ALDOT letting results, July 25, 2025

12 contracts let by Alabama DOT on July 25, 2025, $76,153,221 in low bids, a median of 4 bidders per contract.

Owner
Alabama DOT
Contracts
12
Low bids, total
$76,153,221
Data through
28 AUG 2026

Contracts let that day

ContractProjectDistrictBidsLow bidderLow bidSecond bidGapSource
20250725001INTERCHANGE MODIFICATIONS ON SR-149 (LAKESHORE PARKWAY) AT THE I-65 INTERCHANGE IN HOMEWOOD03017Gillespie Construction, LLC$23,381,185$25,109,472+7.0%ALDOT
20250725017PAVEMENT PRESERVATION, BRIDGE RAIL RETROFIT, AND STRIPE ON I-85 FROM 0.007 MILE SOUTH OF THE EXIT 22 INTERCHANGE TO 1 MILE NORTH OF THE CR-36 OVERPASS EAST OF F06022Apac-Alabama, Inc.$19,306,558$20,619,119+7.0%ALDOT
20250725020TRAFFIC SIGNAL AND OPERATIONS EQUIPMENT INSTALLATION ON SR-1, SR-25, SR-77, SR-291, SR-759, I-59, AND I-75901052Stansell Electric Co., Inc.$12,107,673$12,479,898+3.0%ALDOT
20250725008ADDITIONAL LANES (GRADE, DRAIN, PAVE, SIGNALS, AND STRIPE) ON SR-35 FROM THE JUNCTION CR-62 (WILLIAM STREET) TO A POINT NORTH OF CR-124 (SCENIC DRIVE) IN SECTIO01034Rogers Group, Inc.$9,626,000$9,993,630+4.0%ALDOT
20250725027WIDEN, RESURFACE, TURN LANE ADDITION, AND STRIPE ON SR-16 (US-90) FROM A POINT NEAR MT AID BAPTIST CHURCH TO THE INTERSECTION OF SR-18109025PL Russell LLC$2,475,998$2,489,424+1.0%ALDOT
20250725011ACCESS MANAGEMENT (GRADE, DRAIN, PAVE, SIGNALS, & STRIPE) ON SR-12 (US-84) FROM CR-709 (MP 184.300) EAST OF ENTERPRISE TO CR-1 (MP 185.420) IN LEVEL PLAINS07023Wiregrass Construction Company, Inc.$2,431,183$2,475,259+2.0%ALDOT
20250725029INTERSECTION IMPROVEMENTS AND ADDITIONAL THRU LANES ON I-20/I-59 AT THE DAIMLER BENZ BOULEVARD INTERCHANGE (EXIT 89) IN VANCE05024Ikaros, LLC$2,300,000$2,589,202+13%ALDOT
20250725015MICRO-FINE MILLING, RESURFACING, AND TRAFFIC STRIPE ON I-22 FROM THE MARION COUNTY LINE TO THE CR-1 OVERPASS (MP 40.300) NORTH OF ELDRIDGE10081Wiregrass Construction Company, Inc.$1,527,267ALDOT
20250725024BRIDGE CULVERT REPLACEMENT AND APPROACHES ON WEST MORGAN ROAD OVER BAKERS CREEK SOUTHWEST OF DECATUR02026Rogers Group, Inc.$1,243,628$1,292,278+4.0%ALDOT
20250725004BRIDGE DECK REHABILITATION (HYDRO DEMO) AND PAINTING ON SR-12 (US-84) (EASTBOUND ROADWAY) OVER THE CHOCTAWHATCHEE RIVER SOUTHEAST OF DALEVILLE07044Comanche Construction of Georgia, LLC$897,368$1,060,571+18%ALDOT
20250725012REDUCED CONFLICT INTERSECTION IMPROVEMENTS ON SR-20 AT CR-77 (GARGIS LANE) SOUTHEAST OF MUSCLE SHOALS02014Rogers Group, Inc.$578,374$780,797+35%ALDOT
20250725016TRAFFIC SIGN UPGRADES ON I-85 (MAINLINE AND RAMPS) FROM THE LEE COUNTY LINE TO THE GEORGIA STATE LINE04031Superior Traffic Control, LLC$277,987ALDOT
ALDOT contracts let on July 25, 2025, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than ALDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy