Wright Brothers Construction Company, Inc.: ALDOT bid record

Wright Brothers Construction Company, Inc. submitted 21 bids on Alabama DOT contracts in the data, from 25 MAR 2022 to 30 JAN 2026, and was the low bidder on 2 of them (10%). When it was not low, its total sat a median +24% above the low bid.

Owner
Alabama DOT
Low bid volume
$12,135,866
Latest bid
30 JAN 2026
Data through
28 AUG 2026
21Bids
2Low bids
10Win rate, percent
+24%Median gap to the low bid when not low, 19 bids

By year

YearBidsLow bidsWin rate
20225120%
20239111%
2024400%
2025100%
2026200%
Wright Brothers Construction Company, Inc., ALDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
03014125%
0302400%
1008200%
0202200%
0504200%
0201100%
0103100%
0511100%
1003100%
0502100%
0305100%
0105100%
Wright Brothers Construction Company, Inc., ALDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Trainee hours at 80 cents per hour999 000HR1212 (100%)$0.80$0.80
Minor structure concrete620A000CY139 (69%)$2,500.00$2,279.07
Channelizing drums740D000EACH208 (40%)$42.25$33.00
Right of way markers602A000EACH188 (44%)$590.00$687.50
Grooving concrete bridge decks510E000SY157 (47%)$3.30$5.92
Silt fence665J002LF216 (29%)$5.70$5.00
Silt fence removal665O001LF216 (29%)$1.30$1.45
Barricades, type III740F002EACH206 (30%)$260.50$252.14
Steel reinforcement502A000LB196 (32%)$1.46$2.00
Wattle665Q002LF195 (26%)$11.75$10.75
Guardrail end anchor, type 20 series (MASH)630C080EACH185 (28%)$3,860.00$3,785.66
Cones (36 inches high)740E000EACH155 (33%)$25.50$20.47
Wright Brothers Construction Company, Inc., ALDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
The Bridge Builders of Alabama, LLC77 of 7
McInnis Construction, LLC76 of 7
Ikaros, LLC66 of 6
Dement Construction Company, LLC51 of 5
Riley Bridge Company, Inc.44 of 4
Miller & Miller, Inc.44 of 4
Chilton Contractors, Inc.43 of 4
Russo Corporation31 of 3
Whitaker Contracting Corporation32 of 3
Wiregrass Construction Company, Inc.32 of 3
Wright Brothers Construction Company, Inc., ALDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
30 JAN 2026202601300010105BRIDGE REPLACEMENT TO INCLUDE ROADAWAY RE-ALIGNMENT ON SR-205 OVER THE ALABAMA AND TENNESSEE RIVER RAILWAY, LLC (ATN) AND OLD GUNTERSVILLE G6 of 6$7,453,351+53%
30 JAN 2026202601300030504BRIDGE REPLACEMENT (GRADE, DRAIN, PAVE, ITS, AND BRIDGE) ON I-65 (DUAL BRIDGES) OVER WALNUT CREEK IN CLANTON3 of 3$23,904,776+8.0%
25 JUL 2025202507250010301INTERCHANGE MODIFICATIONS ON SR-149 (LAKESHORE PARKWAY) AT THE I-65 INTERCHANGE IN HOMEWOOD3 of 7$25,278,002+8.0%
30 AUG 2024202408300020202BRIDGE REPLACEMENT AND APPROACHES ON SR-247 OVER LITTLE BEAR CREEK NORTHEAST OF RED BAY4 of 4$3,917,254+18%
28 JUN 2024202406280210305BRIDGE REPLACEMENT BRIDGE REPLACEMENT ON CR-55 OVER THE CENTRAL OF GEORGIA RAILWAY SOUTH OF STERRETT2 of 2$3,879,200+20%
29 MAR 2024202403290010301BASE, PAVE, AND BRIDGES ON THE BIRMINGHAM NORTHERN BELTLINE FROM THE JUNCTION OF SR-79 TO THE JUNCTION OF SR-75 (PARTIAL), EXCLUDING RAMP C2 of 3$71,999,830+11%
26 JAN 2024202401260010302BRIDGE REPLACEMENT (GRADE, DRAIN, PAVE, AND BRIDGE) ON SR-79 OVER BLACKBURN FORK OF THE LITTLE WARRIOR RIVER NORTHEAST OF LOCUST FORK4 of 5$11,938,653+30%
25 AUG 2023202308250280302INTERSECTION IMPROVEMENTS (GRADE, DRAIN, PAVEMENT & SIGNAL) ON SR-7 (US-11) AT SR-174 AND CR-9 TO INCLUDE TURN LANE INSTALLATIONS AT ALL FOU3 of 4$3,144,560+30%
28 JUL 2023202307280011003BRIDGE REPLACEMENT (GRADING, DRAINAGE, PAVEMENT, AND BRIDGE) ON SR-14 OVER LUBBUB CREEK SOUTH OF ALICEVILLE2 of 3$14,099,935+15%
28 JUL 2023202307280050302INTERSECTION IMPROVEMENTS (GRADE, DRAIN, PAVE, AND SIGNALS) ON SR-25 (US-411) AT CR-10 (PARK AVENUE) IN MOODY3 of 3$1,717,848+13%
28 JUL 2023202307280320502BRIDGE REPLACEMENT ON CR-47 OVER TWO MILE CREEK FROM THE JUNCTION OF RED BIRD DRIVE TO THE JUNCTION OF PARK COURT3 of 3$5,774,811+21%
30 JUN 20232023063000105BRIDGE REPLACEMENT AND INTERSECTION IMPROVEMENTS ON SR-5 OVER THE SR-69 (US-78A) UNDERPASS IN JASPER1 of 2$8,802,655Low, 4.0% under the second
30 JUN 2023202306300080302INTERSECTION IMPROVEMENTS ON SR-160 AT THE I-65 INTERCHANGE RAMPS AND AT SR-3 (US-31) IN SMOKE RISE3 of 4$11,667,001+34%
07 APR 2023202304070020103BRIDGE REPLACEMENT AND APPROACHES ON SR-75 OVER TOWN CREEK IN LAKEVIEW3 of 4$15,693,951+15%
27 JAN 2023202301270051008BRIDGE REPLACEMENT AND APPROACHES ON SMITH CHAPEL ROAD OVER MILL CREEK EAST OF CARBON HILL3 of 3$2,520,933+43%
27 JAN 2023202301270080504BRIDGE REPLACEMENTS ON SR-5 OVER BLUE GIRTH CREEK AND BLUE GIRTH CREEK RELIEF4 of 4$10,799,914+29%
29 JUL 2022202207290010202BRIDGE REPLACEMENT (GRADING, DRAINAGE, PAVEMENT, AND BRIDGE) ON SR-247 OVER CEDAR CREEK4 of 6$5,623,047+27%
29 APR 2022202204290360301ROADWAY IMPROVEMENTS (GRADE, DRAIN, PAVE, SIDEWALK, CULVERT) ON POLLY REED ROAD FROM THE JUNCTION OF SR-75 TO THE JUNCTION OF REED ROAD NORT4 of 5$12,141,527+36%
25 MAR 2022202203250011008BRIDGE REPLACEMENT (GRADING, DRAINAGE, PAVEMENT, AND BRIDGE) ON CR-64 (BROWNS BRIDGE ROAD) OVER LOST CREEK7 of 7$2,985,034+34%
25 MAR 2022202203250040301PEDESTRIAN BRIDGE (GRADING, BRIDGE, AND LIGHTING) OVER SR-150 BETWEEN BERKLEY AVENUE AND CLARENDON AVENUE IN BESSEMER1 of 2$3,333,211Low, 3.0% under the second
25 MAR 2022202203250550201BRIDGE REPLACEMENT (GRADING, DRAINAGE, PAVEMENT, AND BRIDGE) ON CR-16 OVER CYPRESS CREEK NORTHWEST OF FLORENCE7 of 8$6,145,339+24%
Wright Brothers Construction Company, Inc.: latest ALDOT bids in the data

How this record was read

ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.

  • Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy