ALDOT contract 20251205065 bid tabulation
INTERSECTION IMPROVEMENTS ON SR-13 (US-43) AT ROSE BOULEVARD/MITT LARY ROAD IN NORTHPORT. Let by Alabama DOT on December 5, 2025, Tuscaloosa, 0502. 7 bids received; low bid $1,858,695 by GFC Construction, Inc..
- Owner
- Alabama DOT
- Letting
- 05 DEC 2025
- Pay items
- 99
- Data through
- 28 AUG 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | GFC Construction, Inc. | $1,858,695 | Low |
| 2 | Bulls Construction Group, LLC | $2,031,385 | +9.0% |
| 3 | John Plott Company, Inc. | $2,067,622 | +11% |
| 4 | Cornerstone Civil Contractors, LLC | $2,143,577 | +15% |
| 5 | Ikaros, LLC | $2,222,000 | +20% |
| 6 | Price Civil Services, Inc. | $2,226,772 | +20% |
| 7 | Gillespie Construction, LLC | $2,461,807 | +32% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. GFC Construction, Inc. | 2. Bulls Construction Group, LLC | 3. John Plott Company, Inc. | 4. Cornerstone Civil Contractors, LLC | 5. Ikaros, LLC | 6. Price Civil Services, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0010 | Clearing (201C000) | LS | 1 | $1,500.00 | $8,000.00 | $17,062 | $7,000.00 | $5,000.00 | $10,000 |
| 0020 | Removing concrete sidewalk (206C000) | SY | 224 | $16.96 | $20.00 | $21.82 | $50.00 | $25.00 | $50.00 |
| 0030 | Removing guardrail (206D001) | LF | 89 | $10.50 | $11.70 | $11.90 | $11.25 | $11.82 | $12.50 |
| 0040 | Removing curb (206D002) | LF | 191 | $15.07 | $20.00 | $16.30 | $50.00 | $25.00 | $35.00 |
| 0050 | Removing curb and gutter (206D003) | LF | 1,470 | $11.94 | $15.00 | $4.99 | $35.00 | $25.00 | $35.00 |
| 0060 | Removing gutter (206D005) | LF | 153 | $15.07 | $20.00 | $16.29 | $50.00 | $40.00 | $35.00 |
| 0070 | Removing safety barrier (206D010) | LF | 305 | $17.83 | $100.00 | $11.90 | $15.00 | $1.00 | $55.00 |
| 0080 | Removing raised curb channelizer (206D034) | LF | 225 | $17.83 | $12.00 | $10.86 | $11.25 | $30.00 | $75.00 |
| 0090 | Removing inlets (206E001) | EACH | 3 | $761.25 | $1,500.00 | $1,121.60 | $1,000.00 | $2,000.00 | $5,000.00 |
| 0100 | Removing guardrail end anchor (all type) (206E008) | EACH | 2 | $420.00 | $468.00 | $475.96 | $450.00 | $472.84 | $500.00 |
| 0110 | Removing inlets (partial) (206E042) | EACH | 6 | $761.25 | $1,500.00 | $3,039.77 | $1,000.00 | $4,500.00 | $4,000.00 |
| 0120 | Unclassified excavation (210A000) | CY | 2,950 | $45.77 | $40.00 | $56.24 | $50.00 | $35.00 | $17.00 |
| 0130 | Borrow excavation (A4 or better) (210D011) | CY | 254 | $35.27 | $40.00 | $38.24 | $135.00 | $35.00 | $25.00 |
| 0140 | Structure excavation (214A000) | CY | 150 | $35.27 | $50.00 | $7.12 | $50.00 | $15.00 | $20.00 |
| 0150 | Foundation backfill, commercial (214B001) | CY | 42 | $79.01 | $50.00 | $59.97 | $60.00 | $60.00 | $79.65 |
| 0160 | Crushed aggregate,section 825,type A,for miscellaneous use (305B079) | TON | 200 | $62.58 | $60.00 | $57.84 | $125.00 | $85.00 | $99.81 |
| 0170 | Tack coat (405A000) | GAL | 2,150 | $4.47 | $7.50 | $5.07 | $4.80 | $5.04 | $5.33 |
| 0180 | Micro-milling existing pavement (approximately 1.10" thru 2.00" thick) (408B001) | SY | 18,220 | $2.94 | $2.05 | $3.33 | $3.15 | $3.31 | $2.18 |
| 0190 | Superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range C/D (424A360) | TON | 1,714 | $113.69 | $152.00 | $128.84 | $121.65 | $128.00 | $135.35 |
| 0200 | Superpave bituminous concrete upper binder layer, widening, 3/4" maximum aggregate size mix, esal range C/D (424B661) | TON | 260 | $163.01 | $183.00 | $184.73 | $174.45 | $183.52 | $194.06 |
| 0210 | Superpave bituminous concrete lower binder layer, widening, 1" maximum aggregate size mix, esal range C/D (424B692) | TON | 1,764 | $112.27 | $133.25 | $127.22 | $120.00 | $126.39 | $133.65 |
| 0220 | Scoring bituminous pavement surface (428A001) | MI | 1 | $2,625.00 | $13,279 | $356.97 | $340.00 | $336.63 | $375.00 |
| 0230 | 15" roadway pipe (class 3 R.C.) (530A000) | LF | 15 | $205.01 | $150.00 | $303.87 | $200.00 | $500.00 | $104.38 |
| 0240 | 18" roadway pipe (class 3 R.C.) (530A001) | LF | 134 | $110.41 | $125.00 | $150.76 | $135.00 | $250.00 | $128.27 |
| 0250 | Mobilization (600A000) | LS | 1 | $190,744 | $74,209 | $201,331 | $214,000 | $163,057 | $261,139 |
| 0260 | Right of way markers (602A000) | EACH | 7 | $682.50 | $700.00 | $547.36 | $800.00 | $750.00 | $670.25 |
| 0270 | Filter blanket, geotextile (610D003) | SY | 170 | $6.56 | $6.00 | $6.12 | $3.50 | $6.00 | $3.77 |
| 0280 | Slope paving (614A000) | CY | 234 | $399.00 | $800.00 | $696.10 | $670.00 | $950.00 | $490.00 |
| 0290 | Concrete sidewalk, 4" thick (618A000) | SY | 438 | $78.75 | $110.00 | $57.71 | $55.00 | $115.00 | $123.75 |
| 0300 | Detectable warning surface (618C001) | SF | 17 | $68.25 | $55.00 | $53.55 | $55.00 | $85.00 | $81.25 |
| 0310 | Curb ramp (618D000) | SY | 126 | $84.00 | $360.00 | $172.54 | $165.00 | $450.00 | $130.00 |
| 0320 | Inlets, type S1 or S3 (1 wing) (621C015) | EACH | 5 | $6,405.00 | $6,500.00 | $7,559.95 | $8,500.00 | $7,500.00 | $8,125.00 |
| 0330 | Inlets, type S1 or S3 (2 wing) (621C017) | EACH | 2 | $6,615.00 | $7,500.00 | $8,154.90 | $9,000.00 | $8,500.00 | $8,375.00 |
| 0340 | Inlets, type C (621C027) | EACH | 1 | $5,381.25 | $7,500.00 | $8,376.24 | $10,000 | $7,500.00 | $8,625.00 |
| 0350 | Inlets, type S (partial) (621C162) | EACH | 1 | $6,825.00 | $6,500.00 | $8,924.30 | $8,500.00 | $9,000.00 | $10,625 |
| 0360 | Concrete gutter (623A000) | LF | 75 | $75.86 | $65.00 | $77.34 | $61.80 | $67.00 | $87.50 |
| 0370 | Combination curb & gutter, type C (623C000) | LF | 1,532 | $39.74 | $33.00 | $39.27 | $30.90 | $36.50 | $46.06 |
| 0380 | Steel beam guardrail, class A, type 2 (630A001) | LF | 88 | $26.25 | $29.25 | $29.75 | $28.10 | $29.55 | $31.25 |
| 0390 | Guardrail end anchor, type 13 (MASH) (630C079) | EACH | 1 | $4,095.00 | $4,563.00 | $4,640.63 | $4,382.00 | $4,610.21 | $4,875.00 |
| 0400 | Guardrail end anchor, type 20 series (MASH) (630C080) | EACH | 1 | $4,200.00 | $4,680.00 | $4,759.62 | $4,495.00 | $4,728.42 | $5,000.00 |
| 0410 | Topsoil (650A000) | CY | 210 | $36.75 | $40.00 | $36.04 | $100.00 | $50.00 | $43.75 |
| 0420 | Solid sodding (emerald zoysia) (654A005) | SY | 1,888 | $8.93 | $17.00 | $11.90 | $12.65 | $13.30 | $10.63 |
| 0430 | Temporary seeding (665A000) | ACRE | 1 | $5,250.00 | $1,170.00 | $416.47 | $1,825.00 | $1,920.92 | $2,031.25 |
| 0440 | Temporary mulching (665B001) | TON | 3 | $5.25 | $936.00 | $594.95 | $1,630.00 | $1,714.05 | $1,812.50 |
| 0450 | Polyethylene (665E000) | SY | 200 | $3.15 | $5.00 | $1.19 | $4.00 | $3.84 | $4.49 |
| 0460 | Hay bales (665F000) | EACH | 200 | $7.35 | $14.00 | $17.85 | $9.30 | $9.75 | $10.31 |
| 0470 | Sand bags (665G000) | EACH | 200 | $6.30 | $7.00 | $11.90 | $8.70 | $9.16 | $9.69 |
| 0480 | Silt fence (665J002) | LF | 305 | $3.41 | $7.00 | $4.76 | $2.90 | $3.06 | $3.24 |
| 0490 | Temporary coarse aggregate,aldot number 1 (665N000) | TON | 25 | $65.63 | $100.00 | $59.12 | $60.00 | $85.00 | $109.65 |
| 0500 | Silt fence removal (665O001) | LF | 305 | $1.58 | $2.00 | $1.27 | $1.20 | $1.24 | $1.31 |
| 0510 | Inlet protection, stage 3 or 4 (665P005) | EACH | 2 | $577.50 | $702.00 | $535.46 | $187.00 | $196.23 | $207.50 |
| 0520 | Wattle (665Q002) | LF | 800 | $7.35 | $9.00 | $7.14 | $12.50 | $13.06 | $13.81 |
| 0530 | Pest control treatment (666A001) | ACRE | 1 | $1,050.00 | $293.00 | $2,379.81 | $11.25 | $11.82 | $375.00 |
| 0540 | Geometric controls (680A001) | LS | 1 | $90,563 | $40,751 | $19,748 | $100,000 | $25,000 | $10,000 |
| 0550 | Construction fuel (maximum bid limited to $ 90,000.00) (698A000) | LS | 1 | $0.00 | $0.00 | $2,001.25 | $10,000 | $90,000 | $90,000 |
| 0560 | Solid white, class 2, type A traffic stripe (5" wide) (701A227) | MI | 1 | $4,200.00 | $4,914.00 | $4,997.61 | $4,720.00 | $4,964.84 | $5,062.50 |
| 0570 | Solid yellow, class 2, type A traffic stripe (5" wide) (701A230) | MI | 2 | $4,410.00 | $4,914.00 | $4,997.61 | $4,720.00 | $4,964.84 | $5,062.50 |
| 0580 | Broken white, class 2, type A traffic stripe (5" wide) (701A239) | MI | 1 | $2,677.50 | $2,983.00 | $3,034.26 | $2,865.00 | $3,014.37 | $2,968.75 |
| 0590 | Dotted, class 2, type A traffic stripe (5" wide) (701B207) | LF | 2,322 | $2.10 | $2.34 | $2.38 | $2.25 | $2.36 | $1.88 |
| 0600 | Broken temporary traffic stripe (701C000) | MI | 2 | $840.00 | $936.00 | $951.93 | $900.00 | $945.68 | $1,437.50 |
| 0610 | Solid temporary traffic stripe (701C001) | MI | 4 | $892.50 | $995.00 | $1,011.42 | $955.00 | $1,004.79 | $1,468.75 |
| 0620 | Dotted temporary traffic stripe (701F000) | LF | 4,644 | $1.05 | $1.25 | $1.19 | $1.15 | $1.18 | $0.28 |
| 0630 | Broken yellow, class 2, type A traffic stripe (5" wide) (701G256) | LF | 291 | $2.10 | $2.35 | $2.38 | $2.25 | $2.36 | $0.50 |
| 0640 | Traffic control markings, class 2, type A (703A002) | SF | 6,074 | $6.30 | $7.00 | $7.14 | $6.75 | $7.09 | $5.63 |
| 0650 | Traffic control legends, class 2, type A (703B002) | SF | 381 | $6.30 | $7.00 | $7.14 | $6.75 | $7.09 | $6.88 |
| 0665 | Temporary traffic control markings (703D001) | SF | 12,147 | $1.05 | $1.25 | $1.19 | $1.15 | $1.18 | $2.50 |
| 0675 | Temporary traffic control legends (703E001) | SF | 762 | $2.10 | $2.35 | $2.38 | $2.25 | $2.36 | $3.13 |
| 0680 | Pavement markers, class A-H, type 2-C (705A030) | EACH | 219 | $6.30 | $7.00 | $7.14 | $6.75 | $7.09 | $6.25 |
| 0690 | Pavement markers, class A-H, type 2-E (705A038) | EACH | 164 | $6.30 | $7.00 | $7.14 | $6.75 | $7.09 | $6.25 |
| 0700 | Raised curb channelizer, yellow (707H000) | LF | 393 | $78.75 | $76.00 | $89.24 | $73.00 | $76.84 | $112.50 |
| 0710 | Class 10 aluminum flat sign panels (type XI background) (710A163) | SF | 23 | $36.75 | $26.00 | $41.65 | $24.75 | $26.01 | $43.75 |
| 0720 | Class 4, aluminum flat sign panels (type IV background) (710A171) | SF | 156 | $31.50 | $23.40 | $35.70 | $22.50 | $23.64 | $31.25 |
| 0730 | Roadway sign post (#3 U channel, galvanized steel or 2 ", 14 GA square tubular steel) (710B021) | LF | 378 | $27.30 | $22.25 | $30.94 | $21.35 | $22.46 | $20.00 |
| 0740 | Removal of existing roadway signs (710C000) | LS | 1 | $2,100.00 | $526.50 | $2,379.81 | $506.00 | $531.95 | $1,125.00 |
| 0750 | Roadway sign relocation (711A000) | LS | 1 | $2,100.00 | $585.00 | $2,379.81 | $562.00 | $591.05 | $937.50 |
| 0760 | Removal of existing traffic control unit ( SR-13 (US-43) at mitt lary road) (730A000) | LS | 1 | $6,725.25 | $7,493.00 | $7,621.35 | $5,618.00 | $7,571.38 | $8,006.25 |
| 0770 | Removal of existing traffic control unit (temporary) ( SR-13 (US-43) at mitt lary road PH III NB) (730A053) | LS | 1 | $4,499.25 | $5,013.00 | $5,098.75 | $2,247.00 | $5,065.32 | $5,356.25 |
| 0780 | Removal of existing traffic control unit (temporary) ( SR-13 (US-43) at mitt lary road PH III SB) (730A054) | LS | 1 | $4,499.25 | $5,013.00 | $5,098.75 | $2,247.00 | $5,065.32 | $5,356.25 |
| 0790 | Furnishing and installing traffic control unit ( SR-13 (US-43) at mitt lary road PH III NB) (730C000) | LS | 1 | $21,968 | $24,478 | $24,895 | $16,855 | $24,732 | $26,152 |
| 0800 | Furnishing and installing traffic control unit (temporary)( SR-13 (US- 43) at mitt lary road PH III NB) (730C030) | LS | 1 | $5,314.84 | $5,922.00 | $6,023.01 | $6,180.00 | $5,983.51 | $6,327.19 |
| 0810 | Furnishing and installing traffic control unit (temporary) ( SR-13 (US-43) at mitt lary road PH III SB) (730C031) | LS | 1 | $5,314.84 | $5,922.00 | $6,023.01 | $6,180.00 | $5,983.51 | $6,327.19 |
| 0820 | Metal traffic signal pole foundation (730E000) | EACH | 4 | $9,163.61 | $10,210 | $10,385 | $8,090.00 | $10,317 | $10,909 |
| 0830 | Metal traffic signal strain pole (730G001) | EACH | 4 | $14,982 | $16,693 | $16,978 | $17,753 | $16,867 | $17,835 |
| 0840 | Traffic signal junction box type S1 (730K001) | EACH | 4 | $821.36 | $915.00 | $930.81 | $786.50 | $924.70 | $977.81 |
| 0850 | 1", non-metallic, conduit (730L003) | LF | 25 | $17.69 | $19.00 | $20.05 | $10.15 | $19.92 | $21.06 |
| 0860 | 2", non-metallic, conduit (730L005) | LF | 295 | $7.04 | $8.00 | $7.97 | $14.60 | $7.92 | $8.38 |
| 0870 | Luminaire extension assembly, 12' (730N000) | EACH | 4 | $2,727.38 | $3,039.00 | $3,090.78 | $2,810.00 | $3,070.52 | $3,246.88 |
| 0880 | Vehicular signal head, 12 inch, 3 (730P022) | EACH | 15 | $1,148.18 | $1,279.00 | $1,301.16 | $1,235.00 | $1,292.63 | $1,366.88 |
| 0890 | Controller unit, type NEMA (730R151) | EACH | 1 | $6,873.09 | $7,658.00 | $7,788.88 | $7,135.00 | $7,737.82 | $8,182.25 |
| 0900 | Radar detection system ( SR-13 (US-43) at mitt lary road) (730U400) | LS | 1 | $119,978 | $133,690 | $135,965 | $133,540 | $135,073 | $142,831 |
| 0910 | Furnishing and installing pedestal pole and foundation with pedestrian signal features at pole #4 (730Y620) | LS | 1 | $8,795.59 | $9,800.00 | $9,971.12 | $6,742.00 | $9,902.19 | $10,470 |
| 0920 | Furnishing and installing pedestal pole and foundation with pedestrian signal features at pole #5 (730Y621) | LS | 1 | $8,795.59 | $9,800.00 | $9,967.55 | $6,742.00 | $9,902.19 | $10,471 |
| 0930 | Construction signs (740B000) | SF | 964 | $7.35 | $6.44 | $6.25 | $6.50 | $6.50 | $12.10 |
| 0940 | Channelizing drums (740D000) | EACH | 225 | $36.75 | $75.00 | $59.50 | $25.00 | $52.00 | $90.75 |
| 0950 | Cones (36 inches high) (740E000) | EACH | 100 | $25.20 | $50.00 | $28.56 | $20.00 | $21.28 | $30.25 |
| 0960 | Portable sequential arrow and chevron sign unit (741C010) | EACH | 2 | $2,100.00 | $1,263.00 | $1,130.41 | $1,215.00 | $2,500.00 | $1,149.50 |
| 0970 | Portable changeable message sign, type 2 (742A001) | EACH | 4 | $5,250.00 | $2,667.00 | $2,974.77 | $2,560.00 | $2,695.20 | $3,025.00 |
| 0980 | Uniformed police officer (745A000) | HR | 200 | $65.00 | $92.00 | $89.24 | $85.00 | $85.00 | $81.25 |
| 0990 | 4" electrical conduit, 1 line, type 5 installation (756A022) | LF | 95 | $34.70 | $38.00 | $39.33 | $78.65 | $39.07 | $41.31 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ALDOT's tabulation for this contract. ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
Every contract let that day: ALDOT letting of December 5, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.