ALDOT letting results, July 29, 2022
14 contracts let by Alabama DOT on July 29, 2022, $41,609,927 in low bids, a median of 2.5 bidders per contract.
- Owner
- Alabama DOT
- Contracts
- 14
- Low bids, total
- $41,609,927
- Data through
- 28 AUG 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| 20220729028 | ADDITIONAL LANES (GRADING, DRAINAGE, PAVEMENT, SIGNALS) ON SR-167 FROM THE JUNCTION OF SR-12 (US-84) TO A POINT 0.280 MILE NORTH OF THE INTERSECTION OF CR-48 (S | 0702 | 2 | S. A. Graham Company, Inc. | $12,884,263 | $13,181,502 | +2.0% | ALDOT |
| 20220729005 | GRADE, DRAIN, PAVE, BRIDGE, BOARDWALK, SIGNS, & LANDSCAPING SHADES CREEK GREENWAY MULTI-PURPOSE TRAIL - PHASE TWO | 0301 | 3 | Chilton Contractors, Inc. | $6,757,819 | $8,025,864 | +19% | ALDOT |
| 20220729021 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE ON I-59 FROM SOUTH OF THE SR-35 UNDERPASS TO NORTH OF THE SR-7 OVERPASS TO INCLUDE THE I-59 SB ROADWAY OUTSIDE SH | 0103 | 1 | Wiregrass Construction Company, Inc. | $5,520,498 | ALDOT | ||
| 20220729001 | BRIDGE REPLACEMENT (GRADING, DRAINAGE, PAVEMENT, AND BRIDGE) ON SR-247 OVER CEDAR CREEK | 0202 | 6 | The Bridge Builders of Alabama, LLC | $4,439,469 | $4,965,922 | +12% | ALDOT |
| 20220729003 | BRIDGE REPLACEMENT ON SR-217 OVER BIG CREEK SOUTHWEST OF CITRONELLE | 0901 | 2 | John G. Walton Construction Company, Inc. | $3,681,204 | $3,877,459 | +5.0% | ALDOT |
| 20220729027 | WIDENING, RESURFACING, AND TRAFFIC STRIPE ON SR-3 (US-31) AND THE I-65 SOUTHBOUND EXIT RAMP FROM THE I-65 INTERCHANGE TO HYUNDAI BOULEVARD | 0603 | 2 | Wiregrass Construction Company, Inc. | $3,057,755 | $3,487,367 | +14% | ALDOT |
| 20220729002 | BRIDGE PAINTING ON I-65 AT VARIOUS LOCATION AS INDICATED IN THE PLANS | 0901 | 8 | S & D Industrial Painting, Inc. | $1,651,394 | $2,565,699 | +55% | ALDOT |
| 20220729015 | WIDENING, RESURFACING, SCORING, RUMBLE STRIPS, AND STRIPE ON CR-7 (CHAPEL ROAD) FROM THE NORTH CITY LIMITS OF ALEXANDER CITY TO THE INTERSECTION OF CR-86 (GOODW | 0401 | 1 | Gary Ingram Grading & Paving, Inc. | $1,137,021 | ALDOT | ||
| 20220729018 | SAFETY IMPROVEMENTS (INTERSECTION MODIFICATIONS) ON SR-210 AT TIMBERS DRIVE IN DOTHAN | 0701 | 3 | Midsouth Paving, Inc. | $676,604 | $865,768 | +28% | ALDOT |
| 20220729010 | SAFETY IMPROVEMENTS (CURB RAMP INSTALLATIONS) ON SR-171, SR-17, SR-18, AND SR-118 AT VARIOUS LOCATIONS IN THE WC REGION (FAYETTE AREA) AS INDICATED IN THE PLANS | 1001 | 2 | Gillespie Construction, LLC | $576,829 | $725,628 | +26% | ALDOT |
| 20220729031 | RESURFACING AND TRAFFIC STRIPE ON RUSSELL DRIVE FROM THE JUNCTION OF PEACEBURG ROAD TO THE JUNCTION OF ALEXANDRIA ROAD IN WEAVER | 0402 | 3 | Vulcan Materials Asphalt and Construction, | $550,479 | $804,998 | +46% | ALDOT |
| 20220729024 | STRUCTURE DEMOLITION AND REMOVAL ON SR-2 (US-72/FLORENCE BOULEVARD) FROM THE JUNCTION OF CR-30 (INDIAN SPRINGS ROAD) TO THE JUNCTION OF SKY PARK ROAD | 0201 | 3 | B. H. Craig Construction Company, Inc. | $291,626 | $371,920 | +28% | ALDOT |
| 20220729008 | CURB RAMP INSTALLATIONS AND IMPROVEMENTS ON SR-14, SR-63, SR-111, SR-143, AND SR-229 AT VARIOUS LOCATIONS IN THE SOUTHEAST REGION (MONTGOMERY AREA) | 0601 | 3 | Global Management Group, Inc. | $206,560 | $244,586 | +18% | ALDOT |
| 20220729038 | INTERSECTION IMPROVEMENTS (CONCRETE PAVEMENT) ON SR-3 (US-31) AT SR-25 (MP 242.798 TO MP 242.810) OUTSIDE SOUTHBOUND LANES IN CALERA | 0305 | 2 | Abramson, LLC | $178,405 | $265,320 | +49% | ALDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ALDOT received, the others did not match their published totals and are left out.