Apac-Alabama, Inc.: ALDOT bid record
Apac-Alabama, Inc. submitted 246 bids on Alabama DOT contracts in the data, from 03 NOV 2023 to 28 AUG 2026, and was the low bidder on 81 of them (33%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- Alabama DOT
- Low bid volume
- $353,605,509
- Latest bid
- 28 AUG 2026
- Data through
- 28 AUG 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2023 | 14 | 2 | 14% |
| 2024 | 74 | 22 | 30% |
| 2025 | 87 | 32 | 37% |
| 2026 | 71 | 25 | 35% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| 0601 | 22 | 2 | 9% |
| 0201 | 15 | 1 | 7% |
| 0702 | 15 | 1 | 7% |
| 0301 | 15 | 7 | 47% |
| 0701 | 15 | 9 | 60% |
| 0603 | 14 | 9 | 64% |
| 0704 | 13 | 2 | 15% |
| 0502 | 11 | 4 | 36% |
| 0402 | 10 | 4 | 40% |
| 0705 | 9 | 6 | 67% |
| 0901 | 9 | 6 | 67% |
| 0102 | 8 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Construction signs | 740B000 | SF | 241 | 107 (44%) | $6.46 | $7.00 |
| Traffic control markings, class 2, type A | 703A002 | SF | 227 | 107 (47%) | $5.78 | $6.00 |
| Solid temporary traffic stripe | 701C001 | MI | 228 | 105 (46%) | $1,015.00 | $1,064.57 |
| Temporary traffic control markings | 703D001 | SF | 207 | 101 (49%) | $2.15 | $2.35 |
| Pavement markers, class A-H, type 2-C | 705A030 | EACH | 194 | 96 (49%) | $5.67 | $6.00 |
| Solid white, class 2, type A traffic stripe (5" wide) | 701A227 | MI | 200 | 94 (47%) | $4,389.16 | $4,427.98 |
| Pavement markers, class A-H, type 2-D | 705A037 | EACH | 191 | 93 (49%) | $5.68 | $6.05 |
| Solid yellow, class 2, type A traffic stripe (5" wide) | 701A230 | MI | 198 | 92 (46%) | $4,389.16 | $4,432.31 |
| Broken temporary traffic stripe | 701C000 | MI | 203 | 88 (43%) | $950.00 | $1,000.00 |
| Traffic control legends, class 2, type A | 703B002 | SF | 188 | 88 (47%) | $6.40 | $6.53 |
| Tack coat | 405A000 | GAL | 225 | 81 (36%) | $4.42 | $4.55 |
| Dotted, class 2, type A traffic stripe (5" wide) | 701B207 | LF | 163 | 81 (50%) | $2.00 | $2.15 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Wiregrass Construction Company, Inc. | 180 | 86 of 180 |
| Rogers Group, Inc. | 35 | 34 of 35 |
| Grayson Carter & Son Contracting, Inc. | 33 | 22 of 33 |
| Asphalt Contractors, Inc. | 32 | 22 of 32 |
| Dunn Construction Company, Inc. | 26 | 15 of 26 |
| Vulcan Materials Asphalt and Construction, | 24 | 10 of 24 |
| McElhenney Construction Co., LLC | 19 | 7 of 19 |
| S. T. Bunn Construction Company, Inc. | 18 | 12 of 18 |
| Southeast Construction Company, LLC | 18 | 12 of 18 |
| Lewis Incorporated.. | 9 | 5 of 9 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 AUG 2026 | 20260828011 | 0402 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE TO INTERSECTION IMPROVEMENTS (LEFT AND RIGHT TURN LANES) ON CR 109 FROM SR-202 TO MORRISVILLE | 2 of 4 | $2,346,073 | +3.0% |
| 28 AUG 2026 | 20260828021 | 1008 | RESURFACING, GUARDRAIL INSTALL (GUARDRAIL, GUARDRAIL END ANCHORS, AND GUARDRAIL STEEL BLOCKOUT REPLACEMENT), AND STRIPE ON I-22 FROM A POINT | 3 of 3 | $9,143,634 | +11% |
| 28 AUG 2026 | 20260828023 | 0601 | PLANING, MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON I-65 FROM THE MONTGOMERY COUNTY LINE TO A POINT NEAR THE | 1 of 2 | $8,398,370 | Low, 7.0% under the second |
| 28 AUG 2026 | 20260828026 | 0701 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON NORTH BROADWAY STREET FROM THE JUNCTION OF SR-12 (US-84) TO THE JUNCTION OF MAIN STREET IN ASHFO | 2 of 3 | $442,117 | +20% |
| 28 AUG 2026 | 20260828027 | 0701 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON WEBB ROAD FROM THE INTERSECTION OF NORTH RANGE STREET TO THE INTERSECTION OF SR-210 (US-431) IN | 2 of 3 | $403,506 | +11% |
| 31 JUL 2026 | 20260731017 | 0402 | ROADWAY WIDENING AND PEDESTRIAN IMPROVEMENTS (GRADING, DRAINAGE, PAVEMENT, TRAFFIC SIGNALS, AND TRAFFIC STRIPE) ON SR-204 FROM THE JUNCTION | 2 of 4 | $8,877,476 | +8.0% |
| 31 JUL 2026 | 20260731021 | 0701, 0705 | RESURFACING AND TRAFFIC STRIPE ON CR-203 FROM HADDEN RD TO THE LIMESTONE CREEK BRIDGE AND ON COUNTRY GARDEN RD FROM WEBB TO KINSEY RD TO THE | 1 of 3 | $805,144 | Low, 4.0% under the second |
| 26 JUN 2026 | 20260626005 | 0502 | PLANING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON I-20/I-59 FROM THE SR-300 (EXIT 62) INTERCHANGE TO THE MALLISHAM PARKWAY | 1 of 2 | $5,965,544 | Low, 5.0% under the second |
| 26 JUN 2026 | 20260626022 | 0803 | MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-41 FROM THE JUNCTION OF FOUNTAIN DRIVE IN MONROEVILLE TO THE FL | 2 of 2 | $1,892,812 | +10% |
| 26 JUN 2026 | 20260626024 | 0505 | SAFETY WIDENING, PLANING, RESURFACING, TRAFFIC SIGNAL UPGRADES AND TRAFFIC STRIPE ON SR-14 FROM A POINT 0.290 MILE WEST OF THE JUNCTION OF H | 1 of 1 | $2,403,881 | Low |
| 26 JUN 2026 | 20260626027 | 0601 | WIDENING, RESURFACING, AND TRAFFIC STRIPE ON GARDNER ROAD FROM THE JUNCTION OF CR-59 (UPPER KINGSTON ROAD) TO THE JUNCTION OF CR-23 (MARTIN | 2 of 3 | $484,372 | +1.0% |
| 26 JUN 2026 | 20260626028 | 0603 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON (CR-107) MARLER ROAD FROM THE JUNCTION OF SR-110 TO THE SR-8 (US-80) INTERCHANGE | 1 of 3 | $1,205,021 | Low, 2.0% under the second |
| 26 JUN 2026 | 20260626035 | 0902 | ROADWAY IMPROVEMENTS (ADDITIONAL LANES, MICRO-MILLING, CURB AND GUTTER INSTALLATION, RESURFACING, AND TRAFFIC STRIPE) ON SR-59 SOUTH FROM TH | 4 of 5 | $2,140,107 | +28% |
| 29 MAY 2026 | 20260529001 | 0603 | ROADWAY IMPROVEMENTS/ADDITIONAL LANES (GRADE, DRAIN, PAVE, BRIDGE REPLACEMENT, SIGNS, SIGNALS, ITS, AND SANITARY SEWER) ON I-85 FROM A POINT | 1 of 3 | $70,721,773 | Low, 6.0% under the second |
| 29 MAY 2026 | 20260529015 | 0505 | ROADWAY SAFETY IMPROVEMENTS (SAFETY WIDENING AND TRAFFIC STRIPE) ON CR-50 FROM ELLIOT'S CREEK BRIDGE (0.160 MILE EAST OF THE JUNCTION OF SAN | 2 of 2 | $460,956 | +19% |
| 29 MAY 2026 | 20260529018 | 0804 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-13 (US-43) FROM THE JUNCTION OF GATES DRIVE TO THE JUNCTION OF MAGNOLIA LAWN ROAD IN GROVE HI | 1 of 2 | $3,124,423 | Low, 8.0% under the second |
| 29 MAY 2026 | 20260529019 | 0402 | MICRO-MILLING, RESURFACING (SCRUB SEAL), AND TRAFFIC STRIPE ON SR-21 FROM THE JUNCTION OF MAXWELLBORN ROAD TO THE JUNCTION OF MEMORIAL DRIVE | 2 of 3 | $1,390,590 | +6.0% |
| 29 MAY 2026 | 20260529023 | 0301 | MICRO-MILLING, RESURFACING (SCRUB SEAL), BRIDGE GUARDRAIL RETROFIT, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-3 (US-31) FROM THE INTE | 2 of 4 | $6,315,968 | +4.0% |
| 29 MAY 2026 | 20260529024 | 0301 | SAFETY WIDENING, RESURFACING (SCRUB SEAL), BRIDGE GUARDRAIL RETROFIT, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-79 FROM WINEWOOD ROAD | 1 of 3 | $4,826,129 | Low, 2.0% under the second |
| 29 MAY 2026 | 20260529037 | 0402 | RESURFACING (SCRUB SEAL) AND TRAFFIC STRIPE ON OLD GADSDEN HIGHWAY FROM THE JUNCTION OF SR-1 (US-431) TO THE INTERSECTION OF SHAW STREET IN | 2 of 3 | $751,026 | +2.0% |
| 29 MAY 2026 | 20260529040 | 0704 | INTERSECTION IMPROVEMENTS (MICRO-MILLING, RESURFACING, TRAFFIC SIGNAL MODIFICATIONS, AND TRAFFIC STRIPE) ON SR-53 (US-231) AT THE INTERSECTI | 1 of 3 | $860,813 | Low, 19% under the second |
| 24 APR 2026 | 20260424010 | 0803 | RESURFACING AND TRAFFIC STRIPE ON SR-5 FROM THE JUNCTION OF CHURCH STREET TO THE JUNCTION OF SANDPIT ROAD IN PINE HILL | 2 of 3 | $1,432,746 | +16% |
| 24 APR 2026 | 20260424013 | 0301 | SAFETY WIDENING, MICRO-MILLING, RESURFACING (SCRUB SEAL), GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-79 FROM A POINT SOUTH OF THE FIVE | 2 of 3 | $2,556,446 | +5.0% |
| 24 APR 2026 | 20260424023 | 0302 | RESURFACING (SCRUB SEAL), GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-25 (US-411) FROM THE JUNCTION OF MADDOX FARM ROAD IN ODENVILLE TO | 2 of 5 | $3,111,826 | +18% |
| 24 APR 2026 | 20260424026 | 0902 | PLANING, RESURFACING, GUARDRAIL INSTALLATION, TRAFFIC SIGNAL UPGRADES (BACKPLATE REPLACEMENTS), AND TRAFFIC STRIPE ON SR-16 (US-90) FROM THE | 1 of 2 | $1,385,484 | Low, 0.0% under the second |
How this record was read
ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
- Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.