Gillespie Construction, LLC: ALDOT bid record

Gillespie Construction, LLC submitted 52 bids on Alabama DOT contracts in the data, from 29 APR 2022 to 28 AUG 2026, and was the low bidder on 10 of them (19%). When it was not low, its total sat a median +23% above the low bid.

Owner
Alabama DOT
Low bid volume
$44,493,622
Latest bid
28 AUG 2026
Data through
28 AUG 2026
52Bids
10Low bids
19Win rate, percent
+23%Median gap to the low bid when not low, 42 bids

By year

YearBidsLow bidsWin rate
20226350%
20237114%
20246117%
202518422%
20261517%
Gillespie Construction, LLC, ALDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
030115533%
0601400%
0502300%
01053133%
0202300%
0103200%
05062150%
0201200%
0402200%
100111100%
0505100%
1009100%
Gillespie Construction, LLC, ALDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Detectable warning surface618C001SF2718 (67%)$45.00$56.25
Silt fence removal665O001LF3617 (47%)$1.00$1.45
Topsoil650A000CY4015 (38%)$45.00$45.00
Unclassified excavation210A000CY4011 (28%)$35.50$32.97
Removing concrete sidewalk206C000SY2411 (46%)$35.00$40.00
Temporary mulching665B001TON3110 (32%)$550.00$545.62
Removing inlets206E001EACH249 (38%)$1,500.00$1,200.00
Polyethylene665E000SY199 (47%)$3.00$3.56
Removing headwalls206E000EACH169 (56%)$750.00$663.82
Traffic control markings, class 2, type A703A002SF418 (20%)$7.00$6.00
Temporary seeding665A000ACRE308 (27%)$987.50$900.00
Concrete sidewalk, 4" thick618A000SY278 (30%)$105.00$106.00
Gillespie Construction, LLC, ALDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Bulls Construction Group, LLC2111 of 21
McElhenney Construction Co., LLC1711 of 17
Wiregrass Construction Company, Inc.168 of 16
Carcel & G. Construction, LLC95 of 9
Rogers Group, Inc.87 of 8
Ikaros, LLC74 of 7
CB&A Construction, LLC.62 of 6
Grayson Carter & Son Contracting, Inc.66 of 6
Vulcan Materials Asphalt and Construction,61 of 6
Russo Corporation51 of 5
Gillespie Construction, LLC, ALDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
28 AUG 2026202608280110402MICRO-MILLING, RESURFACING, AND TRAFFIC STRIPE TO INTERSECTION IMPROVEMENTS (LEFT AND RIGHT TURN LANES) ON CR 109 FROM SR-202 TO MORRISVILLE3 of 4$2,401,344+6.0%
28 AUG 2026202608280180705ROADWAY SAFETY IMPROVEMENTS (SLOPE FLATTENING TO INCLUDE CLEARING AND GRUBBING) ON CR-1101 AT THE CONECUH RIVER (SITE 1) AND OLUSTEE CREEK (4 of 6$745,749+28%
28 AUG 2026202608280300202ROADWAY IMPROVEMENTS/REALIGNMENT (GRADING, DRAINING, PAVEMENT, TRAFFIC SIGNS, TRAFFIC SIGNALS, AND TRAFFIC STRIPE) ON SR-3 (US-31) AT SPARKM3 of 8$1,323,315+13%
31 JUL 2026202607310010301ROADWAY AND DRAINAGE IMPROVEMENTS (GRADING, DRAINAGE, PAVEMENT (RESURFACING), AND TRAFFIC STRIPE) ON CR-337 (MCCALLA ROAD) FROM THE JUNCTION3 of 6$1,731,752+3.0%
31 JUL 2026202607310040104SAFETY IMPROVEMENTS (TRAFFIC SIGN REPLACEMENT) ON I-65 FROM THE BLOUNT COUNTY LINE TO THE MORGAN COUNTY LINE2 of 2$1,495,504+27%
31 JUL 2026202607310080802ROADWAY SAFETY IMPROVEMENTS (GUARDRAIL INSTALLATION AND GUARDRAIL END ANCHORS) ON VARIOUS ROUTES AT VARIOUS LOCATIONS AS INDICATED IN THE PL3 of 4$272,912+25%
31 JUL 2026202607310170402ROADWAY WIDENING AND PEDESTRIAN IMPROVEMENTS (GRADING, DRAINAGE, PAVEMENT, TRAFFIC SIGNALS, AND TRAFFIC STRIPE) ON SR-204 FROM THE JUNCTION 3 of 4$8,943,900+9.0%
31 JUL 2026202607310220105ROADWAY IMPROVEMENTS (PARTIAL REALIGNMENT) AND RESURFACING (WIDEN, PLANE, GRADE, DRAINAGE, SIDEWALK INSTALL, AND STRIPE ON SOUTH 11TH STREET2 of 5$2,329,764+8.0%
31 JUL 2026202607310250902INTERSECTION IMPROVEMENTS (ADDITIONAL TURN LANES AND TRAFFIC SIGNAL UPGRADES) ON SR-42 (US-98) AT CR-87 EAST OF FOLEY6 of 6$1,122,332+30%
26 JUN 2026202606260290601ROADWAY AND SAFETY IMPROVEMENTS (PLANING, RESURFACING, SIDEWALK INSTALLATION, AND TRAFFIC STRIPE) ON WEST TALLASSEE STREET FROM THE JUNCTION3 of 5$1,220,678+13%
29 MAY 2026202605290110603ROADWAY/CROSSWALK IMPROVEMENTS (SIDEWALK INSTALLATION, CURB RAMPS, CONCRETE ISLANDS, AND FLASHING BEACON LIGHTS) ON WARES FERRY ROAD AT WARE2 of 2$203,734+14%
29 MAY 2026202605290230301MICRO-MILLING, RESURFACING (SCRUB SEAL), BRIDGE GUARDRAIL RETROFIT, GUARDRAIL INSTALLATION, AND TRAFFIC STRIPE ON SR-3 (US-31) FROM THE INTE3 of 4$6,938,095+14%
27 FEB 2026202602270010301STREETSCAPE IMPROVEMENTS (GRADING, DRAINAGE, PAVEMENT, SIDEWALK INSTALLATION, TRAFFIC SIGNAL UPGRADES, AND LANDSCAPING) ON 41ST FROM THE INT1 of 5$3,289,372Low, 15% under the second
30 JAN 2026202601300640105RESURFACING, SIDEWALK IMPROVEMENTS, AND TRAFFIC STRIPE ON WALNUT STREET FROM SOUTH 8TH STREET TO SOUTH 5TH STREET IN GADSDEN.3 of 7$1,196,584+40%
30 JAN 2026202601300670301ACCESS MANAGEMENT AND INTERCHANGE IMPROVEMENTS (GRADING, DRAINAGE, PAVEMENT, TRAFFIC SIGNALS, AND ITS) ON SR- 79 (TALLAPOOSA STREET) AT THE 3 of 3$2,413,158+13%
05 DEC 2025202512050080201ROADWAY AND SAFETY (PEDESTRIAN MODIFICATIONS) IMPROVEMENTS ON RICKWOOD ROAD FROM THE JUNCTION OF CHISHOLM ROAD TO THE INTERSECTION OF SR-17 5 of 5$4,051,633+54%
05 DEC 2025202512050160202INTERSECTION MODIFICATIONS (ROUNDABOUT INSTALLATION) ON CR-109 (EAST LIMESTONE ROAD) AT CR-36 (CAPSHAW ROAD) SOUTHEAST OF ATHENS5 of 5$1,319,354+41%
05 DEC 2025202512050590302ROADWAY IMPROVEMENTS (CHANGE TRAFFIC FLOW AND TURN RADIUS) ON SR-53 (US-231 AND US-411)/COURTHOUSE SQUARE AND SR-25 (US-411) IN ASHVILLE2 of 5$1,337,337+6.0%
05 DEC 2025202512050650502INTERSECTION IMPROVEMENTS ON SR-13 (US-43) AT ROSE BOULEVARD/MITT LARY ROAD IN NORTHPORT7 of 7$2,461,807+32%
07 NOV 2025202511070060301NORWOOD NEIGHBORHOOD STREETSCAPE PROJECT ON 12TH AVENUE NORTH FROM THE INTERSECTION OF 24TH STREET NORTH TO THE INTERSECTION OF 31ST STREET 2 of 3$1,411,125+6.0%
07 NOV 2025202511070120601ROADWAY IMPROVEMENTS (ACCESS MANAGEMENT) ON SR-9 (US-231) FROM THE INTERSECTION OF CHARLES AVENUE TO THE JUNCTION OF MAIN STREET IN WETUMPKA4 of 5$1,252,073+9.0%
07 NOV 20252025110701504SAFETY IMPROVEMENTS (BRIDGE RAIL RETRO & GUARDRAIL INSTALL) ON VARIOUS ROUTES AT VARIOUS LOCATIONS IN THE EAST CENTRAL REGION (ALEXANDER CIT1 of 1$645,305Low
07 NOV 2025202511070300405SAFETY IMPROVEMENTS (SLOPE FLATTENING AND GUARDRAIL INSTALL) ON CR-54 FROM THE JUNCTION OF BATCH PLANT DRIVE TO THE JUNCTION OF CR-191 (RENF2 of 3$569,799+15%
29 AUG 2025202508290090301DRAINAGE IMPROVEMENTS AND PIPE REHABILITATION ON I-459 FROM A POINT NEAR MP 19.280 TO A POINT NEAR MP 19.394 SOUTHEAST OF VESTAVIA HILLS3 of 5$637,033+4.0%
29 AUG 2025202508290220301RELOACTION AND INTERSECTION IMPROVEMENTS ON LAKESHORE PARKWAY AND MORGAN ROAD FROM CUMBERLAND ROAD TO TURNIN DRIVE IN BESSEMER6 of 6$26,199,887+38%
Gillespie Construction, LLC: latest ALDOT bids in the data

How this record was read

ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.

  • Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy