ALDOT contract 20250725020 bid tabulation
TRAFFIC SIGNAL AND OPERATIONS EQUIPMENT INSTALLATION ON SR-1, SR-25, SR-77, SR-291, SR-759, I-59, AND I-759. Let by Alabama DOT on July 25, 2025, Etowah, 0105. 2 bids received; low bid $12,107,673 by Stansell Electric Co., Inc..
- Owner
- Alabama DOT
- Letting
- 25 JUL 2025
- Pay items
- 95
- Data through
- 28 AUG 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Stansell Electric Co., Inc. | $12,107,673 | Low |
| 2 | Inline, LLC | $12,479,898 | +3.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Stansell Electric Co., Inc. | 2. Inline, LLC |
|---|---|---|---|---|---|
| 0010 | Mobilization (600A000) | LS | 1 | $1,189,785 | $1,230,000 |
| 0020 | Steel beam guardrail, class A, type 2 (steel post) (630A021) | LF | 750 | $26.50 | $29.02 |
| 0030 | Guardrail end anchor, type 8 (MASH) (630C077) | EACH | 5 | $1,296.61 | $1,589.13 |
| 0040 | Guardrail end anchor, type 20 series (MASH) (630C080) | EACH | 5 | $3,213.33 | $3,938.29 |
| 0050 | Seeding (652A100) | ACRE | 1 | $1,973.10 | $2,418.25 |
| 0060 | Solid sodding (654A000) | SY | 250 | $14.66 | $20.73 |
| 0070 | Mulching (656A010) | ACRE | 1 | $1,860.35 | $2,280.06 |
| 0080 | Sand bags (665G000) | EACH | 100 | $8.74 | $10.71 |
| 0090 | Silt fence (665J002) | LF | 5,000 | $2.92 | $3.58 |
| 0100 | Silt fence removal (665O001) | LF | 5,000 | $1.18 | $1.45 |
| 0110 | Wattle (665Q002) | LF | 2,000 | $9.08 | $11.12 |
| 0120 | Construction safety fence (674A000) | LF | 500 | $5.64 | $7.21 |
| 0130 | Overhead roadway sign structure #1 (715A000) | LS | 1 | $99,162 | $126,945 |
| 0140 | Overhead roadway sign structure #2 (715A001) | LS | 1 | $189,417 | $148,512 |
| 0150 | Overhead roadway sign structure #3 (715A002) | LS | 1 | $135,298 | $143,164 |
| 0160 | Fiber optic trunk cable, 36F (729A001) | LF | 350 | $2.00 | $4.42 |
| 0170 | Fiber optic trunk cable, 144F (729A006) | LF | 110,097 | $3.93 | $2.76 |
| 0180 | Fiber optic drop cable, 12F (729A101) | LF | 9,565 | $1.40 | $1.11 |
| 0190 | Fiber distribution unit, primary (729B000) | EACH | 7 | $924.71 | $7,806.69 |
| 0200 | Fiber distribution unit, secondary (729B010) | EACH | 33 | $438.47 | $1,268.53 |
| 0210 | Fan-out kit (729B020) | EACH | 42 | $87.45 | $65.57 |
| 0220 | FO patch cable, duplex, LC-LC, 2 meter (729B231) | EACH | 135 | $125.32 | $86.93 |
| 0230 | Network device, type B (ames) (729C010) | EACH | 4 | $11,863 | $12,450 |
| 0240 | Network device, type C (fmes) (729C020) | EACH | 26 | $15,572 | $13,353 |
| 0250 | Network device, unlicensed wmes (729C110) | EACH | 135 | $3,565.73 | $3,916.38 |
| 0260 | Network device, cellular modem (729C200) | EACH | 1 | $6,766.26 | $621.61 |
| 0270 | Camera, positioner (729D102) | EACH | 35 | $4,625.24 | $5,252.97 |
| 0280 | Vehicle detection system, radar (type B) (729E111) | EACH | 12 | $13,700 | $14,718 |
| 0290 | Dynamic message sign, walk-in (size W-1) (729F040) | EACH | 2 | $112,567 | $182,333 |
| 0300 | Dynamic message sign, walk-in (size W-2) (729F050) | EACH | 1 | $112,567 | $122,182 |
| 0310 | Conduit, underground, non-metallic, 2 inch (729I101) | LF | 202,390 | $11.45 | $8.61 |
| 0320 | Conduit, rigid metallic, 2 inch (729I201) | LF | 4,463 | $59.93 | $28.23 |
| 0330 | Conductor, 6 AWG (729I701) | LF | 25,870 | $3.42 | $3.26 |
| 0340 | Conductor, 4 AWG (729I702) | LF | 16,290 | $4.43 | $4.26 |
| 0350 | Conductor, 2 AWG (729I703) | LF | 12,460 | $6.22 | $4.86 |
| 0360 | Conductor, 1 AWG (729I704) | LF | 7,980 | $6.83 | $5.77 |
| 0370 | Conductor, 1/0 AWG (729I705) | LF | 20,640 | $8.15 | $8.56 |
| 0380 | Locate tone wire (729I800) | LF | 114,708 | $0.69 | $0.97 |
| 0390 | ITS cabinet, base mount, type hub (quad) (729J016) | EACH | 3 | $35,474 | $33,366 |
| 0400 | ITS cabinet, pole mount, type 336S (729J024) | EACH | 51 | $10,291 | $7,279.88 |
| 0410 | Electrical power service (ITS cabinet) (729K050) | EACH | 21 | $6,085.03 | $5,253.92 |
| 0420 | Electrical power service (DMS cabinet) (729K051) | EACH | 3 | $6,532.64 | $8,100.84 |
| 0430 | Electrical power service (hub cabinet) (729K052) | EACH | 3 | $6,636.37 | $8,100.84 |
| 0445 | Electrical power service (disconnect only) (729K080) | EACH | 5 | $3,659.81 | $1,137.70 |
| 0450 | Transformer (5 kva) (729K100) | EACH | 14 | $8,943.20 | $3,200.34 |
| 0460 | Transformer (10 kva) (729K102) | EACH | 6 | $9,771.90 | $6,791.24 |
| 0470 | Transformer (15 kva) (729K103) | EACH | 2 | $10,654 | $9,481.00 |
| 0475 | Electrical power service (solar) (729K200) | EACH | 15 | $8,019.79 | $7,371.83 |
| 0480 | Pole, concrete (70 FT agl) (729L007) | EACH | 19 | $24,780 | $21,167 |
| 0490 | Pole, concrete (100 FT agl) (729L010) | EACH | 1 | $43,701 | $40,956 |
| 0500 | Pole, steel (25 FT agl) (729L125) | EACH | 9 | $12,688 | $7,290.62 |
| 0510 | Pole, steel (35 FT agl) (729L135) | EACH | 19 | $13,139 | $20,655 |
| 0520 | Pole, steel (50 FT agl) (729L150) | EACH | 1 | $17,679 | $27,103 |
| 0530 | Miscellaneous infrastructure, fusion splicing (729N000) | EACH | 176 | $46.27 | $42.98 |
| 0540 | Miscellaneous infrastructure, splice closure, underground, 12 fiber (729N111) | EACH | 30 | $974.83 | $1,096.03 |
| 0550 | Miscellaneous infrastructure, splice closure, underground, 144 fiber (729N118) | EACH | 5 | $1,163.17 | $1,248.04 |
| 0560 | Miscellaneous infrastructure, commbox, type F1 (729N301) | EACH | 111 | $1,806.23 | $1,616.17 |
| 0570 | Miscellaneous infrastructure, commbox, type F2 (729N302) | EACH | 44 | $3,509.85 | $2,491.81 |
| 0580 | Miscellaneous infrastructure, commbox, type F3 (729N303) | EACH | 10 | $5,174.02 | $3,519.05 |
| 0590 | Miscellaneous infrastructure, commbox, type E1 (729N311) | EACH | 75 | $833.21 | $1,133.58 |
| 0600 | Miscellaneous infrastructure, pull box (24 in X 24 in X 12 in) (729N400) | EACH | 8 | $1,728.13 | $8,954.08 |
| 0610 | Miscellaneous infrastructure, fiber marker post (729N500) | EACH | 285 | $183.78 | $78.15 |
| 0620 | Miscellaneous infrastructure, UPS (729N600) | EACH | 3 | $8,617.36 | $23,407 |
| 0630 | Removal of existing traffic control unit (partial) ( cabinet upgrades - controller and/or mmu) (730A012) | LS | 1 | $1,073.80 | $594.20 |
| 0640 | Removal of existing traffic control unit (partial) ( cabinet upgrades - controller and mmu) (730A013) | LS | 1 | $536.90 | $739.29 |
| 0650 | Removal of existing traffic control unit (partial) ( cabinet upgrades - cabinet, controller, and mmu) (730A014) | LS | 1 | $7,516.55 | $10,364 |
| 0660 | Removal of existing traffic control unit (partial) ( cabinet upgrades - controller and mmu) (730A015) | LS | 1 | $3,221.38 | $2,660.07 |
| 0670 | Removal of existing traffic control unit (partial) ( cabinet upgrades - cabinet, controller, and mmu) (730A017) | LS | 1 | $3,221.38 | $2,950.27 |
| 0680 | Removal of existing traffic control unit (partial) ( cabinet upgrades - controller and mmu) (730A018) | LS | 1 | $536.90 | $442.20 |
| 0690 | Removal of existing traffic control unit (partial) ( cabinet upgrades - cabinet, controller, and mmu) (730A019) | LS | 1 | $2,147.58 | $2,957.17 |
| 0700 | Removal of existing traffic control unit (partial) ( cabinet upgrades - cabinet, controller, and mmu) (730A020) | LS | 1 | $3,221.38 | $1,478.59 |
| 0710 | Removal of existing traffic control unit (partial) ( cabinet upgrades - controller and mmu) (730A021) | LS | 1 | $536.90 | $442.20 |
| 0720 | Removal of existing traffic control unit (partial) ( cabinet upgrades - cabinet, controller, and mmu) (730A022) | LS | 1 | $31,140 | $21,419 |
| 0730 | Furnishing and installing traffic control unit ( cabinet upgrades - controller and mmu) (730C000) | LS | 1 | $2,147.58 | $608.02 |
| 0740 | Furnishing and installing traffic control unit ( cabinet upgrades - controller and mmu) (730C001) | LS | 1 | $1,073.80 | $1,105.48 |
| 0750 | Furnishing and installing traffic control unit ( cabinet upgrades - cabinet, controller, and mmu) (730C002) | LS | 1 | $15,033 | $12,679 |
| 0760 | Furnishing and installing traffic control unit ( partial) - (cabinet upgrades - controller and mmu) (730C003) | LS | 1 | $3,221.38 | $2,418.25 |
| 0770 | Furnishing and installing traffic control unit ( partial) - (cabinet upgrades - cabinet, controller and mmu) (730C004) | LS | 1 | $4,295.17 | $3,620.46 |
| 0780 | Furnishing and installing traffic control unit ( cabinet upgrades - controller and mmu) (730C005) | LS | 1 | $536.90 | $414.56 |
| 0790 | Furnishing and installing traffic control unit ( cabinet upgrades - cabinet, controller, and mmu) (730C006) | LS | 1 | $4,295.17 | $3,620.46 |
| 0800 | Furnishing and installing traffic control unit ( partial) - (cabinet upgrades - cabinet, controller and mmu) (730C007) | LS | 1 | $3,221.38 | $1,810.23 |
| 0810 | Furnishing and installing traffic control unit ( partial) - (cabinet upgrades - controller and mmu) (730C008) | LS | 1 | $536.90 | $407.65 |
| 0820 | Furnishing and installing traffic control unit ( partial) - (cabinet upgrades - cabinet, controller and mmu) (730C009) | LS | 1 | $31,140 | $26,255 |
| 0830 | Miscellaneous equipment, malfunction management unit (730Q030) | EACH | 11 | $1,932.82 | $2,867.35 |
| 0840 | Controller assembly, type NEMA, 16 channels (730R041) | EACH | 53 | $28,429 | $43,528 |
| 0850 | Controller unit, type NEMA (730R151) | EACH | 10 | $6,979.65 | $9,873.35 |
| 0860 | Controller cabinet, type NEMA, 16 channels (730R162) | EACH | 1 | $22,523 | $33,365 |
| 0870 | Radar detection system ( US-411 (rainbow drive) at gadsden mall) (730U400) | LS | 1 | $41,851 | $63,393 |
| 0880 | Construction signs (740B000) | SF | 2,234 | $9.02 | $11.05 |
| 0890 | Channelizing drums (740D000) | EACH | 100 | $31.57 | $52.51 |
| 0900 | Portable sequential arrow and chevron sign unit (741C010) | EACH | 1 | $4,228.06 | $2,487.34 |
| 0910 | Portable changeable message sign, type 2 (742A001) | EACH | 2 | $13,192 | $15,753 |
| 0920 | Uniformed police officer (745A000) | HR | 100 | $73.28 | $138.19 |
| 0940 | 6" electrical conduit, 1 line, type 5 installation (756A028) | LF | 8,266 | $82.30 | $114.54 |
| 0950 | 6 inch electrical conduit, 2 lines, type 5 installation (756A042) | LF | 120 | $158.97 | $395.30 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
Every contract let that day: ALDOT letting of July 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.