Chilton Contractors, Inc. submitted 15 bids on Alabama DOT contracts in the data, from 28 JAN 2022 to 30 JAN 2026, and was the low bidder on 5 of them (33%). When it was not low, its total sat a median +29% above the low bid.
- Owner
- Alabama DOT
- Low bid volume
- $60,771,881
- Latest bid
- 30 JAN 2026
- Data through
- 28 AUG 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 3 | 1 | 33% |
| 2023 | 5 | 2 | 40% |
| 2024 | 4 | 0 | 0% |
| 2025 | 2 | 2 | 100% |
| 2026 | 1 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| 0301 | 4 | 2 | 50% |
| 0302 | 3 | 1 | 33% |
| 0903 | 2 | 0 | 0% |
| 0504 | 2 | 1 | 50% |
| 0606 | 1 | 0 | 0% |
| 0702 | 1 | 0 | 0% |
| 0603 | 1 | 0 | 0% |
| 0305 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Trainee hours at 80 cents per hour | 999 000 | HR | 7 | 7 (100%) | $0.80 | $0.80 |
| Silt fence removal | 665O001 | LF | 14 | 6 (43%) | $1.11 | $1.45 |
| Temporary mulching | 665B001 | TON | 12 | 5 (42%) | $519.84 | $545.62 |
| Temporary seeding | 665A000 | ACRE | 11 | 5 (45%) | $428.17 | $900.00 |
| Solid sodding (bermuda) | 654A001 | SY | 11 | 5 (45%) | $9.47 | $8.94 |
| Filter blanket, geotextile | 610D003 | SY | 14 | 4 (29%) | $4.14 | $5.47 |
| Traffic control markings, class 2, type A | 703A002 | SF | 12 | 4 (33%) | $6.38 | $6.00 |
| Topsoil | 650A000 | CY | 12 | 4 (33%) | $26.88 | $45.00 |
| Unclassified excavation | 210A000 | CY | 12 | 4 (33%) | $21.99 | $32.97 |
| Minor structure concrete | 620A000 | CY | 12 | 4 (33%) | $2,800.76 | $2,279.07 |
| Portable changeable message sign, type 2 | 742A001 | EACH | 11 | 4 (36%) | $9,683.33 | $4,210.53 |
| Roadway sign post (#3 U channel, galvanized steel or 2 ", 14 GA square tubular steel) | 710B021 | LF | 11 | 4 (36%) | $18.77 | $20.21 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Russo Corporation | 4 | 1 of 4 |
| Wright Brothers Construction Company, Inc. | 4 | 1 of 4 |
| Whitaker Contracting Corporation | 4 | 3 of 4 |
| Carcel & G. Construction, LLC | 4 | 2 of 4 |
| Wiregrass Construction Company, Inc. | 3 | 2 of 3 |
| Gillespie Construction, LLC | 2 | 1 of 2 |
| Ikaros, LLC | 2 | 1 of 2 |
| Bulls Construction Group, LLC | 2 | 1 of 2 |
| D & J Enterprises, Inc. | 1 | 1 of 1 |
| Blount Construction Company, Inc. | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 30 JAN 2026 | 20260130013 | 0504 | CABLE GUIDERAIL REMOVAL, MEDIAN GRADING, DRAINAGE IMPROVEMENTS, AND DOUBLE-FACED GUARDRAIL INSTALLATION ON I-65 FROM THE WALNUT CREEK BRIDGE | 2 of 2 | $9,292,029 | +16% |
| 29 AUG 2025 | 20250829022 | 0301 | RELOACTION AND INTERSECTION IMPROVEMENTS ON LAKESHORE PARKWAY AND MORGAN ROAD FROM CUMBERLAND ROAD TO TURNIN DRIVE IN BESSEMER | 1 of 6 | $18,948,037 | Low, 4.0% under the second |
| 30 MAY 2025 | 20250530001 | 0305 | ROADWAY IMPROVEMENTS (ADD LANES AND BRIDGE RAISING) ON I-65 FROM A POINT 0.200 MILE SOUTH OF THE CR-87 INTERCHANGE IN CALERA TO A POINT 0.56 | 1 of 4 | $31,782,578 | Low, 5.0% under the second |
| 28 JUN 2024 | 20240628018 | 0903 | ROADWAY IMPROVEMENTS/ADDITIONAL LANES ON SR-12 (US-84) FROM A POINT NEAR MP 96.300 TO THE I-65 INTERCHANGE IN EVERGREEN | 2 of 7 | $11,984,722 | +1.0% |
| 31 MAY 2024 | 20240531007 | 0603 | ROADWAY IMPROVEMENTS (ROUNDABOUT INSTALLATIONS) ON SR-126 AT SR-8 (US-80) AND ON SR-8 (US-80) AT MARLER ROAD EAST OF MONTGOMERY | 5 of 5 | $6,379,346 | +31% |
| 26 JAN 2024 | 20240126001 | 0302 | BRIDGE REPLACEMENT (GRADE, DRAIN, PAVE, AND BRIDGE) ON SR-79 OVER BLACKBURN FORK OF THE LITTLE WARRIOR RIVER NORTHEAST OF LOCUST FORK | 3 of 5 | $11,395,845 | +24% |
| 26 JAN 2024 | 20240126052 | 0702 | ADDITIONAL LANES AND ROUTE RELOCATION ON SR-52 FROM EAST OF COX STREET IN SLOCOMB TO THE JUNCTION OF SCOTT ROAD IN MALVERN | 4 of 4 | $32,455,567 | +41% |
| 29 SEP 2023 | 20230929023 | 0903 | SANITARY SEWER LINE ON I-65 FROM THE NORTHBOUND ROADWAY REST AREA TO THE SOUTHBOUND ROADWAY REST AREA SOUTHWEST OF EVERGREEN | 2 of 2 | $3,090,107 | +64% |
| 29 SEP 2023 | 20230929043 | 0504 | INTERSECTION IMPROVEMENTS ON COUNTRY CLUB DRIVE AND POPLAR SPRINGS ROAD WITH A NEW CONNECTOR ROAD TO SR-3 (US-31) IN CLANTON | 1 of 1 | $871,107 | Low |
| 25 AUG 2023 | 20230825028 | 0302 | INTERSECTION IMPROVEMENTS (GRADE, DRAIN, PAVEMENT & SIGNAL) ON SR-7 (US-11) AT SR-174 AND CR-9 TO INCLUDE TURN LANE INSTALLATIONS AT ALL FOU | 1 of 4 | $2,412,339 | Low, 10% under the second |
| 30 JUN 2023 | 20230630008 | 0302 | INTERSECTION IMPROVEMENTS ON SR-160 AT THE I-65 INTERCHANGE RAMPS AND AT SR-3 (US-31) IN SMOKE RISE | 2 of 4 | $10,899,994 | +26% |
| 27 JAN 2023 | 20230127071 | 0301 | SAFETY IMPROVEMENTS (SIGNAL RELOCATION AND IMPROVEMENTS) ON CR-193 (HAZELWOOD DRIVE) FROM THE JUNCTION OF VETERANS PARKWAY TO THE JUNCTION O | 3 of 4 | $2,859,407 | +42% |
| 29 JUL 2022 | 20220729005 | 0301 | GRADE, DRAIN, PAVE, BRIDGE, BOARDWALK, SIGNS, & LANDSCAPING SHADES CREEK GREENWAY MULTI-PURPOSE TRAIL - PHASE TWO | 1 of 3 | $6,757,819 | Low, 19% under the second |
| 29 APR 2022 | 20220429036 | 0301 | ROADWAY IMPROVEMENTS (GRADE, DRAIN, PAVE, SIDEWALK, CULVERT) ON POLLY REED ROAD FROM THE JUNCTION OF SR-75 TO THE JUNCTION OF REED ROAD NORT | 5 of 5 | $13,730,632 | +54% |
| 28 JAN 2022 | 20220128007 | 0606 | FULL DEPTH RECLAMATION, RESURFACING, AND TRAFFIC STRIPE ON CR-318 FROM CR-248 TO CR-249 (SITE 1) AND ON CR-249 FROM CR-379 TO CR-318 (SITE 2 | 2 of 3 | $2,621,559 | +5.0% |
How this record was read
ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
- Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.