Bulls Construction Group, LLC: ALDOT bid record
Bulls Construction Group, LLC submitted 41 bids on Alabama DOT contracts in the data, from 25 FEB 2022 to 28 AUG 2026, and was the low bidder on 8 of them (20%). When it was not low, its total sat a median +27% above the low bid.
- Owner
- Alabama DOT
- Low bid volume
- $14,118,120
- Latest bid
- 28 AUG 2026
- Data through
- 28 AUG 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 8 | 2 | 25% |
| 2023 | 6 | 0 | 0% |
| 2024 | 10 | 2 | 20% |
| 2025 | 12 | 4 | 33% |
| 2026 | 5 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| 0301 | 12 | 2 | 17% |
| 0502 | 6 | 2 | 33% |
| 0105 | 3 | 1 | 33% |
| 0606 | 3 | 0 | 0% |
| 0601 | 3 | 0 | 0% |
| 0102 | 2 | 1 | 50% |
| 0202 | 2 | 0 | 0% |
| 1003 | 1 | 0 | 0% |
| 0103 | 1 | 0 | 0% |
| 1008 | 1 | 0 | 0% |
| 0301, 0305 | 1 | 0 | 0% |
| 1001 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Construction signs | 740B000 | SF | 41 | 13 (32%) | $8.00 | $7.00 |
| Topsoil | 650A000 | CY | 33 | 10 (30%) | $50.00 | $45.00 |
| Removing concrete sidewalk | 206C000 | SY | 24 | 8 (33%) | $35.00 | $40.00 |
| Foundation backfill, commercial | 214B001 | CY | 23 | 8 (35%) | $75.00 | $86.75 |
| Concrete driveway, 6" thick (includes wire mesh) | 618B003 | SY | 16 | 8 (50%) | $110.00 | $125.00 |
| Traffic control markings, class 2, type A | 703A002 | SF | 35 | 7 (20%) | $7.00 | $6.00 |
| Class 4, aluminum flat sign panels (type IV background) | 710A171 | SF | 18 | 7 (39%) | $24.00 | $26.00 |
| Removing concrete driveway | 206C010 | SY | 16 | 7 (44%) | $22.00 | $35.00 |
| Channelizing drums | 740D000 | EACH | 40 | 6 (15%) | $50.00 | $33.00 |
| Silt fence | 665J002 | LF | 30 | 6 (20%) | $6.00 | $5.00 |
| Silt fence removal | 665O001 | LF | 30 | 6 (20%) | $2.00 | $1.45 |
| Slope paving | 614A000 | CY | 20 | 6 (30%) | $800.00 | $790.52 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Gillespie Construction, LLC | 21 | 10 of 21 |
| McElhenney Construction Co., LLC | 13 | 7 of 13 |
| Wiregrass Construction Company, Inc. | 9 | 7 of 9 |
| CB&A Construction, LLC. | 7 | 2 of 7 |
| Abramson, LLC | 5 | 4 of 5 |
| Carcel & G. Construction, LLC | 4 | 1 of 4 |
| Taylor & Miree Construction, Inc | 4 | 1 of 4 |
| Cornerstone Civil Contractors, LLC | 4 | 2 of 4 |
| Grayson Carter & Son Contracting, Inc. | 4 | 4 of 4 |
| Rogers Group, Inc. | 4 | 4 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 AUG 2026 | 20260828030 | 0202 | ROADWAY IMPROVEMENTS/REALIGNMENT (GRADING, DRAINING, PAVEMENT, TRAFFIC SIGNS, TRAFFIC SIGNALS, AND TRAFFIC STRIPE) ON SR-3 (US-31) AT SPARKM | 5 of 8 | $1,387,356 | +19% |
| 27 FEB 2026 | 20260227001 | 0301 | STREETSCAPE IMPROVEMENTS (GRADING, DRAINAGE, PAVEMENT, SIDEWALK INSTALLATION, TRAFFIC SIGNAL UPGRADES, AND LANDSCAPING) ON 41ST FROM THE INT | 2 of 5 | $3,771,062 | +15% |
| 30 JAN 2026 | 20260130025 | 0102 | ROADWAY IMPROVEMENTS/ADDITIONAL LANES AND RESURFACING ON SR-53 FROM THE JUNCTION OF CR-19 (JEFF ROAD) TO THE INTERSECTION OF CR-108 (HARVEST | 4 of 4 | $8,257,977 | +57% |
| 30 JAN 2026 | 20260130064 | 0105 | RESURFACING, SIDEWALK IMPROVEMENTS, AND TRAFFIC STRIPE ON WALNUT STREET FROM SOUTH 8TH STREET TO SOUTH 5TH STREET IN GADSDEN. | 4 of 7 | $1,252,636 | +47% |
| 30 JAN 2026 | 20260130067 | 0301 | ACCESS MANAGEMENT AND INTERCHANGE IMPROVEMENTS (GRADING, DRAINAGE, PAVEMENT, TRAFFIC SIGNALS, AND ITS) ON SR- 79 (TALLAPOOSA STREET) AT THE | 2 of 3 | $2,189,679 | +2.0% |
| 05 DEC 2025 | 20251205008 | 0201 | ROADWAY AND SAFETY (PEDESTRIAN MODIFICATIONS) IMPROVEMENTS ON RICKWOOD ROAD FROM THE JUNCTION OF CHISHOLM ROAD TO THE INTERSECTION OF SR-17 | 4 of 5 | $3,011,309 | +15% |
| 05 DEC 2025 | 20251205016 | 0202 | INTERSECTION MODIFICATIONS (ROUNDABOUT INSTALLATION) ON CR-109 (EAST LIMESTONE ROAD) AT CR-36 (CAPSHAW ROAD) SOUTHEAST OF ATHENS | 4 of 5 | $1,267,263 | +35% |
| 05 DEC 2025 | 20251205059 | 0302 | ROADWAY IMPROVEMENTS (CHANGE TRAFFIC FLOW AND TURN RADIUS) ON SR-53 (US-231 AND US-411)/COURTHOUSE SQUARE AND SR-25 (US-411) IN ASHVILLE | 1 of 5 | $1,263,317 | Low, 6.0% under the second |
| 05 DEC 2025 | 20251205065 | 0502 | INTERSECTION IMPROVEMENTS ON SR-13 (US-43) AT ROSE BOULEVARD/MITT LARY ROAD IN NORTHPORT | 2 of 7 | $2,031,385 | +9.0% |
| 07 NOV 2025 | 20251107006 | 0301 | NORWOOD NEIGHBORHOOD STREETSCAPE PROJECT ON 12TH AVENUE NORTH FROM THE INTERSECTION OF 24TH STREET NORTH TO THE INTERSECTION OF 31ST STREET | 1 of 3 | $1,328,785 | Low, 6.0% under the second |
| 07 NOV 2025 | 20251107200 | 10 | HORIZONTAL CURVE PROJECT ON I-22 AT VARIOUS LOCATIONS IN THE WEST CENTRAL REGION (FAYETTE AREA) AS INDICATED IN THE PLANS | 1 of 3 | $273,000 | Low, 10% under the second |
| 26 SEP 2025 | 20250926010 | 0301 | ROADWAY IMPROVEMENTS ON 22ND STREET NORTH, 12TH AVENUE NORTH, 20TH STREET NORTH, AND FL SHUTTLESWORTH DRIVE/HUNTSVILLE ROAD IN BIRMINGHAM | 2 of 2 | $1,496,656 | +20% |
| 26 SEP 2025 | 20250926011 | 0301 | STREETSCAPE AND SIDEWALK ENHANCEMENTS TO INCLUDE ADA UPGRADE ON VARIOUS ROUTES AT VARIOUS LOCATIONS IN BIRMINGHAM AS INDICATED IN THE PLANS | 2 of 2 | $2,767,191 | +4.0% |
| 26 SEP 2025 | 20250926020 | 0502 | CLEARING ON I-20/I-59 FROM EXIT 76 INTERCHANGE (MP 75.800) TO THE JEFFERSON COUNTY LINE | 1 of 4 | $2,693,567 | Low, 9.0% under the second |
| 26 SEP 2025 | 20250926033 | 0502 | RESURFACE, SIDEWALK INSTALL, AND INTERSECTION IMPROVEMENTS ON MAIN AVENUE FROM THE INTERSECTION OF 5TH STREET TO THE JUNCTION OF SR-6 (US-82 | 3 of 4 | $7,780,944 | +19% |
| 26 SEP 2025 | 20250926200 | 0601 | DEMOLITION AND STRUCTURE REMOVAL ON SR-14 FROM A POINT 0.500 MILE WEST OF THE JUNCTION OF CR-3 (INGRAM ROAD) TO THE JUNCTION OF CR-153 (COOS | 2 of 2 | $175,340 | +8.0% |
| 25 JUL 2025 | 20250725029 | 0502 | INTERSECTION IMPROVEMENTS AND ADDITIONAL THRU LANES ON I-20/I-59 AT THE DAIMLER BENZ BOULEVARD INTERCHANGE (EXIT 89) IN VANCE | 4 of 4 | $2,913,419 | +27% |
| 30 AUG 2024 | 20240830005 | 0301 | INTERSECTION IMPROVEMENTS AND ROUNDABOUT INSTALLATION ON CAHABA ROAD AT CULVER ROAD AND LANE PARK ROAD TO INCLUDE THE RESTRIPING OF THE SR-3 | 2 of 4 | $4,910,827 | +18% |
| 30 AUG 2024 | 20240830008 | 0606 | ROADWAY IMPROVEMENTS/ACCESS MANAGEMENT ON SR-1 (US-431) FROM THE INTERSECTION OF CR-249 TO JUNCTION CR-179 NORTHWEST OF SMITHS STATION | 3 of 3 | $2,215,105 | +27% |
| 30 AUG 2024 | 20240830009 | 0601 | ROADWAY IMPROVEMENTS/ACCESS MANAGEMENT ON SR-6 (US-82) FROM THE JUNCTION OF BASS PRO SHOP BOULEVARD IN PRATTVILLE TO THE I-65 SOUTHBOUND EXI | 4 of 5 | $691,106 | +34% |
| 30 AUG 2024 | 20240830021 | 0705 | ROADWAY IMPROVEMENTS/ACCESS MANAGEMENT ON SR-10 (US-231) FROM THE JUNCTION OF SR-87 TO THE JUCTION OF INDUSTRIAL PARK BOULEVARD | 3 of 3 | $2,923,705 | +9.0% |
| 26 JUL 2024 | 20240726004 | 0301 | ROADWAY IMPROVEMENTS AND SIDEWALK INSTALLATION ON CR-42 (MASSEY ROAD) FROM THE JUNCTION OF SR-3 (US-31) TO THE JUNCTION OF CR-99 (COLUMBIANA | 2 of 4 | $5,118,093 | +10% |
| 26 JUL 2024 | 20240726023 | 0606 | RESURFACE, SIDEWALK INSTALL, TRAFFIC SIGNAL UPGRADES, STRIPE ON PEPPERELL PARKWAY FROM THE JUNCTION OF COMMERCE DRIVE TO THE JUNCTION OF LOW | 2 of 4 | $2,560,147 | +1.0% |
| 26 JUL 2024 | 20240726026 | 0502 | ACCESS MANAGEMENT IMPROVEMENTS ON SR-216 FROM THE JUNCTION OF COVERED BRIDGE ROAD TO THE JUNCTION OF GEORGE RICHMOND PARKWAY IN BROOKWOOD | 1 of 5 | $1,469,300 | Low, 2.0% under the second |
| 31 MAY 2024 | 20240531007 | 0603 | ROADWAY IMPROVEMENTS (ROUNDABOUT INSTALLATIONS) ON SR-126 AT SR-8 (US-80) AND ON SR-8 (US-80) AT MARLER ROAD EAST OF MONTGOMERY | 4 of 5 | $6,177,426 | +27% |
How this record was read
ALDOT bid tabulation PDFs, one per letting, January 2022 to August 2026, with bidder names and totals from each letting's vendor ranking. Every bid matched its published total.
- Every bid counted here matched its published total to within one dollar; ALDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.