ALDOT contract 20260731001 bid tabulation
ROADWAY AND DRAINAGE IMPROVEMENTS (GRADING, DRAINAGE, PAVEMENT (RESURFACING), AND TRAFFIC STRIPE) ON CR-337 (MCCALLA ROAD) FROM THE JUNCTION OF CR-18 (EASTERN VALLEY ROAD) TO A POINT NEAR THE NORFOLK SOUTHERN RAILROAD. Let by Alabama DOT on July 31, 2026, Jefferson, 0301. 6 bids received; low bid $1,678,000 by Ikaros, LLC.
- Owner
- Alabama DOT
- Letting
- 31 JUL 2026
- Pay items
- 84
- Data through
- 28 AUG 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Ikaros, LLC | $1,678,000 | Low |
| 2 | GFC Construction, Inc. | $1,689,855 | +1.0% |
| 3 | Gillespie Construction, LLC | $1,731,752 | +3.0% |
| 4 | Southeastern Sealcoating, Inc. | $1,807,858 | +8.0% |
| 5 | Dominion Construction Company, Inc. | $1,861,574 | +11% |
| 6 | Wiregrass Construction Company, Inc. | $2,048,815 | +22% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ikaros, LLC | 2. GFC Construction, Inc. | 3. Gillespie Construction, LLC | 4. Southeastern Sealcoating, Inc. | 5. Dominion Construction Company, Inc. | 6. Wiregrass Construction Company, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0010 | Clearing and grubbing (maximum allowable bid $ 8,000.00 per acre) (approximately 2 acres) (201A002) | LS | 1 | $16,000 | $16,000 | $16,000 | $16,000 | $16,000 | $16,000 |
| 0020 | Removing concrete driveway (206C010) | SY | 541 | $25.00 | $21.53 | $25.00 | $36.75 | $14.58 | $15.37 |
| 0030 | Removing pipe (206D000) | LF | 936 | $20.00 | $16.28 | $45.00 | $50.00 | $29.82 | $31.44 |
| 0040 | Removing headwalls (206E000) | EACH | 38 | $800.00 | $682.66 | $500.00 | $500.00 | $1,000.00 | $1,054.44 |
| 0050 | Removing inlets (206E001) | EACH | 1 | $1,750.00 | $1,764.00 | $4,500.00 | $1,000.00 | $1,128.75 | $1,190.20 |
| 0060 | Removing junction boxes (206E002) | EACH | 1 | $1,750.00 | $1,764.00 | $4,500.00 | $1,000.00 | $1,128.75 | $1,190.20 |
| 0070 | Mailbox reset, single (209A000) | EACH | 14 | $450.00 | $425.41 | $350.00 | $500.00 | $630.00 | $664.30 |
| 0080 | Unclassified excavation (210A000) | CY | 2,446 | $30.00 | $82.35 | $40.00 | $47.00 | $87.08 | $91.83 |
| 0090 | Borrow excavation (210D000) | CY | 368 | $30.00 | $83.27 | $75.00 | $85.25 | $81.90 | $86.36 |
| 0100 | Structure excavation (214A000) | CY | 932 | $30.00 | $25.69 | $45.00 | $62.50 | $16.67 | $17.58 |
| 0110 | Foundation backfill, commercial (214B001) | CY | 306 | $60.00 | $79.59 | $75.00 | $86.75 | $78.33 | $82.59 |
| 0115 | Cement mortar flowable backfill, mix 2 (260A001) | CY | 5 | $700.00 | $815.25 | $500.00 | $500.00 | $650.00 | $685.39 |
| 0120 | Coarse aggregate, section 801, for miscellaneous use (305B071) | TON | 150 | $62.00 | $56.12 | $75.00 | $68.00 | $42.00 | $44.29 |
| 0130 | Tack coat (405A000) | GAL | 820 | $5.22 | $5.12 | $5.40 | $5.00 | $5.25 | $30.24 |
| 0140 | Superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range C/D (424A360) | TON | 974 | $136.34 | $133.65 | $152.40 | $140.00 | $131.50 | $131.50 |
| 0150 | Superpave bituminous concrete wearing surface layer, widening, 1/2" maximum aggregate size mix, esal range C/D (424A369) | TON | 18 | $577.89 | $566.50 | $798.00 | $731.50 | $556.50 | $363.77 |
| 0160 | Superpave bituminous concrete upper binder layer, patching, 1" maximum aggregate size mix, esal range C/D (424B655) | TON | 225 | $180.00 | $176.00 | $160.00 | $172.00 | $173.00 | $179.10 |
| 0170 | Superpave bituminous concrete upper binder layer, leveling, 1/2" maximum aggregate size mix, esal range C/D (424B657) | TON | 200 | $173.93 | $170.50 | $184.80 | $169.50 | $167.50 | $124.87 |
| 0180 | Superpave bituminous concrete upper binder layer, widening, 1" maximum aggregate size mix, esal range C/D (424B662) | TON | 445 | $175.00 | $169.40 | $193.80 | $178.00 | $166.50 | $143.75 |
| 0190 | Superpave bituminous concrete lower binder layer, patching, 1" maximum aggregate size mix, esal range C/D (424B685) | TON | 25 | $250.00 | $391.79 | $200.00 | $600.00 | $210.00 | $232.45 |
| 0200 | Superpave bituminous concrete lower binder layer, widening, 1" maximum aggregate size mix, esal range C/D (424B692) | TON | 450 | $175.00 | $168.30 | $194.40 | $178.00 | $165.50 | $145.56 |
| 0210 | Superpave bituminous concrete base layer, patching, 1" maximum aggregate size mix, esal range C/D (424C364) | TON | 25 | $250.00 | $391.79 | $200.00 | $500.00 | $210.00 | $232.45 |
| 0220 | Superpave bituminous concrete base layer, widening, 1" maximum aggregate size mix, esal range C/D (424C370) | TON | 353 | $190.00 | $189.20 | $172.80 | $158.50 | $186.00 | $182.31 |
| 0230 | Aggregate surfacing (aldot #467 or #57) (430B000) | TON | 97 | $82.00 | $54.50 | $75.00 | $75.50 | $42.00 | $44.29 |
| 0240 | Aggregate surfacing (aldot #810 or 8910) (430B022) | TON | 199 | $82.00 | $62.90 | $75.00 | $78.75 | $42.00 | $44.29 |
| 0250 | 22" span, 14" rise roadway pipe (class 3 R.C.) (530B001) | LF | 36 | $135.00 | $146.42 | $250.00 | $165.00 | $184.50 | $194.55 |
| 0260 | 44" span, 27" rise roadway pipe (class 3 R.C.) (530B004) | LF | 177 | $225.00 | $205.90 | $275.00 | $222.00 | $191.77 | $202.21 |
| 0270 | 65" span, 40" rise roadway pipe (class 3 R.C.) (530B007) | LF | 210 | $450.00 | $335.59 | $375.00 | $317.00 | $346.61 | $365.48 |
| 0280 | 18" storm sewer pipe (class 3 R.C.) (533A098) | LF | 134 | $95.00 | $98.38 | $225.00 | $140.25 | $88.50 | $93.32 |
| 0290 | 22" span, 14" rise storm sewer pipe (class 3 R.C.) (533B098) | LF | 27 | $135.00 | $146.42 | $250.00 | $165.00 | $184.50 | $194.55 |
| 0300 | 18" side drain pipe (535A001) | LF | 400 | $95.00 | $71.74 | $165.00 | $217.75 | $88.50 | $93.32 |
| 0310 | 24" side drain pipe (535A002) | LF | 85 | $105.00 | $83.89 | $225.00 | $239.00 | $104.78 | $110.48 |
| 0320 | 30" side drain pipe (535A003) | LF | 60 | $125.00 | $100.39 | $250.00 | $182.00 | $136.27 | $143.69 |
| 0330 | 36" side drain pipe (535A004) | LF | 30 | $150.00 | $163.32 | $275.00 | $300.00 | $180.37 | $190.19 |
| 0340 | Mobilization (600A000) | LS | 1 | $122,374 | $132,300 | $48,050 | $84,780 | $168,400 | $390,726 |
| 0350 | Right of way markers (602A000) | EACH | 32 | $700.00 | $582.51 | $900.00 | $883.00 | $750.00 | $790.83 |
| 0360 | Loose riprap, class 2 (610C001) | TON | 394 | $81.00 | $68.46 | $75.00 | $99.00 | $88.00 | $92.79 |
| 0370 | Filter blanket, geotextile (610D003) | SY | 709 | $5.00 | $3.29 | $10.00 | $10.00 | $10.50 | $11.08 |
| 0380 | Concrete driveway, 6" thick (includes wire mesh) (618B003) | SY | 213 | $150.00 | $93.50 | $130.00 | $115.00 | $110.00 | $115.99 |
| 0390 | 18" roadway pipe end treatment, class 1 (619A002) | EACH | 1 | $2,250.00 | $1,320.00 | $1,500.00 | $2,139.00 | $1,900.00 | $2,003.44 |
| 0400 | 18" side drain pipe end treatment, class 1 (619A101) | EACH | 28 | $2,250.00 | $1,320.00 | $1,500.00 | $2,139.00 | $1,500.00 | $1,581.66 |
| 0410 | 24" side drain pipe end treatment, class 1 (619A102) | EACH | 6 | $2,500.00 | $1,320.00 | $2,000.00 | $2,353.00 | $2,400.00 | $2,530.66 |
| 0420 | 30" side drain pipe end treatment, class 1 (619A103) | EACH | 2 | $3,000.00 | $1,430.00 | $2,750.00 | $2,588.00 | $2,800.00 | $2,952.43 |
| 0430 | 36" side drain pipe end treatment, class 1 (619A104) | EACH | 2 | $3,500.00 | $1,980.00 | $3,000.00 | $2,848.00 | $3,200.00 | $3,374.21 |
| 0440 | 44" span, 27" rise roadway pipe end treatment, class 2 (triple line) (619B314) | EACH | 2 | $9,500.00 | $5,700.00 | $6,000.00 | $8,942.00 | $6,400.00 | $6,748.42 |
| 0450 | 65" span, 40" rise roadway pipe end treatment, class 2 (triple line) (619B317) | EACH | 2 | $12,500 | $7,500.00 | $6,000.00 | $14,676 | $8,500.00 | $8,962.74 |
| 0460 | Minor structure concrete (620A000) | CY | 1 | $1,500.00 | $2,764.58 | $2,000.00 | $2,000.00 | $650.00 | $685.39 |
| 0470 | Junction boxes, type 1 or 1P (621A011) | EACH | 2 | $5,500.00 | $4,224.69 | $5,000.00 | $4,410.00 | $9,000.00 | $9,489.96 |
| 0480 | Junction box units, type 1 or 1P (621B011) | EACH | 1 | $1,500.00 | $474.74 | $2,500.00 | $1,000.00 | $1,500.00 | $1,581.66 |
| 0490 | Inlets, type C or P1 (621C024) | EACH | 2 | $6,500.00 | $7,266.00 | $5,500.00 | $5,330.00 | $6,600.00 | $6,959.30 |
| 0500 | Fence reset (includes all types) (637A001) | LF | 1,166 | $50.05 | $32.04 | $35.00 | $32.75 | $64.00 | $44.40 |
| 0510 | Topsoil (650A000) | CY | 1,471 | $50.00 | $47.39 | $52.00 | $47.50 | $61.50 | $64.85 |
| 0520 | Solid sodding (654A000) | SY | 9,906 | $12.00 | $8.80 | $8.70 | $11.00 | $14.00 | $10.02 |
| 0530 | Temporary seeding (665A000) | ACRE | 1 | $719.16 | $2,625.00 | $1,000.00 | $1,500.00 | $950.00 | $637.94 |
| 0540 | Temporary mulching (665B001) | TON | 3 | $742.94 | $105.00 | $1,500.00 | $1,000.00 | $450.00 | $659.02 |
| 0550 | Temporary pipe (665C010) | LF | 60 | $20.00 | $26.25 | $200.00 | $145.00 | $25.00 | $26.36 |
| 0560 | Polyethylene (665E000) | SY | 500 | $3.29 | $5.39 | $10.00 | $5.00 | $5.50 | $2.92 |
| 0570 | Silt fence (665J002) | LF | 2,581 | $5.88 | $4.12 | $6.00 | $6.25 | $4.50 | $5.22 |
| 0580 | Temporary coarse aggregate,aldot number 1 (665N000) | TON | 59 | $82.00 | $63.21 | $75.00 | $77.00 | $49.04 | $51.71 |
| 0590 | Silt fence removal (665O001) | LF | 2,581 | $2.38 | $1.21 | $2.00 | $1.25 | $2.00 | $2.11 |
| 0600 | Inlet protection, stage 3 or 4 (665P005) | EACH | 2 | $89.15 | $551.25 | $450.00 | $500.00 | $450.00 | $79.09 |
| 0610 | Wattle, 20 inch (665Q020) | LF | 344 | $10.70 | $8.56 | $14.00 | $15.00 | $12.00 | $9.49 |
| 0620 | Pest control treatment (666A001) | ACRE | 2 | $31.28 | $787.50 | $150.00 | $500.00 | $2,625.00 | $55.50 |
| 0630 | Construction safety fence (674A000) | LF | 500 | $4.00 | $4.36 | $10.00 | $5.00 | $4.00 | $3.32 |
| 0640 | Geometric controls (680A001) | LS | 1 | $20,000 | $81,165 | $35,000 | $25,000 | $30,650 | $32,410 |
| 0650 | Construction fuel (maximum bid limited to $ 76,750.00) (698A000) | LS | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $10.00 | $0.00 |
| 0660 | Solid white, class 2, type A traffic stripe (5" wide) (701A227) | MI | 2 | $4,817.37 | $4,235.00 | $6,336.00 | $4,158.00 | $4,200.00 | $4,273.26 |
| 0670 | Solid yellow, class 2, type A traffic stripe (5" wide) (701A230) | MI | 2 | $4,817.37 | $4,235.00 | $6,336.00 | $4,158.00 | $4,200.00 | $4,273.26 |
| 0680 | Solid temporary traffic stripe (701C001) | MI | 7 | $1,188.70 | $1,045.00 | $1,188.00 | $1,380.00 | $1,050.00 | $1,054.44 |
| 0690 | Solid white, class 2, type A traffic stripe (6" wide) (rumble strip) (701G251) | LF | 300 | $7.51 | $6.60 | $9.60 | $10.50 | $6.50 | $6.66 |
| 0700 | Traffic control markings, class 2, type A (703A002) | SF | 1,205 | $5.01 | $4.40 | $12.00 | $6.50 | $4.50 | $4.44 |
| 0710 | Temporary traffic control markings (703D001) | SF | 2,409 | $1.25 | $1.10 | $2.40 | $3.50 | $1.50 | $1.11 |
| 0720 | Pavement markers, class A-H, type 2-D (705A037) | EACH | 113 | $12.51 | $11.00 | $7.20 | $6.50 | $11.00 | $11.10 |
| 0730 | Class 10 aluminum flat sign panels (type XI background) (710A163) | SF | 8 | $37.54 | $33.00 | $36.00 | $34.00 | $33.00 | $33.30 |
| 0740 | Class 10 aluminum flat sign panels (type XI background, fluorescent) (710A164) | SF | 8 | $37.54 | $33.00 | $36.00 | $34.00 | $38.00 | $33.30 |
| 0750 | Class 4, aluminum flat sign panels (type IV background) (710A171) | SF | 12 | $32.53 | $28.60 | $31.20 | $30.00 | $28.00 | $28.86 |
| 0760 | Roadway sign post (#3 U channel, galvanized steel or 2 ", 14 GA square tubular steel) (710B021) | LF | 56 | $25.03 | $22.00 | $24.00 | $23.00 | $20.00 | $22.20 |
| 0770 | Construction signs (740B000) | SF | 453 | $7.51 | $6.60 | $7.20 | $7.00 | $10.00 | $6.66 |
| 0780 | Special construction signs (740C000) | SF | 14 | $8.76 | $7.70 | $8.40 | $8.00 | $10.00 | $7.77 |
| 0790 | Channelizing drums (740D000) | EACH | 50 | $37.54 | $33.00 | $36.00 | $34.00 | $60.00 | $33.30 |
| 0800 | Cones (36 inches high) (740E000) | EACH | 70 | $30.03 | $26.40 | $28.80 | $28.00 | $25.00 | $26.64 |
| 0810 | Barricades, type III (740F002) | EACH | 8 | $250.25 | $200.00 | $240.00 | $226.00 | $325.00 | $221.99 |
| 0820 | Warning lights, type B (740I002) | EACH | 4 | $250.25 | $200.00 | $240.00 | $226.00 | $165.00 | $221.99 |
| 0830 | Portable changeable message sign, type 2 (742A001) | EACH | 2 | $5,005.06 | $4,400.00 | $4,800.00 | $4,520.00 | $6,500.00 | $4,439.75 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
Every contract let that day: ALDOT letting of July 31, 2026. Compiled by Mirage Metrics.