ALDOT letting results, August 29, 2025
8 contracts let by Alabama DOT on August 29, 2025, $41,587,862 in low bids, a median of 3.5 bidders per contract.
- Owner
- Alabama DOT
- Contracts
- 8
- Low bids, total
- $41,587,862
- Data through
- 28 AUG 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| 20250829022 | RELOACTION AND INTERSECTION IMPROVEMENTS ON LAKESHORE PARKWAY AND MORGAN ROAD FROM CUMBERLAND ROAD TO TURNIN DRIVE IN BESSEMER | 0301 | 6 | Chilton Contractors, Inc. | $18,948,037 | $19,712,633 | +4.0% | ALDOT |
| 20250829007 | MICRO-FINE MILLING, RESURFACING, AND TRAFFIC STRIPE ON I-20 FROM A POINT 0.500 MILE EAST OF THE KELLY CREEK ROAD INTERCHANGE TO WEST OF THE COOSA RIVER BRIDGE | 0302 | 4 | Dunn Construction Company, Inc. | $12,549,275 | $12,763,620 | +2.0% | ALDOT |
| 20250829012 | PAVEMENT PRESERVATION (MICRO-MILL, RESURFACE, AND STRIPE) ON I-85 FROM THE ANN STREET INTERCHANGE TO SR-8 (US-80) INTERCHANGE IN MONTGOMERY | 0603 | 2 | Apac-Alabama, Inc. | $3,854,458 | $3,964,845 | +3.0% | ALDOT |
| 20250829017 | RESURFACING (G TREATMENT) AND TRAFFIC STRIPE ON PLEASANT VALLEY ROAD FROM SR-25 (US-411) TO SR-7 (US-11) SOUTHWEST OF GADSDEN | 0105 | 2 | Wiregrass Construction Company, Inc. | $2,653,453 | $2,657,669 | 0.0% | ALDOT |
| 20250829011 | PLANE, MICRO-MILL, RESURFACE, GUARDRAIL INSTALL, AND STRIPE ON THE I-20 ON AND OFF RAMPS AT EXITS 185, 188, 191, 199, AND 205 IN THE EAST CENTRAL REGION (ALEXAN | 0201, 0404 | 2 | Apac-Alabama, Inc. | $1,699,320 | $1,788,340 | +5.0% | ALDOT |
| 20250829005 | CABLE GUIDERAIL INSTALLATION ON I-65 FROM MP 16.940 TO MP 23.000 NORTH OF MOBILE | 0901 | 3 | RMD Holdings, Inc. | $849,694 | $920,295 | +8.0% | ALDOT |
| 20250829009 | DRAINAGE IMPROVEMENTS AND PIPE REHABILITATION ON I-459 FROM A POINT NEAR MP 19.280 TO A POINT NEAR MP 19.394 SOUTHEAST OF VESTAVIA HILLS | 0301 | 5 | Southeastern Sealcoating, Inc. | $613,624 | $616,645 | 0.0% | ALDOT |
| 20250829025 | MAINTENANCE BRIDGE PAINTING ON SR-53 (US-231) AT MP 315.314 IN HUNTSVILLE AND ON I-759 (MP 1.005) AT THE EASTSIDE DRIVE OVERPASS IN GADSDEN. | 0102, 0105 | 7 | Cekra, Inc | $420,000 | $567,464 | +35% | ALDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ALDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.