ALDOT letting results, May 31, 2024

14 contracts let by Alabama DOT on May 31, 2024, $80,247,163 in low bids, a median of 2 bidders per contract.

Owner
Alabama DOT
Contracts
14
Low bids, total
$80,247,163
Data through
28 AUG 2026

Contracts let that day

ContractProjectDistrictBidsLow bidderLow bidSecond bidGapSource
20240531038NEW ROADWAY CONSTRUCTION OF THE SR-161 CONNECTOR FROM A POINT NORTH OF THE JUNCTION OF CR-4 TO THE JUNCTION OF THE FOLEY BEACH EXPRESS09024John G. Walton Construction Company, Inc.$29,928,778$30,670,264+2.0%ALDOT
20240531020RESURFACE AND ADD LANES (GRADE, DRAIN, BRIDGE WIDEN, STRIPE) ON I-565 FROM A POINT WEST OF THE COUNTY LINE ROAD INTERCHANGE TO A POINT EAST OF THE WALL TRIANA H01024Wiregrass Construction Company, Inc.$28,992,351$29,881,125+3.0%ALDOT
20240531007ROADWAY IMPROVEMENTS (ROUNDABOUT INSTALLATIONS) ON SR-126 AT SR-8 (US-80) AND ON SR-8 (US-80) AT MARLER ROAD EAST OF MONTGOMERY06035CB&A Construction, LLC.$4,854,127$5,588,167+15%ALDOT
20240531029RESURFACE (SCRUB SEAL), STEEL BLOCKOUT REPLACEMENT, & STRIPE ON SR-10, SR-59, SR-17, SR-21, SR-41, AND SR-154 AT VARIOUS LOCATIONS WITHIN THE SOUTHWEST REGION (0802, 0803,1Charles E. Watts, Inc.$4,078,628ALDOT
20240531011RAODWAY SAFETY IMPROVEMENTS ON I-65 (SOUTHBOUND ROADWAY) AT MP 87.40009033F&W Construction Company, Inc.$2,661,222$3,457,311+30%ALDOT
20240531035PLANING, RESURFACING, TRAFFIC SIGNALS UPGRADES, AND STRIPE ON SR-21 FROM THE FLORIDA STATE LINE TO THE INTERSECTION OF SUNSET DRIVE IN ATMORE09032H. O. Weaver & Sons, Inc.$2,050,369$2,534,669+24%ALDOT
20240531027MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-7 (US-11) FROM THE I-459 INTERCHANGE TO THE JUNCTION OF WATTERSON PARKWAY IN TRUSSVILLE03013Apac-Alabama, Inc.$1,974,048$1,993,108+1.0%ALDOT
20240531028RESURFACE, BRIDGE GUARDRAIL RETROFIT, GUARDRAIL, & STRIPE ON SR-50 FROM THE INTERSECTION OF SR-1 (US-431) TO THE JUNCTION OF AVENUE A IN LA FAYETTE04032East Alabama Paving Company, Inc.$1,003,876$1,296,696+29%ALDOT
20240531023PLANING, RESURFACING, AND TRAFFIC STRIPE ON SR-15 (US-29) FROM JUNCTION OF SR-12 (US-84) TO A POINT NORTH OF THE JUNCTION OF MAX BARTON ROAD (MP 48.439)07032Wiregrass Construction Company, Inc.$991,640$1,187,576+20%ALDOT
20240531010CONCRETE PAVEMENT STRIPE & REPLACE RAISED PAVEMENT MARKERS ON I-59 FROM 0.600 MILE SOUTH OF THE OF ATTALA NORTH CITY LIMITS TO A POINT 0.300 MILE SOUTH OF THE B01052Ozark Striping Company, LLC$898,285$914,332+2.0%ALDOT
20240531017MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-20 (ALT US-72) FROM THE JUNCTION OF 12TH AVENUE TO 0.500 MILE WEST OF THE JUNCTION OF SR-3 (US-31) IN DECAT02043Grayson Carter & Son Contracting, Inc.$896,779$925,477+3.0%ALDOT
20240531014SAFETY WIDENING, RESURFACING, AND TRAFFIC STRIPE ON CR-34 FROM THE JUNCTION OF RIDGE ROAD TO THE INTERSECTION OF SR-49 SOUTH OF DADEVILLE04011Gary Ingram Grading & Paving, Inc.$776,533ALDOT
20240531032WIDENING, RESURFACING, AND TRAFFIC STRIPE ON CR-235 FROM THE JUNCTION OF CR-240 TO THE JUNCTION OF CR-246 SOUTHWEST OF SMITHS STATION06062East Alabama Paving Company, Inc.$570,421$613,600+8.0%ALDOT
20240531024MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON SR-68 FROM THE INTERSECTION OF SR-35 TO A POINT EAST 1.200 MILES EAST OF SR-35 AT MILE POST (47.250)01052Vulcan Materials Asphalt and Construction,$570,108$592,456+4.0%ALDOT
ALDOT contracts let on May 31, 2024, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than ALDOT received, the others did not match their published totals and are left out.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy