Wiregrass Construction Company, Inc.: ALDOT bid record
Wiregrass Construction Company, Inc. submitted 477 bids on Alabama DOT contracts in the data, from 28 JAN 2022 to 28 AUG 2026, and was the low bidder on 155 of them (32%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Alabama DOT
- Low bid volume
- $590,402,000
- Latest bid
- 28 AUG 2026
- Data through
- 28 AUG 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 87 | 33 | 38% |
| 2023 | 86 | 30 | 35% |
| 2024 | 111 | 29 | 26% |
| 2025 | 103 | 35 | 34% |
| 2026 | 90 | 28 | 31% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| 0601 | 38 | 14 | 37% |
| 0603 | 32 | 9 | 28% |
| 0301 | 26 | 5 | 19% |
| 0103 | 26 | 7 | 27% |
| 0204 | 25 | 3 | 12% |
| 0105 | 25 | 6 | 24% |
| 0702 | 24 | 17 | 71% |
| 0701 | 24 | 5 | 21% |
| 0102 | 20 | 4 | 20% |
| 0704 | 19 | 13 | 68% |
| 0104 | 19 | 2 | 11% |
| 0302 | 18 | 5 | 28% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Construction signs | 740B000 | SF | 466 | 198 (42%) | $6.53 | $7.00 |
| Material remixing device | 410H000 | EACH | 306 | 189 (62%) | $25,000 | $34,670 |
| Traffic control markings, class 2, type A | 703A002 | SF | 432 | 169 (39%) | $5.85 | $6.00 |
| Solid temporary traffic stripe | 701C001 | MI | 427 | 164 (38%) | $1,024.79 | $1,064.57 |
| Pilot car | 740O000 | EACH | 209 | 162 (78%) | $2,500.00 | $8,427.51 |
| Temporary traffic control markings | 703D001 | SF | 379 | 156 (41%) | $2.16 | $2.35 |
| Broken temporary traffic stripe | 701C000 | MI | 377 | 154 (41%) | $957.26 | $1,000.00 |
| Traffic control legends, class 2, type A | 703B002 | SF | 361 | 148 (41%) | $6.42 | $6.53 |
| Solid white, class 2, type A traffic stripe (5" wide) | 701A227 | MI | 377 | 147 (39%) | $4,289.14 | $4,427.98 |
| Solid yellow, class 2, type A traffic stripe (5" wide) | 701A230 | MI | 373 | 147 (39%) | $4,293.00 | $4,432.31 |
| Pavement markers, class A-H, type 2-C | 705A030 | EACH | 361 | 139 (39%) | $5.71 | $6.00 |
| Pavement markers, class A-H, type 2-D | 705A037 | EACH | 371 | 136 (37%) | $5.71 | $6.05 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Apac-Alabama, Inc. | 180 | 94 of 180 |
| Rogers Group, Inc. | 97 | 77 of 97 |
| Midsouth Paving, Inc. | 91 | 35 of 91 |
| Vulcan Materials Asphalt and Construction, | 70 | 37 of 70 |
| Asphalt Contractors, Inc. | 58 | 34 of 58 |
| Dunn Construction Company, Inc. | 54 | 27 of 54 |
| Whitaker Contracting Corporation | 52 | 38 of 52 |
| Grayson Carter & Son Contracting, Inc. | 51 | 41 of 51 |
| McElhenney Construction Co., LLC | 32 | 11 of 32 |
| Alabama Grading & Excavation, LLC. | 24 | 10 of 24 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 AUG 2026 | 20260828021 | 1008 | RESURFACING, GUARDRAIL INSTALL (GUARDRAIL, GUARDRAIL END ANCHORS, AND GUARDRAIL STEEL BLOCKOUT REPLACEMENT), AND STRIPE ON I-22 FROM A POINT | 2 of 3 | $8,430,263 | +2.0% |
| 28 AUG 2026 | 20260828023 | 0601 | PLANING, MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON I-65 FROM THE MONTGOMERY COUNTY LINE TO A POINT NEAR THE | 2 of 2 | $8,987,680 | +7.0% |
| 28 AUG 2026 | 20260828026 | 0701 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON NORTH BROADWAY STREET FROM THE JUNCTION OF SR-12 (US-84) TO THE JUNCTION OF MAIN STREET IN ASHFO | 3 of 3 | $533,878 | +45% |
| 28 AUG 2026 | 20260828027 | 0701 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON WEBB ROAD FROM THE INTERSECTION OF NORTH RANGE STREET TO THE INTERSECTION OF SR-210 (US-431) IN | 3 of 3 | $579,544 | +59% |
| 28 AUG 2026 | 20260828030 | 0202 | ROADWAY IMPROVEMENTS/REALIGNMENT (GRADING, DRAINING, PAVEMENT, TRAFFIC SIGNS, TRAFFIC SIGNALS, AND TRAFFIC STRIPE) ON SR-3 (US-31) AT SPARKM | 4 of 8 | $1,377,111 | +18% |
| 31 JUL 2026 | 20260731001 | 0301 | ROADWAY AND DRAINAGE IMPROVEMENTS (GRADING, DRAINAGE, PAVEMENT (RESURFACING), AND TRAFFIC STRIPE) ON CR-337 (MCCALLA ROAD) FROM THE JUNCTION | 6 of 6 | $2,048,815 | +22% |
| 31 JUL 2026 | 20260731003 | 0202 | RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON CR-84 (FOREST SERVICE ROAD 265) FROM THE JUNCTION OF CR-76 TO THE JUNCTION OF CR- | 2 of 3 | $904,414 | +10% |
| 31 JUL 2026 | 20260731011 | 0105 | SAFETY WIDENING, MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-1 (US-431) FROM THE CALHOUN COUNTY LINE TO THE INTERSECTION OF BANKS S | 3 of 3 | $7,712,310 | +35% |
| 31 JUL 2026 | 20260731021 | 0701, 0705 | RESURFACING AND TRAFFIC STRIPE ON CR-203 FROM HADDEN RD TO THE LIMESTONE CREEK BRIDGE AND ON COUNTRY GARDEN RD FROM WEBB TO KINSEY RD TO THE | 3 of 3 | $1,050,183 | +30% |
| 31 JUL 2026 | 20260731022 | 0105 | ROADWAY IMPROVEMENTS (PARTIAL REALIGNMENT) AND RESURFACING (WIDEN, PLANE, GRADE, DRAINAGE, SIDEWALK INSTALL, AND STRIPE ON SOUTH 11TH STREET | 5 of 5 | $3,205,153 | +49% |
| 31 JUL 2026 | 20260731025 | 0902 | INTERSECTION IMPROVEMENTS (ADDITIONAL TURN LANES AND TRAFFIC SIGNAL UPGRADES) ON SR-42 (US-98) AT CR-87 EAST OF FOLEY | 4 of 6 | $950,178 | +10% |
| 26 JUN 2026 | 20260626011 | 0103 | MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-35 FROM THE INTERSECTION OF MEDICAL CENTER DRIVE TO THE INTERSE | 1 of 3 | $3,197,826 | Low, 19% under the second |
| 26 JUN 2026 | 20260626015 | 0703 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-15 FROM THE JUNCTION OF SR-55 TO THE JUNCTION OF SR-12 (US-84) IN ANDALUSIA | 1 of 1 | $1,282,114 | Low |
| 26 JUN 2026 | 20260626016 | 0103 | MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-68 FROM THE NORTHWEST CITY LIMITS OF COLLINSVILLE (MP 17.610) T | 1 of 4 | $992,277 | Low, 6.0% under the second |
| 26 JUN 2026 | 20260626017 | 0204 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-127 FROM THE INTERSECTION OF SR-99 IN ATHENS TO THE JUNCTION OF MAPLES CIRCLE (MP 4.590 | 3 of 3 | $1,530,033 | +55% |
| 26 JUN 2026 | 20260626020 | 0302 | MICRO-MILLING, RESURFACING (SCRUB SEAL), BRIDGE GUARDRAIL RETROFIT, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-3 (US-31) FROM THE I-65 | 3 of 4 | $3,615,670 | +12% |
| 26 JUN 2026 | 20260626022 | 0803 | MICRO-MILLING, RESURFACING, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-41 FROM THE JUNCTION OF FOUNTAIN DRIVE IN MONROEVILLE TO THE FL | 1 of 2 | $1,715,018 | Low, 10% under the second |
| 26 JUN 2026 | 20260626027 | 0601 | WIDENING, RESURFACING, AND TRAFFIC STRIPE ON GARDNER ROAD FROM THE JUNCTION OF CR-59 (UPPER KINGSTON ROAD) TO THE JUNCTION OF CR-23 (MARTIN | 3 of 3 | $690,536 | +44% |
| 26 JUN 2026 | 20260626028 | 0603 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON (CR-107) MARLER ROAD FROM THE JUNCTION OF SR-110 TO THE SR-8 (US-80) INTERCHANGE | 3 of 3 | $1,269,124 | +5.0% |
| 26 JUN 2026 | 20260626029 | 0601 | ROADWAY AND SAFETY IMPROVEMENTS (PLANING, RESURFACING, SIDEWALK INSTALLATION, AND TRAFFIC STRIPE) ON WEST TALLASSEE STREET FROM THE JUNCTION | 5 of 5 | $1,475,829 | +36% |
| 26 JUN 2026 | 20260626035 | 0902 | ROADWAY IMPROVEMENTS (ADDITIONAL LANES, MICRO-MILLING, CURB AND GUTTER INSTALLATION, RESURFACING, AND TRAFFIC STRIPE) ON SR-59 SOUTH FROM TH | 1 of 5 | $1,677,018 | Low, 16% under the second |
| 29 MAY 2026 | 20260529001 | 0603 | ROADWAY IMPROVEMENTS/ADDITIONAL LANES (GRADE, DRAIN, PAVE, BRIDGE REPLACEMENT, SIGNS, SIGNALS, ITS, AND SANITARY SEWER) ON I-85 FROM A POINT | 3 of 3 | $76,971,274 | +9.0% |
| 29 MAY 2026 | 20260529007 | 0302 | ROADWAY SAFETY IMPROVEMENTS (SAFETY WIDENING, RESURFACING (MICRO-SURFACING SEAL COAT, TYPE III), AND TRAFFIC STRIPE) ON CR-12 FROM THE JUNCT | 1 of 2 | $694,518 | Low, 10% under the second |
| 29 MAY 2026 | 20260529018 | 0804 | PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-13 (US-43) FROM THE JUNCTION OF GATES DRIVE TO THE JUNCTION OF MAGNOLIA LAWN ROAD IN GROVE HI | 2 of 2 | $3,385,583 | +8.0% |
| 29 MAY 2026 | 20260529021 | 0204 | MICRO-MILL, RESURFACE, BRIDGE GUARDRAIL RETROFIT, GUARDRAIL IMPROVEMENTS (INSTALL AND BLOCKOUT REPLACEMENT), AND STRIPE ON SR-3 (US-31) FROM | 3 of 3 | $3,996,625 | +39% |
How this record was read
ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
- Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.