHEAD TUNNEL IN MOBILE | 2 of 2 | $1,274,439 | +13% |
| 30 SEP 2022 | 20220930005 | 0301, 0305 | INSTALLATION OF ITS INFRASTRUCTURE TO SURPORT ADVANCED CORRIDOR MANAGEMENT ON I-65/SR-3 (US-31) | 1 of 2 | $3,650,859 | Low, 2.0% under the second |
| 29 APR 2022 | 20220429033 | 0504 | ITS & INFRASTRUCTURE TO SUPPORT ADVANCED CORRIDOR MANAGEMENT ON I-65 FROM MP 198.004 TO MP 219.591 | 1 of 3 | $6,497,180 | Low, 3.0% under the second |
How this record was read
ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
- Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.