Gary Ingram Grading & Paving, Inc.: ALDOT bid record
Gary Ingram Grading & Paving, Inc. submitted 23 bids on Alabama DOT contracts in the data, from 28 JAN 2022 to 27 MAR 2026, and was the low bidder on 18 of them (78%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Alabama DOT
- Low bid volume
- $55,690,912
- Latest bid
- 27 MAR 2026
- Data through
- 28 AUG 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 5 | 5 | 100% |
| 2023 | 3 | 2 | 67% |
| 2024 | 7 | 4 | 57% |
| 2025 | 5 | 4 | 80% |
| 2026 | 3 | 3 | 100% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| 0401 | 10 | 10 | 100% |
| 0404 | 8 | 6 | 75% |
| 0405 | 2 | 1 | 50% |
| 0403 | 2 | 1 | 50% |
| 04 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Solid temporary traffic stripe | 701C001 | MI | 13 | 11 (85%) | $1,024.00 | $1,064.57 |
| Temporary traffic control markings | 703D001 | SF | 13 | 10 (77%) | $2.63 | $2.35 |
| Pavement markers, class A-H, type 2-D | 705A037 | EACH | 12 | 10 (83%) | $5.52 | $6.05 |
| Construction signs | 740B000 | SF | 14 | 9 (64%) | $6.20 | $7.00 |
| Traffic control markings, class 2, type A | 703A002 | SF | 13 | 9 (69%) | $5.78 | $6.00 |
| Tack coat | 405A000 | GAL | 12 | 9 (75%) | $1.00 | $4.55 |
| Solid white, class 2, type A traffic stripe (5" wide) | 701A227 | MI | 12 | 9 (75%) | $4,295.00 | $4,427.98 |
| Solid yellow, class 2, type A traffic stripe (5" wide) | 701A230 | MI | 12 | 9 (75%) | $4,295.00 | $4,432.31 |
| Pavement markers, class A-H, type 2-C | 705A030 | EACH | 11 | 9 (82%) | $5.52 | $6.00 |
| Pavement markers, class A-H, type 1-B | 705A032 | EACH | 11 | 9 (82%) | $5.52 | $5.85 |
| Broken temporary traffic stripe | 701C000 | MI | 12 | 8 (67%) | $986.50 | $1,000.00 |
| Superpave bituminous concrete upper binder layer, leveling, 1/2" maximum aggregate size mix, esal range C/D | 424B657 | TON | 11 | 8 (73%) | $119.60 | $125.23 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Apac-Alabama, Inc. | 6 | 1 of 6 |
| Vulcan Materials Asphalt and Construction, | 4 | 1 of 4 |
| East Alabama Paving Company, Inc. | 3 | 1 of 3 |
| Wiregrass Construction Company, Inc. | 2 | 1 of 2 |
| Midsouth Paving, Inc. | 2 | 1 of 2 |
| Dunn Construction Company, Inc. | 2 | 0 of 2 |
| Alabama Grading & Excavation, LLC. | 2 | 0 of 2 |
| Asphalt Contractors, Inc. | 1 | 0 of 1 |
| McElhenney Construction Co., LLC | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 27 MAR 2026 | 20260327020 | 0401 | MICRO-MILLING, RESURFACING (SCRUB SEAL), AND TRAFFIC STRIPE ON SR-49 FROM THE SOUTH CITY LIMITS OF DADEVILLE (MP 27.796) TO THE JUNCTION OF | 1 of 1 | $1,083,370 | Low |
| 30 JAN 2026 | 20260130031 | 0401 | MICRO-MILLING, RESURFACE (MICRO-SURFACING SEAL COAT, TYPE III AND SCRUB SEAL), GUARDRAIL, ACCESS MANAGEMENT, AND STRIPE ON SR-38 (US-280) FR | 1 of 1 | $9,331,330 | Low |
| 30 JAN 2026 | 20260130044 | 0404 | RESURFACING (SCRUB SEAL), GUARDRAIL INSTALLATION, AND STRIPE ON SR-77 FROM A POINT 0.260 MILE NORTH OF THE JUNCTION OF CR-130 (IDAHO ROAD) T | 1 of 3 | $2,756,319 | Low, 13% under the second |
| 07 NOV 2025 | 20251107038 | 0404 | MICRO-MILLING, RESURFACING, GUARDRAIL INSTALL, AND STRIPE ON SR-38 (US-280) FROM THE JUNCTION OF DEPOT AVENUE IN JACKSON GAP TO THE JUNCTION | 1 of 1 | $3,374,672 | Low |
| 28 MAR 2025 | 20250328018 | 0405 | RESURFACE (SCRUB SEAL), BRIDGE GUARDRAIL RETROFIT, & STRIPE ON SR-38 (US-280) FROM THE JUNCTION OF CR-25 TO A POINT 0.211 MILE EAST OF THE I | 2 of 4 | $7,536,282 | +19% |
| 28 FEB 2025 | 20250228012 | 0401 | ROADWAY SAFETY IMPROVEMENTS (SAFETY WIDENING AND SCORING) ON CR-15 FROM THE JUNCTION OF SR-49 NORTHEAST OF REELTOWN TO THE JUNCTION OF SR-50 | 1 of 2 | $767,052 | Low, 18% under the second |
| 28 FEB 2025 | 20250228018 | 0404 | RESURFACING (SCRUB SEAL), END ANCHOR INSTALL, AND STRIPE ON SR-1 (US-431) FROM SOUTH OF BUFORD ADAMSON ROAD AND ON SR-48 FROM CR-1 TO SR-1 ( | 1 of 3 | $3,092,126 | Low, 2.0% under the second |
| 31 JAN 2025 | 20250131057 | 0404 | ROADWAY IMPROVEMENTS (TURN LANE ADDITIONS) ON SR-9 AT THE PROPOSED ENTRANCE TO THE INDUSTRIAL PARK IN ASHLAND | 1 of 4 | $340,827 | Low, 22% under the second |
| 06 DEC 2024 | 20241206027 | 0403 | TRUCK PASSING LANES ADDITIONS AND RESURFACING ON SR-1 (US-431) FROM 0.548 MILE SOUTH OF THE JUNCTION OF CR-93 NORTH OF LAFAYETTE TO MP 175.9 | 1 of 2 | $8,176,452 | Low, 7.0% under the second |
| 06 DEC 2024 | 20241206030 | 0401 | RESURFACING (SCRUB SEAL), GUARDRAIL INSTALL, AND STRIPE ON SR-38 (US-280) FROM THE JUNCTION OF SR-22 TO A POINT 0.210 MILE EAST OF SR-63 IN | 1 of 1 | $3,908,859 | Low |
| 31 MAY 2024 | 20240531014 | 0401 | SAFETY WIDENING, RESURFACING, AND TRAFFIC STRIPE ON CR-34 FROM THE JUNCTION OF RIDGE ROAD TO THE INTERSECTION OF SR-49 SOUTH OF DADEVILLE | 1 of 1 | $776,533 | Low |
| 31 MAY 2024 | 20240531028 | 0403 | RESURFACE, BRIDGE GUARDRAIL RETROFIT, GUARDRAIL, & STRIPE ON SR-50 FROM THE INTERSECTION OF SR-1 (US-431) TO THE JUNCTION OF AVENUE A IN LA | 2 of 2 | $1,296,696 | +29% |
| 23 FEB 2024 | 20240223009 | 0405 | PLANE, RESURFACE (SCRUB SEAL), GUARDRAIL, AND TRAFFIC STRIPE ON SR-38 (US-280) FROM INTERSECTION OF COOSA STREET IN SYLACAUGA TO THE COOSA C | 1 of 4 | $4,389,456 | Low, 13% under the second |
| 26 JAN 2024 | 20240126014 | 04 | RESURFACING (SCRUB SEAL), AND TRAFFIC STRIPE ON SR-21 (US-231) IN ROCKFORD FROM 0.560 MILE SOUTH OF THE INTERSECTION OF SR-22 TO THE JUNCTIO | 2 of 2 | $1,522,300 | 0.0% |
| 26 JAN 2024 | 20240126027 | 0404 | MICRO-MILLING, RESURFACING (SCRUB SEAL), AND TRAFFIC STRIPE ON SR-48 FROM 0.280 MILE WEST OF THE JUNCTION OF CR-531 (MP 24.961) TO THE GEORG | 2 of 2 | $4,181,960 | +1.0% |
| 08 DEC 2023 | 20231208040 | 0401 | SAFETY WIDEN, RESURFACE, BRIDGE GUARDRAIL RETROFIT, & STRIPE ON SR-49 FROM THE JUNCTION OF CR-57 TO THE JUNCTION OF SR-22 IN NEW SITE | 1 of 1 | $3,036,512 | Low |
| 27 JAN 2023 | 20230127022 | 0404 | RESURFACING, BRIDGE RAIL RETROFIT, GUARDRAIL, AND STRIPE ON SR-1 (US-431) FROM THE CHAMBERS COUNTY LINE TO THE JUNCTION OF CR-26 IN ROANOKE | 2 of 2 | $2,794,439 | +13% |
| 27 JAN 2023 | 20230127060 | 0404 | SAFETY WIDENING, RESURFACE, ATTENUATOR RETROFIT, & STRIPE ON SR-22 FROM THE INTERSECTION OF SR-1 (US-431) IN ROANOKE TO THE GEORGIA STATE LI | 1 of 2 | $3,324,369 | Low, 10% under the second |
| 02 DEC 2022 | 20221202019 | 0401 | MICRO-MILLING, RESURFACE, BRIDGE GUARDRAIL RETROFIT, STRIPE ON SR-21 (US-231) FROM THE ELMORE COUNTY LINE TO A POINT 0.560 MILE SOUTH OF THE | 1 of 3 | $2,598,778 | Low, 11% under the second |
| 02 DEC 2022 | 20221202044 | 0404 | WIDENING, RESURFACE, BRIDGE GUARDRAIL RETROFIT, & STRIPE ON SR-148 FROM THE TALLADEGA COUNTY LINE TO THE JUNCTION OF SR-9 SOUTHWEST OF ASHLA | 1 of 2 | $2,750,421 | Low, 17% under the second |
| 29 JUL 2022 | 20220729015 | 0401 | WIDENING, RESURFACING, SCORING, RUMBLE STRIPS, AND STRIPE ON CR-7 (CHAPEL ROAD) FROM THE NORTH CITY LIMITS OF ALEXANDER CITY TO THE INTERSEC | 1 of 1 | $1,137,021 | Low |
| 25 MAR 2022 | 20220325023 | 0401 | SAFETY WIDENING, BRIDGE GUARDRAIL RETRO, GUARDRAIL, & STRIPE ON SR-21 (US-231) FROM THE JUNCTION OF CR-59 NORTH OF ROCKFORD TO THE JUNCTION | 1 of 1 | $2,699,822 | Low |
| 28 JAN 2022 | 20220128056 | 0401 | SAFETY WIDENING, RESURFACING, GUARDRAIL INSTALL, AND STRIPE ON SR-50 FROM THE ELMORE COUNTY LINE TO THE INTERSECTION OF SR-49 | 1 of 1 | $2,146,992 | Low |
How this record was read
ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
- Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.