Apac-Alabama, Inc.: ALDOT bid record

Apac-Alabama, Inc. submitted 246 bids on Alabama DOT contracts in the data, from 03 NOV 2023 to 28 AUG 2026, and was the low bidder on 81 of them (33%). When it was not low, its total sat a median +12% above the low bid.

Owner
Alabama DOT
Low bid volume
$353,605,509
Latest bid
28 AUG 2026
Data through
28 AUG 2026
246Bids
81Low bids
33Win rate, percent
+12%Median gap to the low bid when not low, 165 bids

By year

YearBidsLow bidsWin rate
202314214%
2024742230%
2025873237%
2026712535%
Apac-Alabama, Inc., ALDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
06012229%
02011517%
07021517%
030115747%
070115960%
060314964%
070413215%
050211436%
040210440%
07059667%
09019667%
0102800%
Apac-Alabama, Inc., ALDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Construction signs740B000SF241107 (44%)$6.46$7.00
Traffic control markings, class 2, type A703A002SF227107 (47%)$5.78$6.00
Solid temporary traffic stripe701C001MI228105 (46%)$1,015.00$1,064.57
Temporary traffic control markings703D001SF207101 (49%)$2.15$2.35
Pavement markers, class A-H, type 2-C705A030EACH19496 (49%)$5.67$6.00
Solid white, class 2, type A traffic stripe (5" wide)701A227MI20094 (47%)$4,389.16$4,427.98
Pavement markers, class A-H, type 2-D705A037EACH19193 (49%)$5.68$6.05
Solid yellow, class 2, type A traffic stripe (5" wide)701A230MI19892 (46%)$4,389.16$4,432.31
Broken temporary traffic stripe701C000MI20388 (43%)$950.00$1,000.00
Traffic control legends, class 2, type A703B002SF18888 (47%)$6.40$6.53
Tack coat405A000GAL22581 (36%)$4.42$4.55
Dotted, class 2, type A traffic stripe (5" wide)701B207LF16381 (50%)$2.00$2.15
Apac-Alabama, Inc., ALDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Apac-Alabama, Inc., ALDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
28 AUG 2026202608280110402MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE TO INTERSECTION IMPROVEMENTS (LEFT AND RIGHT TURN LANES) ON CR 109 FROM SR-202 TO MORRISVILLE2 of 4$2,346,073+3.0%
28 AUG 2026202608280211008RESURFACING, GUARDRAIL INSTALL (GUARDRAIL, GUARDRAIL END ANCHORS, AND GUARDRAIL STEEL BLOCKOUT REPLACEMENT), AND STRIPE ON I-22 FROM A POINT3 of 3$9,143,634+11%
28 AUG 2026202608280230601PLANING, MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON I-65 FROM THE MONTGOMERY COUNTY LINE TO A POINT NEAR THE 1 of 2$8,398,370Low, 7.0% under the second
28 AUG 2026202608280260701PLANING, RESURFACING, AND TRAFFIC STRIPE ON NORTH BROADWAY STREET FROM THE JUNCTION OF SR-12 (US-84) TO THE JUNCTION OF MAIN STREET IN ASHFO2 of 3$442,117+20%
28 AUG 2026202608280270701PLANING, RESURFACING, AND TRAFFIC STRIPE ON WEBB ROAD FROM THE INTERSECTION OF NORTH RANGE STREET TO THE INTERSECTION OF SR-210 (US-431) IN 2 of 3$403,506+11%
31 JUL 2026202607310170402ROADWAY WIDENING AND PEDESTRIAN IMPROVEMENTS (GRADING, DRAINAGE, PAVEMENT, TRAFFIC SIGNALS, AND TRAFFIC STRIPE) ON SR-204 FROM THE JUNCTION 2 of 4$8,877,476+8.0%
31 JUL 2026202607310210701, 0705RESURFACING AND TRAFFIC STRIPE ON CR-203 FROM HADDEN RD TO THE LIMESTONE CREEK BRIDGE AND ON COUNTRY GARDEN RD FROM WEBB TO KINSEY RD TO THE1 of 3$805,144Low, 4.0% under the second
26 JUN 2026202606260050502PLANING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON I-20/I-59 FROM THE SR-300 (EXIT 62) INTERCHANGE TO THE MALLISHAM PARKWAY1 of 2$5,965,544Low, 5.0% under the second
26 JUN 2026202606260220803MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-41 FROM THE JUNCTION OF FOUNTAIN DRIVE IN MONROEVILLE TO THE FL2 of 2$1,892,812+10%
26 JUN 2026202606260240505SAFETY WIDENING, PLANING, RESURFACING, TRAFFIC SIGNAL UPGRADES AND TRAFFIC STRIPE ON SR-14 FROM A POINT 0.290 MILE WEST OF THE JUNCTION OF H1 of 1$2,403,881Low
26 JUN 2026202606260270601WIDENING, RESURFACING, AND TRAFFIC STRIPE ON GARDNER ROAD FROM THE JUNCTION OF CR-59 (UPPER KINGSTON ROAD) TO THE JUNCTION OF CR-23 (MARTIN 2 of 3$484,372+1.0%
26 JUN 2026202606260280603PLANING, RESURFACING, AND TRAFFIC STRIPE ON (CR-107) MARLER ROAD FROM THE JUNCTION OF SR-110 TO THE SR-8 (US-80) INTERCHANGE1 of 3$1,205,021Low, 2.0% under the second
26 JUN 2026202606260350902ROADWAY IMPROVEMENTS (ADDITIONAL LANES, MICRO-MILLING, CURB AND GUTTER INSTALLATION, RESURFACING, AND TRAFFIC STRIPE) ON SR-59 SOUTH FROM TH4 of 5$2,140,107+28%
29 MAY 2026202605290010603ROADWAY IMPROVEMENTS/ADDITIONAL LANES (GRADE, DRAIN, PAVE, BRIDGE REPLACEMENT, SIGNS, SIGNALS, ITS, AND SANITARY SEWER) ON I-85 FROM A POINT1 of 3$70,721,773Low, 6.0% under the second
29 MAY 2026202605290150505ROADWAY SAFETY IMPROVEMENTS (SAFETY WIDENING AND TRAFFIC STRIPE) ON CR-50 FROM ELLIOT'S CREEK BRIDGE (0.160 MILE EAST OF THE JUNCTION OF SAN2 of 2$460,956+19%
29 MAY 2026202605290180804PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-13 (US-43) FROM THE JUNCTION OF GATES DRIVE TO THE JUNCTION OF MAGNOLIA LAWN ROAD IN GROVE HI1 of 2$3,124,423Low, 8.0% under the second
29 MAY 2026202605290190402MICRO-MILLING, RESURFACING (SCRUB SEAL), AND TRAFFIC STRIPE ON SR-21 FROM THE JUNCTION OF MAXWELLBORN ROAD TO THE JUNCTION OF MEMORIAL DRIVE2 of 3$1,390,590+6.0%
29 MAY 2026202605290230301MICRO-MILLING, RESURFACING (SCRUB SEAL), BRIDGE GUARDRAIL RETROFIT, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-3 (US-31) FROM THE INTE2 of 4$6,315,968+4.0%
29 MAY 2026202605290240301SAFETY WIDENING, RESURFACING (SCRUB SEAL), BRIDGE GUARDRAIL RETROFIT, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-79 FROM WINEWOOD ROAD1 of 3$4,826,129Low, 2.0% under the second
29 MAY 2026202605290370402RESURFACING (SCRUB SEAL) AND TRAFFIC STRIPE ON OLD GADSDEN HIGHWAY FROM THE JUNCTION OF SR-1 (US-431) TO THE INTERSECTION OF SHAW STREET IN 2 of 3$751,026+2.0%
29 MAY 2026202605290400704INTERSECTION IMPROVEMENTS (MICRO-MILLING, RESURFACING, TRAFFIC SIGNAL MODIFICATIONS, AND TRAFFIC STRIPE) ON SR-53 (US-231) AT THE INTERSECTI1 of 3$860,813Low, 19% under the second
24 APR 2026202604240100803RESURFACING AND TRAFFIC STRIPE ON SR-5 FROM THE JUNCTION OF CHURCH STREET TO THE JUNCTION OF SANDPIT ROAD IN PINE HILL2 of 3$1,432,746+16%
24 APR 2026202604240130301SAFETY WIDENING, MICRO-MILLING, RESURFACING (SCRUB SEAL), GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-79 FROM A POINT SOUTH OF THE FIVE2 of 3$2,556,446+5.0%
24 APR 2026202604240230302RESURFACING (SCRUB SEAL), GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-25 (US-411) FROM THE JUNCTION OF MADDOX FARM ROAD IN ODENVILLE TO2 of 5$3,111,826+18%
24 APR 2026202604240260902PLANING, RESURFACING, GUARDRAIL INSTALLATION, TRAFFIC SIGNAL UPGRADES (BACKPLATE REPLACEMENTS), AND TRAFFIC STRIPE ON SR-16 (US-90) FROM THE1 of 2$1,385,484Low, 0.0% under the second
Apac-Alabama, Inc.: latest ALDOT bids in the data

How this record was read

ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.

  • Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy