Gillespie Construction, LLC submitted 52 bids on Alabama DOT contracts in the data, from 29 APR 2022 to 28 AUG 2026, and was the low bidder on 10 of them (19%). When it was not low, its total sat a median +23% above the low bid.
- Owner
- Alabama DOT
- Low bid volume
- $44,493,622
- Latest bid
- 28 AUG 2026
- Data through
- 28 AUG 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 6 | 3 | 50% |
| 2023 | 7 | 1 | 14% |
| 2024 | 6 | 1 | 17% |
| 2025 | 18 | 4 | 22% |
| 2026 | 15 | 1 | 7% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| 0301 | 15 | 5 | 33% |
| 0601 | 4 | 0 | 0% |
| 0502 | 3 | 0 | 0% |
| 0105 | 3 | 1 | 33% |
| 0202 | 3 | 0 | 0% |
| 0103 | 2 | 0 | 0% |
| 0506 | 2 | 1 | 50% |
| 0201 | 2 | 0 | 0% |
| 0402 | 2 | 0 | 0% |
| 1001 | 1 | 1 | 100% |
| 0505 | 1 | 0 | 0% |
| 1009 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Detectable warning surface | 618C001 | SF | 27 | 18 (67%) | $45.00 | $56.25 |
| Silt fence removal | 665O001 | LF | 36 | 17 (47%) | $1.00 | $1.45 |
| Topsoil | 650A000 | CY | 40 | 15 (38%) | $45.00 | $45.00 |
| Unclassified excavation | 210A000 | CY | 40 | 11 (28%) | $35.50 | $32.97 |
| Removing concrete sidewalk | 206C000 | SY | 24 | 11 (46%) | $35.00 | $40.00 |
| Temporary mulching | 665B001 | TON | 31 | 10 (32%) | $550.00 | $545.62 |
| Removing inlets | 206E001 | EACH | 24 | 9 (38%) | $1,500.00 | $1,200.00 |
| Polyethylene | 665E000 | SY | 19 | 9 (47%) | $3.00 | $3.56 |
| Removing headwalls | 206E000 | EACH | 16 | 9 (56%) | $750.00 | $663.82 |
| Traffic control markings, class 2, type A | 703A002 | SF | 41 | 8 (20%) | $7.00 | $6.00 |
| Temporary seeding | 665A000 | ACRE | 30 | 8 (27%) | $987.50 | $900.00 |
| Concrete sidewalk, 4" thick | 618A000 | SY | 27 | 8 (30%) | $105.00 | $106.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Bulls Construction Group, LLC | 21 | 11 of 21 |
| McElhenney Construction Co., LLC | 17 | 11 of 17 |
| Wiregrass Construction Company, Inc. | 16 | 8 of 16 |
| Carcel & G. Construction, LLC | 9 | 5 of 9 |
| Rogers Group, Inc. | 8 | 7 of 8 |
| Ikaros, LLC | 7 | 4 of 7 |
| CB&A Construction, LLC. | 6 | 2 of 6 |
| Grayson Carter & Son Contracting, Inc. | 6 | 6 of 6 |
| Vulcan Materials Asphalt and Construction, | 6 | 1 of 6 |
| Russo Corporation | 5 | 1 of 5 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 AUG 2026 | 20260828011 | 0402 | MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE TO INTERSECTION IMPROVEMENTS (LEFT AND RIGHT TURN LANES) ON CR 109 FROM SR-202 TO MORRISVILLE | 3 of 4 | $2,401,344 | +6.0% |
| 28 AUG 2026 | 20260828018 | 0705 | ROADWAY SAFETY IMPROVEMENTS (SLOPE FLATTENING TO INCLUDE CLEARING AND GRUBBING) ON CR-1101 AT THE CONECUH RIVER (SITE 1) AND OLUSTEE CREEK ( | 4 of 6 | $745,749 | +28% |
| 28 AUG 2026 | 20260828030 | 0202 | ROADWAY IMPROVEMENTS/REALIGNMENT (GRADING, DRAINING, PAVEMENT, TRAFFIC SIGNS, TRAFFIC SIGNALS, AND TRAFFIC STRIPE) ON SR-3 (US-31) AT SPARKM | 3 of 8 | $1,323,315 | +13% |
| 31 JUL 2026 | 20260731001 | 0301 | ROADWAY AND DRAINAGE IMPROVEMENTS (GRADING, DRAINAGE, PAVEMENT (RESURFACING), AND TRAFFIC STRIPE) ON CR-337 (MCCALLA ROAD) FROM THE JUNCTION | 3 of 6 | $1,731,752 | +3.0% |
| 31 JUL 2026 | 20260731004 | 0104 | SAFETY IMPROVEMENTS (TRAFFIC SIGN REPLACEMENT) ON I-65 FROM THE BLOUNT COUNTY LINE TO THE MORGAN COUNTY LINE | 2 of 2 | $1,495,504 | +27% |
| 31 JUL 2026 | 20260731008 | 0802 | ROADWAY SAFETY IMPROVEMENTS (GUARDRAIL INSTALLATION AND GUARDRAIL END ANCHORS) ON VARIOUS ROUTES AT VARIOUS LOCATIONS AS INDICATED IN THE PL | 3 of 4 | $272,912 | +25% |
| 31 JUL 2026 | 20260731017 | 0402 | ROADWAY WIDENING AND PEDESTRIAN IMPROVEMENTS (GRADING, DRAINAGE, PAVEMENT, TRAFFIC SIGNALS, AND TRAFFIC STRIPE) ON SR-204 FROM THE JUNCTION | 3 of 4 | $8,943,900 | +9.0% |
| 31 JUL 2026 | 20260731022 | 0105 | ROADWAY IMPROVEMENTS (PARTIAL REALIGNMENT) AND RESURFACING (WIDEN, PLANE, GRADE, DRAINAGE, SIDEWALK INSTALL, AND STRIPE ON SOUTH 11TH STREET | 2 of 5 | $2,329,764 | +8.0% |
| 31 JUL 2026 | 20260731025 | 0902 | INTERSECTION IMPROVEMENTS (ADDITIONAL TURN LANES AND TRAFFIC SIGNAL UPGRADES) ON SR-42 (US-98) AT CR-87 EAST OF FOLEY | 6 of 6 | $1,122,332 | +30% |
| 26 JUN 2026 | 20260626029 | 0601 | ROADWAY AND SAFETY IMPROVEMENTS (PLANING, RESURFACING, SIDEWALK INSTALLATION, AND TRAFFIC STRIPE) ON WEST TALLASSEE STREET FROM THE JUNCTION | 3 of 5 | $1,220,678 | +13% |
| 29 MAY 2026 | 20260529011 | 0603 | ROADWAY/CROSSWALK IMPROVEMENTS (SIDEWALK INSTALLATION, CURB RAMPS, CONCRETE ISLANDS, AND FLASHING BEACON LIGHTS) ON WARES FERRY ROAD AT WARE | 2 of 2 | $203,734 | +14% |
| 29 MAY 2026 | 20260529023 | 0301 | MICRO-MILLING, RESURFACING (SCRUB SEAL), BRIDGE GUARDRAIL RETROFIT, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-3 (US-31) FROM THE INTE | 3 of 4 | $6,938,095 | +14% |
| 27 FEB 2026 | 20260227001 | 0301 | STREETSCAPE IMPROVEMENTS (GRADING, DRAINAGE, PAVEMENT, SIDEWALK INSTALLATION, TRAFFIC SIGNAL UPGRADES, AND LANDSCAPING) ON 41ST FROM THE INT | 1 of 5 | $3,289,372 | Low, 15% under the second |
| 30 JAN 2026 | 20260130064 | 0105 | RESURFACING, SIDEWALK IMPROVEMENTS, AND TRAFFIC STRIPE ON WALNUT STREET FROM SOUTH 8TH STREET TO SOUTH 5TH STREET IN GADSDEN. | 3 of 7 | $1,196,584 | +40% |
| 30 JAN 2026 | 20260130067 | 0301 | ACCESS MANAGEMENT AND INTERCHANGE IMPROVEMENTS (GRADING, DRAINAGE, PAVEMENT, TRAFFIC SIGNALS, AND ITS) ON SR- 79 (TALLAPOOSA STREET) AT THE | 3 of 3 | $2,413,158 | +13% |
| 05 DEC 2025 | 20251205008 | 0201 | ROADWAY AND SAFETY (PEDESTRIAN MODIFICATIONS) IMPROVEMENTS ON RICKWOOD ROAD FROM THE JUNCTION OF CHISHOLM ROAD TO THE INTERSECTION OF SR-17 | 5 of 5 | $4,051,633 | +54% |
| 05 DEC 2025 | 20251205016 | 0202 | INTERSECTION MODIFICATIONS (ROUNDABOUT INSTALLATION) ON CR-109 (EAST LIMESTONE ROAD) AT CR-36 (CAPSHAW ROAD) SOUTHEAST OF ATHENS | 5 of 5 | $1,319,354 | +41% |
| 05 DEC 2025 | 20251205059 | 0302 | ROADWAY IMPROVEMENTS (CHANGE TRAFFIC FLOW AND TURN RADIUS) ON SR-53 (US-231 AND US-411)/COURTHOUSE SQUARE AND SR-25 (US-411) IN ASHVILLE | 2 of 5 | $1,337,337 | +6.0% |
| 05 DEC 2025 | 20251205065 | 0502 | INTERSECTION IMPROVEMENTS ON SR-13 (US-43) AT ROSE BOULEVARD/MITT LARY ROAD IN NORTHPORT | 7 of 7 | $2,461,807 | +32% |
| 07 NOV 2025 | 20251107006 | 0301 | NORWOOD NEIGHBORHOOD STREETSCAPE PROJECT ON 12TH AVENUE NORTH FROM THE INTERSECTION OF 24TH STREET NORTH TO THE INTERSECTION OF 31ST STREET | 2 of 3 | $1,411,125 | +6.0% |
| 07 NOV 2025 | 20251107012 | 0601 | ROADWAY IMPROVEMENTS (ACCESS MANAGEMENT) ON SR-9 (US-231) FROM THE INTERSECTION OF CHARLES AVENUE TO THE JUNCTION OF MAIN STREET IN WETUMPKA | 4 of 5 | $1,252,073 | +9.0% |
| 07 NOV 2025 | 20251107015 | 04 | SAFETY IMPROVEMENTS (BRIDGE RAIL RETRO & GUARDRAIL INSTALL) ON VARIOUS ROUTES AT VARIOUS LOCATIONS IN THE EAST CENTRAL REGION (ALEXANDER CIT | 1 of 1 | $645,305 | Low |
| 07 NOV 2025 | 20251107030 | 0405 | SAFETY IMPROVEMENTS (SLOPE FLATTENING AND GUARDRAIL INSTALL) ON CR-54 FROM THE JUNCTION OF BATCH PLANT DRIVE TO THE JUNCTION OF CR-191 (RENF | 2 of 3 | $569,799 | +15% |
| 29 AUG 2025 | 20250829009 | 0301 | DRAINAGE IMPROVEMENTS AND PIPE REHABILITATION ON I-459 FROM A POINT NEAR MP 19.280 TO A POINT NEAR MP 19.394 SOUTHEAST OF VESTAVIA HILLS | 3 of 5 | $637,033 | +4.0% |
| 29 AUG 2025 | 20250829022 | 0301 | RELOACTION AND INTERSECTION IMPROVEMENTS ON LAKESHORE PARKWAY AND MORGAN ROAD FROM CUMBERLAND ROAD TO TURNIN DRIVE IN BESSEMER | 6 of 6 | $26,199,887 | +38% |
How this record was read
ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
- Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.