Ikaros, LLC: ALDOT bid record
Ikaros, LLC submitted 23 bids on Alabama DOT contracts in the data, from 25 FEB 2022 to 31 JUL 2026, and was the low bidder on 6 of them (26%). When it was not low, its total sat a median +19% above the low bid.
- Owner
- Alabama DOT
- Low bid volume
- $28,586,500
- Latest bid
- 31 JUL 2026
- Data through
- 28 AUG 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 5 | 0 | 0% |
| 2023 | 6 | 2 | 33% |
| 2024 | 2 | 0 | 0% |
| 2025 | 7 | 2 | 29% |
| 2026 | 3 | 2 | 67% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| 0502 | 10 | 4 | 40% |
| 0301 | 6 | 1 | 17% |
| 1003 | 2 | 1 | 50% |
| 1008 | 1 | 0 | 0% |
| 0802 | 1 | 0 | 0% |
| 0505 | 1 | 0 | 0% |
| 0504 | 1 | 0 | 0% |
| 0105 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Unclassified excavation | 210A000 | CY | 23 | 8 (35%) | $25.00 | $32.97 |
| Right of way markers | 602A000 | EACH | 19 | 8 (42%) | $600.00 | $687.50 |
| Trainee hours at 80 cents per hour | 999 000 | HR | 7 | 7 (100%) | $0.80 | $0.80 |
| Silt fence | 665J002 | LF | 22 | 6 (27%) | $4.69 | $5.00 |
| Silt fence removal | 665O001 | LF | 21 | 6 (29%) | $1.24 | $1.45 |
| Foundation backfill, commercial | 214B001 | CY | 14 | 6 (43%) | $60.00 | $86.75 |
| Borrow excavation (A4 or better) | 210D011 | CY | 14 | 6 (43%) | $19.00 | $23.71 |
| Roadway sign post (#3 U channel, galvanized steel or 2 ", 14 GA square tubular steel) | 710B021 | LF | 15 | 5 (33%) | $18.91 | $20.21 |
| Polyethylene | 665E000 | SY | 14 | 5 (36%) | $3.42 | $3.56 |
| Pest control treatment | 666A001 | ACRE | 12 | 5 (42%) | $45.64 | $115.00 |
| Scoring bituminous pavement surface | 428A001 | MI | 11 | 5 (45%) | $400.00 | $486.51 |
| Filter blanket, geotextile | 610D003 | SY | 23 | 4 (17%) | $6.00 | $5.47 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| GFC Construction, Inc. | 8 | 5 of 8 |
| Gillespie Construction, LLC | 7 | 3 of 7 |
| Carcel & G. Construction, LLC | 7 | 6 of 7 |
| Wright Brothers Construction Company, Inc. | 6 | 0 of 6 |
| John Plott Company, Inc. | 4 | 2 of 4 |
| The Bridge Builders of Alabama, LLC | 4 | 2 of 4 |
| McInnis Construction, LLC | 4 | 4 of 4 |
| Glasgow Construction Co., Inc. | 3 | 2 of 3 |
| Bulls Construction Group, LLC | 3 | 1 of 3 |
| Cornerstone Civil Contractors, LLC | 3 | 1 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 31 JUL 2026 | 20260731001 | 0301 | ROADWAY AND DRAINAGE IMPROVEMENTS (GRADING, DRAINAGE, PAVEMENT (RESURFACING), AND TRAFFIC STRIPE) ON CR-337 (MCCALLA ROAD) FROM THE JUNCTION | 1 of 6 | $1,678,000 | Low, 1.0% under the second |
| 24 APR 2026 | 20260424019 | 0502 | STRUCTURAL REMOVAL ON SR-216 AT THE I-20/I-59 INTERCHANGE (EXIT 100) EAST OF LAKEVIEW | 1 of 2 | $191,500 | Low, 15% under the second |
| 30 JAN 2026 | 20260130001 | 0105 | BRIDGE REPLACEMENT TO INCLUDE ROADAWAY RE-ALIGNMENT ON SR-205 OVER THE ALABAMA AND TENNESSEE RIVER RAILWAY, LLC (ATN) AND OLD GUNTERSVILLE G | 5 of 6 | $6,050,000 | +24% |
| 05 DEC 2025 | 20251205065 | 0502 | INTERSECTION IMPROVEMENTS ON SR-13 (US-43) AT ROSE BOULEVARD/MITT LARY ROAD IN NORTHPORT | 5 of 7 | $2,222,000 | +20% |
| 26 SEP 2025 | 20250926005 | 1003 | BRIDGE REPLACEMENT (GRADE, DRAIN, PAVE, AND BRIDGE REMOVAL) ON SR-14 OVER THE SIPSEY RIVER | 3 of 3 | $8,400,000 | +3.0% |
| 29 AUG 2025 | 20250829009 | 0301 | DRAINAGE IMPROVEMENTS AND PIPE REHABILITATION ON I-459 FROM A POINT NEAR MP 19.280 TO A POINT NEAR MP 19.394 SOUTHEAST OF VESTAVIA HILLS | 5 of 5 | $850,000 | +39% |
| 29 AUG 2025 | 20250829022 | 0301 | RELOACTION AND INTERSECTION IMPROVEMENTS ON LAKESHORE PARKWAY AND MORGAN ROAD FROM CUMBERLAND ROAD TO TURNIN DRIVE IN BESSEMER | 3 of 6 | $21,710,000 | +15% |
| 25 JUL 2025 | 20250725029 | 0502 | INTERSECTION IMPROVEMENTS AND ADDITIONAL THRU LANES ON I-20/I-59 AT THE DAIMLER BENZ BOULEVARD INTERCHANGE (EXIT 89) IN VANCE | 1 of 4 | $2,300,000 | Low, 13% under the second |
| 31 JAN 2025 | 20250131004 | 0502 | BRIDGE REPLACEMENT ON SR-6 (US-82) OVER BIG CREEK IN COKER | 1 of 2 | $9,900,000 | Low, 21% under the second |
| 31 JAN 2025 | 20250131009 | 0301 | REPAIR AND REPLACEMENT OF ENTRANCE AND EXIT RAMPS ON I-20/I-59 AT MCASHAN DRIVE (EXIT 104) AND THE NORTHBOUND AND SOUTHBOUND RAMPS SOUTHWEST | 2 of 2 | $19,500,000 | +10% |
| 30 AUG 2024 | 20240830001 | 0502 | BRIDGE REMOVAL (GRADING, DRAINAGE, BASE, AND PAVEMENT) ON SR-7 (US-11) OVER THE ABANDONED L AND N RAILROAD NEAR CHAMBLEE AVENUE NORTHEAST OF | 2 of 6 | $2,430,000 | +14% |
| 30 AUG 2024 | 20240830025 | 0502 | ROADWAY IMPROVEMENTS (ADDITIONAL CENTER TURN LANE) ON CR-47 (MARTIN LUTHER KING, JR. BOULEVARD) FROM THE JUNCTION OF BRIDGE AVENUE TO THE JU | 5 of 5 | $19,000,000 | +34% |
| 29 SEP 2023 | 20230929001 | 0502 | BRIDGE REPLACEMENT (GRADING, DRAINAGE, PAVEMENT, AND BRIDGE) ON SR-7 (US-11) OVER THE NORFOLK SOUTHERN RAILWAY IN COTTONDALE | 3 of 3 | $9,876,500 | +59% |
| 28 JUL 2023 | 20230728001 | 1003 | BRIDGE REPLACEMENT (GRADING, DRAINAGE, PAVEMENT, AND BRIDGE) ON SR-14 OVER LUBBUB CREEK SOUTH OF ALICEVILLE | 1 of 3 | $12,255,000 | Low, 15% under the second |
| 28 JUL 2023 | 20230728032 | 0502 | BRIDGE REPLACEMENT ON CR-47 OVER TWO MILE CREEK FROM THE JUNCTION OF RED BIRD DRIVE TO THE JUNCTION OF PARK COURT | 2 of 3 | $4,850,000 | +1.0% |
| 07 APR 2023 | 20230407017 | 0502 | BRIDGE REPLACEMENTS AND APPROACHES ON CR-124 (OLD FAYETTE ROAD) OVER BARBEE CREEK AND OVER AN UNNAMED TRIBUTARY TO BINION CREEK WEST OF SAMA | 1 of 4 | $2,262,000 | Low, 5.0% under the second |
| 27 JAN 2023 | 20230127004 | 0505 | BRIDGE REPLACMENTS AND APPROACHES ON CR-40 (GREER CREEK ROAD) OVER GREER CREEK AND A TRIBUTARY TO GREER CREEK | 3 of 5 | $1,555,000 | +18% |
| 27 JAN 2023 | 20230127008 | 0504 | BRIDGE REPLACEMENTS ON SR-5 OVER BLUE GIRTH CREEK AND BLUE GIRTH CREEK RELIEF | 3 of 4 | $10,700,000 | +28% |
| 27 MAY 2022 | 20220527001 | 0802 | BRIDGE REPLACEMENT (GRADING, DRAINAGE, PAVEMENT, AND BRIDGE) ON SR-5 OVER MUD CREEK | 3 of 4 | $5,432,100 | +10% |
| 29 APR 2022 | 20220429001 | 0301 | SAFETY IMPROVEMENTS (CURB & GUTTER, DRAINAGE, SIDEWALK) ON CR-1142 (CHAPEL ROAD) FROM THE INTERSECTION OF PARK AVENUE TO THE JUNCTION OF STO | 2 of 3 | $1,950,000 | 0.0% |
| 29 APR 2022 | 20220429036 | 0301 | ROADWAY IMPROVEMENTS (GRADE, DRAIN, PAVE, SIDEWALK, CULVERT) ON POLLY REED ROAD FROM THE JUNCTION OF SR-75 TO THE JUNCTION OF REED ROAD NORT | 3 of 5 | $12,000,000 | +34% |
| 25 MAR 2022 | 20220325001 | 1008 | BRIDGE REPLACEMENT (GRADING, DRAINAGE, PAVEMENT, AND BRIDGE) ON CR-64 (BROWNS BRIDGE ROAD) OVER LOST CREEK | 6 of 7 | $2,660,000 | +19% |
| 25 FEB 2022 | 20220225001 | 0502 | WIDENING, RESURFACING, AND TRAFFIC STRIPE ON FOSTERS FERRY ROAD FROM THE JUNCTION OF JOE MALLISHAM PARKWAY TO THE JUNCTION OF 29TH STREET IN | 2 of 3 | $5,800,000 | +25% |
How this record was read
ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
- Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.