Chilton Contractors, Inc.: ALDOT bid record

Chilton Contractors, Inc. submitted 15 bids on Alabama DOT contracts in the data, from 28 JAN 2022 to 30 JAN 2026, and was the low bidder on 5 of them (33%). When it was not low, its total sat a median +29% above the low bid.

Owner
Alabama DOT
Low bid volume
$60,771,881
Latest bid
30 JAN 2026
Data through
28 AUG 2026
15Bids
5Low bids
33Win rate, percent
+29%Median gap to the low bid when not low, 10 bids

By year

YearBidsLow bidsWin rate
20223133%
20235240%
2024400%
202522100%
2026100%
Chilton Contractors, Inc., ALDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
03014250%
03023133%
0903200%
05042150%
0606100%
0702100%
0603100%
030511100%
Chilton Contractors, Inc., ALDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Trainee hours at 80 cents per hour999 000HR77 (100%)$0.80$0.80
Silt fence removal665O001LF146 (43%)$1.11$1.45
Temporary mulching665B001TON125 (42%)$519.84$545.62
Temporary seeding665A000ACRE115 (45%)$428.17$900.00
Solid sodding (bermuda)654A001SY115 (45%)$9.47$8.94
Filter blanket, geotextile610D003SY144 (29%)$4.14$5.47
Traffic control markings, class 2, type A703A002SF124 (33%)$6.38$6.00
Topsoil650A000CY124 (33%)$26.88$45.00
Unclassified excavation210A000CY124 (33%)$21.99$32.97
Minor structure concrete620A000CY124 (33%)$2,800.76$2,279.07
Portable changeable message sign, type 2742A001EACH114 (36%)$9,683.33$4,210.53
Roadway sign post (#3 U channel, galvanized steel or 2 ", 14 GA square tubular steel)710B021LF114 (36%)$18.77$20.21
Chilton Contractors, Inc., ALDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Russo Corporation41 of 4
Wright Brothers Construction Company, Inc.41 of 4
Whitaker Contracting Corporation43 of 4
Carcel & G. Construction, LLC42 of 4
Wiregrass Construction Company, Inc.32 of 3
Gillespie Construction, LLC21 of 2
Ikaros, LLC21 of 2
Bulls Construction Group, LLC21 of 2
D & J Enterprises, Inc.11 of 1
Blount Construction Company, Inc.10 of 1
Chilton Contractors, Inc., ALDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
30 JAN 2026202601300130504CABLE GUIDERAIL REMOVAL, MEDIAN GRADING, DRAINAGE IMPROVEMENTS, AND DOUBLE-FACED GUARDRAIL INSTALLATION ON I-65 FROM THE WALNUT CREEK BRIDGE2 of 2$9,292,029+16%
29 AUG 2025202508290220301RELOACTION AND INTERSECTION IMPROVEMENTS ON LAKESHORE PARKWAY AND MORGAN ROAD FROM CUMBERLAND ROAD TO TURNIN DRIVE IN BESSEMER1 of 6$18,948,037Low, 4.0% under the second
30 MAY 2025202505300010305ROADWAY IMPROVEMENTS (ADD LANES AND BRIDGE RAISING) ON I-65 FROM A POINT 0.200 MILE SOUTH OF THE CR-87 INTERCHANGE IN CALERA TO A POINT 0.561 of 4$31,782,578Low, 5.0% under the second
28 JUN 2024202406280180903ROADWAY IMPROVEMENTS/ADDITIONAL LANES ON SR-12 (US-84) FROM A POINT NEAR MP 96.300 TO THE I-65 INTERCHANGE IN EVERGREEN2 of 7$11,984,722+1.0%
31 MAY 2024202405310070603ROADWAY IMPROVEMENTS (ROUNDABOUT INSTALLATIONS) ON SR-126 AT SR-8 (US-80) AND ON SR-8 (US-80) AT MARLER ROAD EAST OF MONTGOMERY5 of 5$6,379,346+31%
26 JAN 2024202401260010302BRIDGE REPLACEMENT (GRADE, DRAIN, PAVE, AND BRIDGE) ON SR-79 OVER BLACKBURN FORK OF THE LITTLE WARRIOR RIVER NORTHEAST OF LOCUST FORK3 of 5$11,395,845+24%
26 JAN 2024202401260520702ADDITIONAL LANES AND ROUTE RELOCATION ON SR-52 FROM EAST OF COX STREET IN SLOCOMB TO THE JUNCTION OF SCOTT ROAD IN MALVERN4 of 4$32,455,567+41%
29 SEP 2023202309290230903SANITARY SEWER LINE ON I-65 FROM THE NORTHBOUND ROADWAY REST AREA TO THE SOUTHBOUND ROADWAY REST AREA SOUTHWEST OF EVERGREEN2 of 2$3,090,107+64%
29 SEP 2023202309290430504INTERSECTION IMPROVEMENTS ON COUNTRY CLUB DRIVE AND POPLAR SPRINGS ROAD WITH A NEW CONNECTOR ROAD TO SR-3 (US-31) IN CLANTON1 of 1$871,107Low
25 AUG 2023202308250280302INTERSECTION IMPROVEMENTS (GRADE, DRAIN, PAVEMENT & SIGNAL) ON SR-7 (US-11) AT SR-174 AND CR-9 TO INCLUDE TURN LANE INSTALLATIONS AT ALL FOU1 of 4$2,412,339Low, 10% under the second
30 JUN 2023202306300080302INTERSECTION IMPROVEMENTS ON SR-160 AT THE I-65 INTERCHANGE RAMPS AND AT SR-3 (US-31) IN SMOKE RISE2 of 4$10,899,994+26%
27 JAN 2023202301270710301SAFETY IMPROVEMENTS (SIGNAL RELOCATION AND IMPROVEMENTS) ON CR-193 (HAZELWOOD DRIVE) FROM THE JUNCTION OF VETERANS PARKWAY TO THE JUNCTION O3 of 4$2,859,407+42%
29 JUL 2022202207290050301GRADE, DRAIN, PAVE, BRIDGE, BOARDWALK, SIGNS, & LANDSCAPING SHADES CREEK GREENWAY MULTI-PURPOSE TRAIL - PHASE TWO1 of 3$6,757,819Low, 19% under the second
29 APR 2022202204290360301ROADWAY IMPROVEMENTS (GRADE, DRAIN, PAVE, SIDEWALK, CULVERT) ON POLLY REED ROAD FROM THE JUNCTION OF SR-75 TO THE JUNCTION OF REED ROAD NORT5 of 5$13,730,632+54%
28 JAN 2022202201280070606FULL DEPTH RECLAMATION, RESURFACING, AND TRAFFIC STRIPE ON CR-318 FROM CR-248 TO CR-249 (SITE 1) AND ON CR-249 FROM CR-379 TO CR-318 (SITE 22 of 3$2,621,559+5.0%
Chilton Contractors, Inc.: latest ALDOT bids in the data

How this record was read

ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.

  • Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy